June 2013 Filing Log
The documents are listed by date, docket number(s), (number of copies filed),
NAME OF DOCUMENT, and a description
June 2013 | |
---|---|
6/3/2013 | 08-046-01 (6) AMENDED STIPULATION REGARDING STAY OF USF PAYBACK In the Matter of the Application for the Increase of Rates and Charges by Manti Telephone Company |
6/3/2013 | 08-046-01 (1) REPORTER’S TRANSCRIPT RE: JUNE 3, 2013 In the Matter of the Application for the Increase of Rates and Charges by Manti Telephone Company |
6/3/2013 | 13-2180-T01 (3) AMENDED TARIFF SHEET Re: All West Communications, Inc. – This filing revises All West’s Terminating Local Transport Termination Charge from $0.026/min to $0.002171/min., and adds a rate element for Local Transport Facility Charges for originating and terminating traffic at the rate of $0.000418 per mile. |
6/3/2013 | 10-2528-01 (6) COMMENTS FROM CENTURYLINK In the Matter of the Resolution of Certain Issues Related to the Designation of a Common Carrier as an Eligible Telecommunications Carrier |
6/3/2013 | 10-2528-01 (6) COMMENTS OF UTAH RURAL TELECOM ASSOCIATION ON THE DIVISION OF PUBLIC UTILITIES’ LIFELINE PROPOSAL In the Matter of the Resolution of Certain Issues Related to the Designation of a Common Carrier as an Eligible Telecommunications Carrier |
6/3/2013 | 10-2528-01 (11) COMMENTS FROM OCS In the Matter of the Resolution of Certain Issues Related to the Designation of a Common Carrier as an Eligible Telecommunications Carrier |
6/4/2013 | 13-999-02 (1) QUESTAR GAS COMPANY’S AFFIDAVIT OF PUBLICATION In the Matter of the Miscellaneous Correspondence and Reports Regarding Gas Utility Services; 2013 |
6/4/2013 | 12-035-100 (13) ERRATA TO THE SURREBUTTAL TESTIMONY OF RANDALL J. FALKENBERG ORIGINALLY FILED ON MAY 30, 2013 In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/4/2013 | 13-2565-01 (6) APPLICATION In the Matter of the Application of Allard Ranch Water Company for an Exemption from Public Service Commission Regulation |
6/4/2013 | 12-999-10 (6) UTAH RURAL TELECOM ASSOCIATION’S COMMENTS In the Matter of the Consideration of Potential Changes in the Regulation of the Utah Universal Public Telecommunications Service Support Fund, in Response to Recent Changes in the Federal Universal Service Fund Program |
6/4/2013 | 12-999-10 (6) COMMENTS OF COMCAST PHONE OF UTAH, LLC ON THE DRAFT REPORT OF THE DIVISION OF PUBLIC UTILITIES In the Matter of the Consideration of Potential Changes in the Regulation of the Utah Universal Public Telecommunications Service Support Fund, in Response to Recent Changes in the Federal Universal Service Fund Program |
6/4/2013 | 12-999-10 (6) CENTURYLINK’S COMMENTS ON THE DIVISION’S DRAFT REPORT In the Matter of the Consideration of Potential Changes in the Regulation of the Utah Universal Public Telecommunications Service Support Fund, in Response to Recent Changes in the Federal Universal Service Fund Program |
6/4/2013 | 12-999-10 (5) AARP’S COMMENTS ON THE DIVISION OF PUBLIC UTILITIES’ DRAFT REPORT In the Matter of the Consideration of Potential Changes in the Regulation of the Utah Universal Public Telecommunications Service Support Fund, in Response to Recent Changes in the Federal Universal Service Fund Program |
6/4/2013 | 13-2204-01 (6) SETTLEMENT STIPULATION In the Matter of the Petition of Qwest Communications Company, LLC to Amend its Certificate of Public Convenience and Necessity No. 2204 |
6/4/2013 | 13-2564-01 (6) APPLICATION In the Matter of the Application of Access One, Inc. for a Certificate of Public Convenience and Necessity to Provide Facilities-Based and Resold Local Exchange and Interexchange Telecommunications Services in the State of Utah CONTAINS PROPRIETARY EXHIBITS |
6/5/2013 | 12-035-100 (11) ERRATA TO UCE EXHIBIT 5.1(R) In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/6/2013 | 13-035-69 (12) COMMENTS FROM OCS In the Matter of Rocky Mountain Power’s Fossil Fuel Heat Rate Improvement Plan for 2013 |
6/6/2013 | 12-2554-01 (1) CORRESPONDENCE FROM BUDGET PREPAY INC. In the Matter of Budget PrePay, Inc. d/b/a Budget Mobile’s Petition for Limited Designation as a Non-Rural Wireless Eligible Telecommunications Carrier |
6/7/2013 | 13-2301-P03 (1) PRICE LIST Re: SBC Long Distance, LLC – The purpose of this filing is to increase the Business Message Toll Service (MTS) minimum usage charge (MUC), modify the MTS MUC language and remove the MUC from AT&T Long Distance Toll Free services. |
6/7/2013 | 13-2204-P02 (1) PRICE LIST Re: Qwest Communications Company, LLC – The purpose of this filing is to introduce a second option for the business calling plan, Block of Time for Integrated Services. |
