Date |
Description |
December 20, 2024 |
Cover Letter
Rocky Mountain Power’s McCoy ADIT Balance Workpaper |
December 20, 2024 |
Correspondence from the Office of Consumer Services |
December 19, 2024 |
Notice of Second Public Witness Hearing |
December 19, 2024 |
Cover Letter to Rocky Mountain Power’s Phase II Surrebuttal Testimonies Phase II Surrebuttal Testimony of Anna DeMers for Rocky Mountain Power Phase II Surrebuttal Testimony of Robert M. Meredith for Rocky Mountain Power RMP Meredith Workpapers |
December 19, 2024 |
Phase II Surrebuttal Testimony of Ron Nelson on behalf of the Office of Consumer Services OCS Attachment 1 – OCS DR response to UTLCG 1.2 attachment – Hearing Exhibit 102, Direct Testimony of Derek S. Klingeman [REMOVED PER THE OFFICE OF CONSUMER SERVICES’ REQUEST, SEE CORRESPONDENCE ON 12/20/2024] Certificate of Service |
December 19, 2024 |
Redacted Phase II Surrebuttal Testimony of Kyra Coyle on behalf of Stadion LLC Phase II Surrebuttal Testimony of Kyra Coyle on behalf of Stadion LLC [CONFIDENTIAL] Redacted Stadion Exhibit 3.1 – Selected Data Responses from PacifiCorp to Stadion Stadion Exhibit 3.1 – Selected Data Responses from PacifiCorp to Stadion [CONFIDENITIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
December 19, 2024 |
Phase II Surrebuttal Testimony of Matt Pernichele for the Division of Public Utilities DPU Exhibit 16.1-SR – Stipulation and Proposed Tariff Sheet for Ohio Power Company Certificate of Service |
December 19, 2024 |
Phase II Surrebuttal Testimony of Rebecca Forbes on behalf of the Kroger Co. Certificate of Service |
December 19, 2024 |
Phase II Surrebuttal Testimony of Justin Bieber on behalf of the Utah Association of Energy Users UAE Exhibit COS 6.1 – RMP’s Responses to Data Requests Referenced in Surrebuttal Testimony Certificate of Service |
December 19, 2024 |
Phase II Surrebuttal Testimony of Jeffry Pollock on behalf of the Utah Large Customer Group UTLCG Exhibit JP-1S – Joint Stipulation and Recommendation, AEP-Ohio Rate Case UTLCG Exhibit JP-2S – Stipulation and Settlement Agreement, Indiana Utility Regulatory Commission UTLCG Exhibit JP-3S – RMP’s Responses to UTLCG’s Data Request Set 13 Certificate of Service |
December 19, 2024 |
Phase II Surrebuttal Testimony of Dr. Jaime Lyndsey McGovern on behalf of Walmart Inc. |
December 19, 2024 |
Phase II Surrebuttal Testimony of Dr. Jay Zarnikau on behalf of Nucor Steel-Utah, a Division of Nucor Corporation Certificate of Service |
December 17, 2024 |
Recorded Live Stream of Hearing Held on December 17, 2024 |
December 16, 2024 |
Public Comments from December 16, 2024 |
December 16, 2024 |
Recorded Live Stream of Hearing Held on December 16, 2024 |
December 13, 2024 |
Recorded Live Stream of Hearing Held on December 13, 2024 |
December 13, 2024 |
Cover Letter to Rocky Mountain Power’s Phase III Direct Testimony and Exhibits Redacted Phase III Direct Testimony of Mariya V. Coleman for Rocky Mountain Power Phase III Direct Testimony of Mariya V. Coleman for Rocky Mountain Power [CONFIDENTIAL] |
December 12, 2024 |
Public Comments from December 12, 2024 |
December 12, 2024 |
Recorded Live Stream of Hearing Held on December 12, 2024 |
December 12, 2024 |
Cover Letter Corrected Redacted Phase I Direct Testimony of David Williams for the Division of Public Utilities Corrected Phase I Direct Testimony of David Williams for the Division of Public Utilities [CONFIDENTIAL] Corrected Phase I Direct Testimony of David Williams for the Division of Public Utilities [HIGHLY CONFIDENTIAL] DPU Exhibit 8.1 – Copy of Attachment DPU 40.3 [CONFIDENTIAL] DPU Exhibit 8.2 – Cedar Springs IV Adjustment [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] Certificate of Service [HIGHLY CONFIDENTIAL] |
December 11, 2024 |
Public Comments from December 11, 2024 |
December 11, 2024 |
Recorded Live Stream of Hearing Held on December 11, 2024 |
December 11, 2024 |
Notice of Decision |
December 10, 2024 |
Public Comments from December 10, 2024 |
December 10, 2024 |
Recorded Live Stream of Hearing Held on December 10, 2024 |
December 10, 2024 |
Partial Settlement Stipulation Certificate of Service |
December 10, 2024 |
Comments from AARP List Postcards |
December 9, 2024 |
Public Comments from December 9, 2024 |
December 9, 2024 |
Recorded Live Stream of Hearing Held on December 9, 2024 Sign-In Sheet for Public Witness Hearing Held December 9, 2024 Recorded Live Stream of Public Witness Hearing Held on December 9, 2024 |
December 6, 2024 |
Public Comments from December 6, 2024 |
December 6, 2024 |
Utah Division of Public Utilities’ Motion for Leave for Witness Robert A. Davis to Appear Telephonically at Hearing and Request for Expedited Consideration Certificate of Service |
December 6, 2024 |
Parties’ List of Anticipated Order of Witnesses for Phase I Hearing Parties’ List of Anticipated Order of Witnesses for Phase I Hearing (Excel) Certificate of Service |