6/7/2013 | 13-2423-01 (6) COMMENTS FROM DPU In the Matter of the Application of Cedar Ridge Distribution Company for an Increase in Rates for Water Usage Over 12,000 Gallons per Month to .50 per 1,000 Gallons |
6/10/2013 | 10-2528-01 (6) CENTURYLINK’S REPLY COMMENTS In the Matter of the Resolution of Certain Issues Related to the Designation of a Common Carrier as an Eligible Telecommunications Carrier |
6/10/2013 | 10-2528-01 (6) REPLY COMMENTS OF UTAH RURAL TELECOM ASSOCIATION ON THE DIVISION OF PUBLIC UTILITIES’ LIFELINE PROPOSAL In the Matter of the Resolution of Certain Issues Related to the Designation of a Common Carrier as an Eligible Telecommunications Carrier |
6/10/2013 | 13-035-19 (1) REDACTED COMMENTS FROM DPU In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Steven Cote |
6/10/2013 | 13-035-19 (1) CONFIDENTIAL COMMENTS FROM DPU In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Steven Cote |
6/10/2013 | 13-035-78 (1) REDACTED COMMENTS FROM DPU In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Jason Van Orman |
6/10/2013 | 13-035-78 (1) CONFIDENTIAL COMMENTS FROM DPU In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Jason Van Orman |
6/10/2013 | 12-035-92 (11) REQUEST FOR REVIEW OR REHEARING OF WESTERN RESOURCE ADVOCATES In the Matter of the Voluntary Request of Rocky Mountain Power for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
6/10/2013 | 13-2452-01 and 13-2474-01 (6) NOTICE OF CONSUMMATION In the Matter of the Joint Application of AmericaTel Corporation, Matrix Telecom, Inc., and Impact Telecom, Inc. for Approval of the Transfer of Control of AmericaTel Corporation and Matrix Telecom, Inc. to Impact Telecom, Inc. |
6/10/2013 | 13-2249-01, 13-2441-01, and 13-2538-01 (8) JOINT NOTIFICATION OF MCLEODUSA TELECOMMUNICATIONS SERVICES, LLC; PAETEC COMMUNICATIONS, INC.; AND WINDSTREAM NUVOX, INC. In the Matter of the Joint Notification of McLeodUSA Telecommunications Services, LLC; PAETEC Communications, Inc.; and Windstream NuVox, Inc. of a Pro Forma Intra-Corporate Transaction |
6/10/2013 | 13-035-94 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/10/2013 | 13-035-95 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/10/2013 | 13-035-96 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/10/2013 | 13-035-97 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/10/2013 | 13-035-98 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/11/2013 | 13-035-58 (12) COMMENTS FROM DPU In the Matter of the Application of Rocky Mountain Power for Approval of its Asset Transfer Agreement with the City of Blanding, Utah |
6/11/2013 | 13-2423-01 (6) COMMENTS FROM DPU In the Matter of the Application of Cedar Ridge Distribution Company for an Increase in Rates for Water Usage Over 12,000 Gallons per Month to .50 per 1,000 Gallons |
6/11/2013 | 13-035-90 (6) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/11/2013 | 13-035-91 (6) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/11/2013 | 13-035-92 (6) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/11/2013 | 13-035-93 (6) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/11/2013 | 13-2204-P02 (1) AMENDED PRICE LIST PAGES Re: Qwest Communications Company, LLC – The purpose of this filing is to introduce a second option for the business calling plan, Block of Time for Integrated Services. |
6/11/2013 | 13-041-T04 (3) TARIFF Re: Citizens Telecommunications Company of Utah d/b/a Frontier Communications of Utah – The purpose of this filing is to decrease the Hearing or Speech Impaired Surcharge, pursuant to Rule 746-343-15. |
6/11/2013 | 13-050-T02 (3) TARIFF Re: Navajo Communications Company – The purpose of this filing is to decrease the Hearing or Speech Impaired Surcharge, pursuant to Rule 746-343-15. |
6/11/2013 | 13-999-01 (12) COMMENTS FROM DPU In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2013 |
6/11/2013 | 13-2431-01 (6) COMMENTS FROM DPU In the Matter of the Joint Application of TNCI Operating Company LLC, Assignee, and Trans National Communications International, Inc., Assignor, for Approval of TNCI Operating Company LLC to Acquire Customers and Certain Assets of Trans National Communications International, Inc.; and Application of TNCI Operating Company LLC for a Certificate of Public Convenience and Necessity |
6/11/2013 | 12-057-07 (7) QUESTAR GAS COMPANY’S IRP THIRD QUARTER VARIANCE REPORT COVERING THE PERIOD FROM DECEMBER 2012 THROUGH FEBRUARY 2013 In the Matter of Questar Gas Company’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2012 to May 31, 2013 |
6/11/2013 | 13-999-01 (1) CORRESPONDENCE FROM KEN SHARP RE: UTILITY MULTIPLIERS In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2013 |
6/12/2013 | 13-999-05 (5) COMMENTS FROM DPU In the Matter of the 2013 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status CONTAINS A PROPRIETARY EXHIBIT |
6/12/2013 | 13-035-89 (12) COMMENTS FROM DPU In the Matter of the Application of Rocky Mountain Power for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140 |
6/12/2013 | 13-035-89 (16) COMMENTS OF THE UTAH ASSOCIATION OF ENERGY USERS IN SUPPORT OF APPLICATION In the Matter of the Application of Rocky Mountain Power for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140 |
6/12/2013 | 13-035-89 (11) COMMENTS FROM OCS In the Matter of the Application of Rocky Mountain Power for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140 |
6/12/2013 | 12-2553-01 (1) REPORTER’S TRANSCRIPT RE: MAY 29, 2013 In the Matter of the Petition of Telrite Corporation d/b/a Life Wireless for Limited Designation as an Eligible Telecommunications Carrier |
6/12/2013 | 12-2443-01 (1) REPORTER’S TRANSCRIPT RE: MAY 39, 2013 In the Matter of the Application of WaterPro Inc. for a Culinary Water Rate Case |
6/12/2013 | 13-057-03 (1) REPORTER’S TRANSCRIPT RE: MAY 29, 2013 In the Matter of the Pass-Through Application of Questar Gas Company for an Adjustment in Rates and Charges for Natural Gas Service in Utah |
6/12/2013 | 13-035-80 (6) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/13/2013 | 12-035-100 (1) COMMENTS FROM RENEWABLETECH VENTURES In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/13/2013 | 12-035-100 (1) REPORTER’S TRANSCRIPT RE: JUNE 6, 2013 In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/13/2013 | 13-2195-01 (1) FORMAL COMPLAINT In the Matter of the Formal Complaint of Rodney Dansie against Hi-Country Estates Homeowners Association |
6/13/2013 | 13-051-01 (6) COMMENTS FROM DPU In the Matter of the Petition of Beehive Telephone, Inc. for an Immediate Increase in Rates; and Notice to the Commission and the Company’s Subscribers |
6/13/2013 | 13-057-02 (8) NOTICE OF APPEARANCE OF COUNSEL FOR FUEL FREEDOM FOUNDATION In the Matter of the Investigation Required by S.B. 275, Energy Amendments, Addressing Cleaner Air through the Enhanced use of Alternative Fuel Vehicles |
6/13/2013 | 13-057-04 (6) COMMENTS FROM DPU In the Matter of Questar Gas Company’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2013 to May 31, 2014 |
6/13/2013 | 13-2540-01 (6) PROPOSED STIPULATION AND SETTLEMENT AGREEMENT AND JOINT MOTION FOR EXPEDITED HEARING DATE In the Matter of the Application of Nexus Communications, Inc. for Designation as an Eligible Telecommunications Carrier for Low Income Support Only |
6/13/2013 | 13-576-T02 (3) COMMENTS FROM DPU Re: Skyline Telecom – Proposed revisions are made in compliance with current Federal Communications Commission (FCC) rules governing intercarrier compensation. |
6/13/2013 | 13-576-T01 (3) COMMENTS FROM DPU Re: Skyline Telecom – Skyline is revising its tariff to grandfather its Emergency Line Service. |
6/13/2013 | 13-040-T01 (3) COMMENTS FROM DPU Re: Central Utah Telephone, Inc. – Central Utah is revising its tariff to grandfather its Emergency Line Service. |
6/13/2013 | 13-040-T02 (3) COMMENTS FROM DPU Re: Central Utah Telephone, Inc. – Proposed revisions are made in compliance with current Federal Communications Commission (FCC) rules governing intercarrier compensation. |
6/13/2013 | 13-2201-T01 (3) COMMENTS FROM DPU Re: Bear Lake Communications, Inc. – Bear Lake is revising its tariff to grandfather its Emergency Line Service. |
6/13/2013 | 13-2201-T02 (3) COMMENTS FROM DPU Re: Bear Lake Communications, Inc. – Proposed revisions are made in compliance with current Federal Communications Commission (FCC) rules governing intercarrier compensation. |
6/13/2013 | 13-999-01 (11) CORRESPONDENCE FROM PACIFICORP RE: REQUEST FOR TECHNICAL CONFERENCE ON ENERGY IMBALANCE MARKET In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2013 |
6/14/2013 | 13-049-02 (1) JUNE PAYMENTS In the Matter of the 2013 Qwest Performance Assurance Plan (QPAP) |
6/14/2013 | 13-049-13 (6) COMMENTS FROM DPU In the Matter of the Petition of Qwest Corporation dba CenturyLink QC for Approval to Deviate from and/or Waive the End-User Service Quality Rules Only Applicable to CenturyLink |
6/14/2013 | 13-2035-01 (11) APPENDIX A RE: LISA TORMOEN HICKEY In the Matter of PacifiCorp’s 2013 Integrated Resource Plan |