December 5, 2024 |
Public Comments from December 5, 2024 |
December 5, 2024 |
Stadion LLC’s Motion to Excuse Party from Phase I Hearings |
December 5, 2024 |
Redacted Phase I Surrebuttal Testimony of Trevor Jones for the Division of Public Utilities Phase I Surrebuttal Testimony of Trevor Jones for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 2.1 SR – Hedging Report February 2023 [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
December 4, 2024 |
Public Comments from December 4, 2024 |
December 4, 2024 |
Phase I Surrebuttal Testimony of Gary Smith for the Division of Public Utilities DPU Exhibit 6.1 SR – PAC States EBA Info DPU Exhibit 6.2 SR – RMP Response to DPU Data Request 49.5 DPU Exhibit 6.3 SR – Inflation Comparison Certificate of Service |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of Douglas D. Wheelwright for the Division of Public Utilities Phase I Surrebuttal Testimony of Douglas D. Wheelwright for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 4.1 SR – RMP Exhibit SEM-3 Page 321 DPU Exhibit 4.2 SR – PacifiCorp 10-K Page 203 DPU Exhibit 4.3 SR – PacifiCorp 10-Q Page 83 DPU Exhibit 4.4 SR – NPC Summary [CONFIDENTIAL] Certificate of Service
Certificate of Service [CONFIDENTIAL] |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of Karan Pol for the Division of Public Utilities Phase I Surrebuttal Testimony of Karan Pol for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 5.1 SR – Clarifications to Direct Testimony [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of Casey J. Coleman for the Division of Public Utilities Phase I Surrebuttal Testimony of Casey J. Coleman for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 3.01 SR – Kroll Cost of Capital in the Current Environment DPU Exhibit 3.02 SR – Kroll Coronavirus: Cost of Capital Considerations in the Current Environment DPU Exhibit 3.03 SR – FEMA Risk Index DPU Exhibit 3.04 SR – Rich States Poor States Report Certificate of Service Certificate of Service [CONFIDENTIAL] |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of Thomas A. D’Ambrosia for the Division of Public Utilities Phase I Surrebuttal Testimony of Thomas A. D’Ambrosia for the Division of Public Utilities [CONFIDENTIAL] Phase I Surrebuttal Testimony of Thomas A. D’Ambrosia for the Division of Public Utilities [HIGHLY CONFIDENTIAL] DPU Exhibit TAD-9.1 SR – Responses to Data Requests [CONFIDENTIAL] DPU Exhibit TAD-9.2 SR – Summary of Adjustments Certificate of Service Certificate of Service [CONFIDENTIAL] Certificate of Service [HIGHLY CONFIDENTIAL] |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of Jonathan Lee for the Division of Public Utilities Phase I Surrebuttal Testimony of Jonathan Lee for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 11.1 SR – RMP’s Response to DPU Data Request 13.1 1st Revised [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
December 4, 2024 |
Phase I Surrebuttal Testimony of Jeffrey S. Einfeldt for the Division of Public Utilities Certificate of Service |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of Dan F. Koehler for the Division of Public Utilities Phase I Surrebuttal Testimony of Dan F. Koehler for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 7.1 SR – Daymark Surrebuttal 2025 NPC Report Certificate of Service Certificate of Service [CONFIDENTIAL] |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of David Williams for the Division of Public Utilities Phase I Surrebuttal Testimony of David Williams for the Division of Public Utilities [CONFIDENTIAL] Phase I Surrebuttal Testimony of David Williams for the Division of Public Utilities [HIGHLY CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] Certificate of Service [HIGHLY CONFIDENTIAL] |
December 4, 2024 |
Phase I Surrebuttal Testimony of Justin Christensen for the Division of Public Utilities Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of Eric Orton for the Division of Public Utilities Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of Robert A. Davis for the Division of Public Utilities Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of Logan Mitchell, Ph.D. on behalf of Utah Clean Energy Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of Nancy L. Kelly on behalf of Western Resource Advocates WRA Exhibit NK-2 – Corrected Summary of NPC Filings [CONFIDENTIAL] WRA Exhibit NK-6 – Corrected “ NPC in Dollars Per MWh” Table [CONFIDENTIAL] WRA Exhibit NK-7 – Corrections to Errata Rebuttal Testimony of Nancy L. Kelly WRA Exhibit NK-8 – RMP’s Response to WRA Data Request 17.1 WRA Exhibit NK-9 – RMP’s Response to WRA Data Request 17.1(e) [CONFIDENTIAL] WRA Exhibit NK-10 – NPC Estimate for 2025 Test Year [CONFIDENTIAL] WRA Exhibit NK-11 – 2023 IRP Table A.4 Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of Kevin C. Higgins on behalf of the Utah Association of Energy Users UAE Exhibits RR5.1 to RR5.17 [CONFIDENTIAL] UAE Exhibit RR5.18 – RMP