6/14/2013 | 12-035-100 (11) COMMENTS OF INTERWEST ENERGY ALLIANCE In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/14/2013 | 13-2506-01 (6) DIRECT TESTIMONY OF MARK A. LONG In the Matter of the Application of Willow Creek Water Company for a General Rate Increase |
6/14/2013 | 13-2180-T01 (3) COMMENTS FROM DPU Re: All West Communications, Inc. – This filing revises All West’s Terminating Local Transport Termination Charge from $0.026/min to $0.002171/min., and adds a rate element for Local Transport Facility Charges for originating and terminating traffic at the rate of $0.000418 per mile. |
6/14/2013 | 13-041-T03 (3) COMMENTS FROM DPU Re: Citizens Telecommunications Company of Utah d/b/a Frontier Communications of Utah – The purpose of this filing is to revise the tariff rates as required in the FCC’s November 18, 2011 Report and Order and Further Notice of Proposed Rulemaking in WC Docket Nos. 10-90, etc. (FCC 11-161). |
6/14/2013 | 13-050-T02 (3) COMMENTS FROM DPU Re: Navajo Communications Company – The purpose of this filing is to decrease the Hearing or Speech Impaired Surcharge, pursuant to Rule 746-343-15. |
6/14/2013 | 13-041-T04 (3) COMMENTS FROM DPU Re: Citizens Telecommunications Company of Utah d/b/a Frontier Communications of Utah – The purpose of this filing is to decrease the Hearing or Speech Impaired Surcharge, pursuant to Rule 746-343-15. |
6/17/2013 | 13-057-02 (1) EMAIL COMMENTS FROM MARK D. LARSEN In the Matter of the Investigation Required by S.B. 275, Energy Amendments, Addressing Cleaner Air through the Enhanced use of Alternative Fuel Vehicles |
6/17/2013 | 13-2035-01 (6) PETITION FOR LEAVE TO INTERVENE OF WESTERN RESOURCE ADVOCATES In the Matter of PacifiCorp’s 2013 Integrated Resource Plan |
6/17/2013 | 13-051-01 (1) COMMENTS FROM VERONICA DOUGLASS In the Matter of the Petition of Beehive Telephone Company, Inc. for an Increase in Rates Effective July 1, 2013 |
6/17/2013 | 13-035-63 (13) COMMENTS FROM DPU In the Matter of Rocky Mountain Power’s 2013 Avoided Cost Input Changes Quarterly Compliance Filing |
6/17/2013 | 09-057-16 (8) COMMENTS FROM DPU In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications |
6/17/2013 | 13-035-89 (11) CORRECTIONS TO ROCKY MOUNTAIN POWER’S PROPOSED SCHEDULE NO. 140, NON-RESIDENTIAL ENERGY EFFICIENCY In the Matter of the Application of Rocky Mountain Power for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140 |
6/17/2013 | 13-2419-T01 (3) TARIFF Re: Direct Communications Cedar Valley, LLC – The purpose of this filing on behalf of Direct Communications Cedar Valley is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-051-T01 (3) TARIFF Re: Beehive Telephone Company, Inc. – The purpose of this filing on behalf of Beehive Telephone Company-UT is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-043-T01 (3) TARIFF Re: Gunnison Telephone Company – The purpose of this filing on behalf of Gunnison Telephone Company is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-046-T01 (3) TARIFF Re: Manti Telephone Company – The purpose of this filing on behalf of Manti Telephone Company is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-053-T01 (3) TARIFF Re: UBTA-UBET Communications, Inc. – The purpose of this filing on behalf of UBTA-UBET Communications, Inc. (dba Strata Networks) Company is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-2450-P01 (3) PRICE LIST Re: Preferred Long Distance, Inc. – With this submission, Preferred complies with the July 1, 2013 interstate access rate benchmarking requirement set forth in Section 51.911(c) of the Federal Communications Commission’s (“FCC”) rules, 47 C.F.R. § 51.911(c), Access Reciprocal Compensation Rates for Competitive LECs, promulgated under the USF/ICC Transformation Order, as amended. |
6/17/2013 | 13-042-T01 (1) TARIFF Re: Emery Telephone – This revised tariff filing is submitted to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-2302-T01 (1) TARIFF Re: Carbon/Emery Telcom, Inc. – This revised tariff filing is submitted to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-2303-T01 (1) TARIFF Re: Hanksville Telcom, Inc. – This revised tariff filing is submitted to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/17/2013 | 13-035-101 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/17/2013 | 13-035-102 (60 PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/17/2013 | 13-035-103 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/17/2013 | 13-035-104 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/17/2013 | 13-035-105 (6) PETITION OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/18/2013 | 13-035-71 (12) COMMENTS FROM DPU In the Matter of Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |
6/18/2013 | 13-035-71 (11) COMMENTS FROM OCS In the Matter of Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |
6/18/2013 | 13-052-T02 (3) COMMENTS FROM DPU Re: South Central Utah Telephone Association, Inc. – This filing is in compliance with the FCC USF/ICC Transformation Orders. |
6/18/2013 | 12-2195-01, 12-2195-T01, and 13-2195-T01 (7) COMMENTS FROM DPU In the Matter of Hi-Country Estates Homeowners Association’s Notice of Intent to File General Rate Case AND Tariff Name: Hi-Country Estates Homeowners Association Tariff No. 1 for Water Service AND Tariff Name: Hi-Country submits this updated tariff to reflect changes suggested by Hi-Country’s Board of Directors and legal counsel. |
6/19/2013 | 13-2204-01 (1) REPORTER’S TRANSCRIPT RE: JUNE 11, 2013 In the Matter of the Petition of Qwest Communications Company, LLC to Amend its Certificate of Public Convenience and Necessity No. 2204 |
6/19/2013 | 13-051-01 (5) PROOF OF CUSTOMER NOTICE In the Matter of the Petition of Beehive Telephone Company, Inc. for an Increase in Rates Effective July 1, 2013 |
6/19/2013 | 13-2201-T01, 13-040-T01, and 13-576-T01 (6) MOTION FOR CONTINUANCE OF HEARING SCHEDULED FOR JUNE 25, 2013 Re: Bear Lake Communications, Inc. – Bear Lake is revising its tariff to grandfather its Emergency Line Service AND Re: Central Utah Telephone, Inc. – Central Utah is revising its tariff to grandfather its Emergency Line Service AND Re: Skyline Telecom – Skyline is revising its tariff to grandfather its Emergency Line Service. |
6/19/2013 | 13-057-T03 (5) TARIFF Re: Questar Gas Company – This filing is to comply with the order issued on June 17, 2013 in Docket No. 13-057-03, Application of Questar Gas Company for an Adjustment in Rates and Charges for Natural Gas Service in Utah. |
6/20/2013 | 13-035-80 (6) PETITION TO WITHDRAW OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service |
6/20/2013 | 13-035-70 (11) COMMENTS FROM IBEW LOCAL 57 In the Matter of Rocky Mountain Power’s Service Quality Review Report |
6/20/2013 | 13-053-T01 (3) COMMENTS FROM DPU Re: UBTA-UBET Communications, Inc. – The purpose of this filing on behalf of UBTA-UBET Communications, Inc. (dba Strata Networks) Company is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/20/2013 | 13-043-T01 (3) COMMENTS FROM DPU Re: Gunnison Telephone Company – The purpose of this filing on behalf of Gunnison Telephone Company is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/20/2013 | 13-046-T01 (3) COMMENTS FROM DPU Re: Manti Telephone Company – The purpose of this filing on behalf of Manti Telephone Company is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/20/2013 | 13-051-T01 (3) COMMENTS FROM DPU Re: Beehive Telephone Company, Inc. – The purpose of this filing on behalf of Beehive Telephone Company-UT is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/20/2013 | 13-2419-T01 (3) COMMENTS FROM DPU Re: Direct Communications Cedar Valley, LLC – The purpose of this filing on behalf of Direct Communications Cedar Valley is to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/20/2013 | 13-999-06 (1) ANNUAL CAF ICC REPORT FROM UNION TELEPHONE COMPANY In the Matter of the 2013 Universal Service Fund (USF) CAF ICC Review |
6/20/2013 | 13-999-06 (1) ANNUAL CAF ICC REPORT FROM FRONTIER COMMUNICATIONS CORPORATION In the Matter of the 2013 Universal Service Fund (USF) CAF ICC Review |
6/20/2013 | 13-999-06 (1) ANNUAL CAF ICC REPORT FROM EMERY TELEPHONE, DBA EMERY TELCOM In the Matter of the 2013 Universal Service Fund (USF) CAF ICC Review |
6/20/2013 | 13-035-89 (11) COMMENTS FROM OCS In the Matter of the Application of Rocky Mountain Power for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140 |
6/21/2013 | 13-999-06 (1) ANNUAL CAF ICC REPORT FROM DIRECT COMMUNICATIONS – CEDAR VALLEY In the Matter of the 2013 Universal Service Fund (USF) CAF ICC Review |
6/21/2013 | 13-035-32 (12) UTAH DIVISION OF PUBLIC UTILITIES’ MOTION FOR EXTENSION OF TIME TO FILE AUDIT REPORT AND DIRECT TESTIMONY In the Matter of the Application of Rocky Mountain Power to Increase the Deferred EBA Rate through the Energy Balancing Account Mechanism |
6/21/2013 | 13-035-81 (6) PETITION TO WITHDRAW OF ROCKY MOUNTAIN POWER In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Karen Kofford & Deanne Ercanbrack |
6/21/2013 | 13-035-94 (4) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Velvet King |
6/21/2013 | 13-035-95 (1) CORRESPONDENCE FROM TAMARA SHAW In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Gavin Shaw |
6/21/2013 | 13-035-95 (4) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Gavin Shaw |
6/21/2013 | 13-035-96 (4) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Margaret Ann Smith |
6/21/2013 | 13-035-97 (4) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Akeripa Tau |
6/21/2013 | 13-035-98 (4) COMMENTS FROM DPU In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Susan L. Thompson |
6/21/2013 | 13-035-98 (1) CORRESPONDENCE FROM SUSAN L. THOMPSON In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service to Susan L. Thompson |
6/21/2013 | 13-035-02 (13) DIRECT TESTIMONY OF WILLIAM DUNKEL ON BEHALF OF THE UTAH DIVISION OF PUBLIC UTILITIES In the Matter of the Application of Rocky Mountain Power for Authority to Change its Depreciation Rates Effective January 1, 2014 |
6/21/2013 | 13-035-02 (13) PREFILED DIRECT TESTIMONY OF NEAL TOWNSEND In the Matter of the Application of Rocky Mountain Power for Authority to Change its Depreciation Rates Effective January 1, 2014 |
6/21/2013 | 13-035-02 (13) DIRECT TESTIMONY OF DAVID T. THOMSON In the Matter of the Application of Rocky Mountain Power for Authority to Change its Depreciation Rates Effective January 1, 2014 |
6/21/2013 | 13-035-02 (11) DIRECT DEPRECIATION TESTIMONY OF DANIEL E. GIMBLE In the Matter of the Application of Rocky Mountain Power for Authority to Change its Depreciation Rates Effective January 1, 2014 |
6/21/2013 | 13-035-02 (13) DIRECT TESTIMONY OF JACOB POUS In the Matter of the Application of Rocky Mountain Power for Authority to Change its Depreciation Rates Effective January 1, 2014 |
6/21/2013 | 13-2245-P01 (1) PRICE LIST Re: MCImetro Access Transmission Services LLC – In compliance with the November 18, 2011 Federal Communications Commission Report and Order, 26 FCC Rcd 17663, Verizon Access’s tariff. |
6/24/2013 | 13-2564-01 (6) COMMENTS FROM DPU In the Matter of the Application of Access One, Inc. for a Certificate of Public Convenience and Necessity to Provide Facilities-Based and Resold Local Exchange and Interexchange Telecommunications Services in the State of Utah |
6/24/2013 | 13-049-13 (6) COMMENTS FROM DPU In the Matter of the Petition of Qwest Corporation dba CenturyLink QC for Approval to Deviate from and/or Waive the End-User Service Quality Rules Only Applicable to CenturyLink |
6/24/2013 | 13-051-01 (6) MOTION FOR PROTECTIVE ORDER In the Matter of the Petition of Beehive Telephone Company, Inc. for an Increase in Rates Effective July 1, 2013 |
6/24/2013 | 12-2554-01 (6) COMMENTS FROM DPU In the Matter of Budget PrePay, Inc. d/b/a Budget Mobile’s Petition for Limited Designation as a Non-Rural Wireless Eligible Telecommunications Carrier |
6/24/2013 | 13-035-T09 (3) COMMENTS FROM DPU Re: PacifiCorp – In its February 12, 2009 order in Docket No. 08-035-78 on Net Metering Services, the Utah Commission directed the Company to calculate and file Schedule 37 avoided costs annually in order to establish the value or credit for net excess generation of large commercial customers under the Schedule 135 Net Metering Service. |
6/24/2013 | 13-049-P02 (1) PRICE LIST Re: Qwest Corporation d/b/a CenturyLink QC – This filing increases rates for specific residence and business services. |
6/24/2013 | 13-2249-P01 (3) PRICE LIST Re: McLeodUSA Telecommunications Services, L.L.C. – The purpose of this filing is to implement Step 2 of the Federal Communications Commission Report and Order in WC Docket Nos. 10-90, etc., FCC No. 11-161 released (Nov. 18, 2011). |
6/24/2013 | 13-2546-P01 (3) PRICE LIST Re: Onvoy, Inc. – In compliance with the second phase of the FCC ICC Reform Order, FCC 11-161, issued November 18, 2011, the filing revises the terminating rates to mirror the interstate tariff. |
6/24/2013 | 13-2515-P01 (3) PRICE LIST Re: Broadvox-CLEC, LLC – The purpose of this filing is to introduce the Company’s switched access services. |
6/24/2013 | 13-035-T09 (3) COMMENTS FROM RMP Re: PacifiCorp – In its February 12, 2009 order in Docket No. 08-035-78 on Net Metering Services, the Utah Commission directed the Company to calculate and file Schedule 37 avoided costs annually in order to establish the value or credit for net excess generation of large commercial customers under the Schedule 135 Net Metering Service. CONTAINS PROPRIETARY EXHIBITS |
6/24/2013 | 13-035-100 (1) REPORTER’S TRANSCRIPT RE: JUNE 13, 2013 In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/25/2013 | 13-035-T08 (3) COMMENTS FROM DPU Re: PacifiCorp – In the Matter of Rocky Mountain Power’s Proposed Changes to Electric Service Regulation No. 3 to Indicate Customers are Responsible for Reasonable Court Costs, Attorneys Fees and/or Collection Agency Fees Incurred in the Collection of Unpaid Debt Following the Due Date of Their Closing Bill |
6/25/2013 | 13-057-T03 (6) COMMENTS FROM DPU Re: Questar Gas Company – This filing is to comply with the order issued on June 17, 2013 in Docket No. 13-057-03, Application of Questar Gas Company for an Adjustment in Rates and Charges for Natural Gas Service in Utah. |
6/25/2013 | 13-035-T08 (11) COMMENTS FROM OCS Re: PacifiCorp – In the Matter of Rocky Mountain Power’s Proposed Changes to Electric Service Regulation No. 3 to Indicate Customers are Responsible for Reasonable Court Costs, Attorneys Fees and/or Collection Agency Fees Incurred in the Collection of Unpaid Debt Following the Due Date of Their Closing Bill |
6/25/2013 | 13-049-13 (6) REPLY COMMENTS In the Matter of the Petition of Qwest Corporation dba CenturyLink QC for Approval to Deviate from and/or Waive the End-User Service Quality Rules Only Applicable to CenturyLink |
6/25/2013 | 12-035-92 (11) ROCKY MOUNTAIN POWER’S RESPONSE TO WESTERN RESOURCE ADVOCATES’ REQUEST FOR REHEARING In the Matter of the Voluntary Request of Rocky Mountain Power for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
6/25/2013 | 13-035-T08 (11) COMMENTS FROM RMP Re: PacifiCorp – In the Matter of Rocky Mountain Power’s Proposed Changes to Electric Service Regulation No. 3 to Indicate Customers are Responsible for Reasonable Court Costs, Attorneys Fees and/or Collection Agency Fees Incurred in the Collection of Unpaid Debt Following the Due Date of Their Closing Bill |
6/26/2013 | 13-087-P13 (1) PRICE LIST Re: AT&T Corp. – This filing consolidates and removes language from several long distance plans when customers do not select AT&T for their local service. |
6/26/2013 | 13-087-P14 (1) PRICE LIST Re: AT&T Corp. – This filing decreases Prepaid Phone Service cards to one minute/unit of use for AT&T-branded prepaid cards. |
6/26/2013 | 13-087-P15 (1) PRICE LIST Re: AT&T Corp. – This filing implements cross-referencing language to point to the FCC interstate tariff for the FCC Step 2 changes. |
6/26/2013 | 13-2558-P02 (1) PRICE LIST Re: Teleport Communications America, LLC – This filing implements cross-referencing language to point to the FCC interstate tariff for the FCC Step 2 changes. |
6/26/2013 | 13-2452-P01 (3) PRICE LIST Re: Matrix Telecom, Inc. – This filing implements the Federal Communications Commission’s second phase of the intercarrier compensation restructuring, WC Docket No. 07-135 et al., mirroring interstate access rates and rate structures. |
6/26/2013 | 13-2405-P01 (3) PRICE LIST Re: ACN Communication Services, Inc. – This filing revises the terminating switched access rates to mirror interstate access rates and rate structure in compliance with the requirements of the Federal Communications Commission Report and Order in WC Docket No. 10-90, et. al., FCC No. 11-161. |
6/26/2013 | 13-2478-P01 (3) PRICE LIST Re: Neutral Tandem-Utah, LLC – This filing implements the Federal Communications Commission’s second phase of the intercarrier compensation restructuring, WC Docket No. 07-135 et al., mirroring interstate access rates and rate structures. |
6/26/2013 | 13-2413-P01 (3) PRICE LIST Re: BullsEye Telecom, Inc. – This filing revises language under Identification and Rating of VoIP-PSTN Traffic and revises the terminating switched access rates to mirror interstate access rates and rate structure in compliance with the requirements of the Federal Communications Commission Report and Order in WC Docket No. 10-90, et. al., FCC No. 11-161. |
6/26/2013 | 13-2266-P01 (3) PRICE LIST Re: Level 3 Communications, LLC – The tariff changes herein include the following: Rate reductions as mandated by the Federal Communications Commission (“FCC”) in Connect America Fund, WC Docket No. 10-90, Report and Order and Further Notice of Proposed Rulemaking, FCC 11-161 (released Nov. 18, 2011). |
6/26/2013 | 13-051-01 (5) CORRESPONDENCE FROM DAVID R. IRVINE In the Matter of the Petition of Beehive Telephone Company, Inc. for an Increase in Rates Effective July 1, 2013 |
6/27/2013 | 13-035-32 (11) UTAH DIVISION OF PUBLIC UTILITIES WITHDRAWAL OF ITS MOTION FOR EXTENSION OF TIME TO FILE AUDIT REPORT AND DIRECT TESTIMONY AND MOTION FOR AMENDED SCHEDULE In the Matter of the Application of Rocky Mountain Power to Increase the Deferred EBA Rate through the Energy Balancing Account Mechanism |
6/27/2013 | 12-035-100 (11) POST-HEARING BRIEF OF SUNEDISON, LLC In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/27/2013 | 13-2249-01, 13-2441-01, and 13-2538-01 (7) COMMENTS FROM DPU In the Matter of the Joint Notification of McLeodUSA Telecommunications Services, LLC; PAETEC Communications, Inc.; and Windstream NuVox, Inc. of a Pro Forma Intra-Corporate Transaction AND In the Matter of the Joint Notification of McLeodUSA Telecommunications Services, LLC; PAETEC Communications, Inc.; and Windstream NuVox, Inc. of a Pro Forma Intra-Corporate Transaction AND In the Matter of the Joint Notification of McLeodUSA Telecommunications Services, LLC; PAETEC Communications, Inc.; and Windstream NuVox, Inc. of a Pro Forma Intra-Corporate Transaction |
6/27/2013 | 12-035-100 (11) POST-HEARING BRIEF In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/27/2013 | 12-035-100 (11) UTAH CLEAN ENERGY – POST-HEARING BRIEF In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/27/2013 | 12-035-100 (11) SCATEC SOLAR NORTH AMERICA, INC.S’POST HEARING BRIEF In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/27/2013 | 12-035-100 (11) DIVISION OF PUBLIC UTILITIES’ POST-HEARING BRIEF In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/27/2013 | 12-035-100 (11) ROCKY MOUNTAIN POWER’S POST HEARING BRIEF In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/27/2013 | 12-035-100 (11) POST-HEARING BRIEF OF UTAH OFFICE OF CONSUMER SERVICES In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/27/2013 | 13-049-T01 (6) COMMENTS FROM DPU Re: Qwest Corporation d/b/a CenturyLink QC – This filing is the second step in implementing the “Transitional Intrastate Access Service” reductions mandated by the Federal Communications Commission’s November 18, 2011 Report and Order and Further Notice of Proposed Rulemaking in WC Docket Nos. 10-90, etc. (FCC 11-161). |
6/27/2013 | 13-042-T01 (6) COMMENTS FROM DPU Re: Emery Telephone – This revised tariff filing is submitted to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/27/2013 | 13-2303-T01 (6) COMMENTS FROM DPU Re: Hanksville Telcom, Inc. – This revised tariff filing is submitted to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/27/2013 | 13-2302-T01 (6) COMMENTS FROM DPU Re: Carbon/Emery Telcom, Inc. – This revised tariff filing is submitted to reflect recently enacted FCC rules pursuant to the FCC’s Report and Order and Further Notice of Rulemaking, Docket No. WC Docket No. 10-90, et al., FCC 11-161 (Released November 18, 2011). |
6/27/2013 | 13-049-P03 (1) PRICE LIST Re: Qwest Corporation d/b/a CenturyLink QC – This filing is being issued to coincide with the increase to the Federal Access rate for primary residential service by revising the Federal Lifeline (ASGFX from $6.31 to $6.38 and ASGFR from $2.94 to $2.87) while keeping the overall credit at $9.25. |
6/27/2013 | 13-2405-P02 (3) PRICE LIST Re: ACN Communication Services, Inc. – This filing introduces DigitalTalk Data/Fax Line and grandfathers ACN DigitalTalk Express Dedicated Basic Fax Line. |
6/27/2013 | 13-2476-P01 (6) PRICE LIST Re: Bresnan Broadband of Utah, LLC – The Access Service Price List is in compliance with the Federal Communication Commission’s Report and Order and Further Notice of Proposed Rulemaking in WC Docket Nos. 10-90, et al., FCC 11-161. |
6/28/2013 | 13-035-T09 (11) REPLY COMMENTS OF SUNEDISON, LLC Re: PacifiCorp – In its February 12, 2009 order in Docket No. 08-035-78 on Net Metering Services, the Utah Commission directed the Company to calculate and file Schedule 37 avoided costs annually in order to establish the value or credit for net excess generation of large commercial customers under the Schedule 135 Net Metering Service. |
6/28/2013 | 13-035-71 (11) COMMENTS FROM OCS In the Matter of Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |
6/28/2013 | 12-035-100 (1) COMMENTS FROM RENEWABLE ENERGY BUSINESSES In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/28/2013 | 13-035-71 (11) CORRECTIONS TO THE ROCKY MOUNTAIN POWER 2012 ENERGY EFFICIENCY AND PEAK LOAD REDUCTION ANNUAL REPORT In the Matter of Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |
6/28/2013 | 13-035-114 (11) ROCKY MOUNTAIN POWER’S 2013 NET METERING REPORT FOR UTAH In the Matter of Rocky Mountain Power’s Customer Owned Generation and Net Metering Report and Attachment A for the Period April 1, 2012 through March 31, 2013 |
6/28/2013 | 12-035-100 (1) CORRESPONDENCE FROM RENEWABLE ENERGY BUSINESSES In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/28/2013 | 13-035-71 (11) COMMENTS FROM OCS In the Matter of Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |
6/28/2013 | 13-035-71 (11) CORRECTIONS TO THE ROCKY MOUNTAIN POWER 2012 ENERGY EFFICIENCY AND PEAK LOAD REDUCTION ANNUAL REPORT In the Matter of Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |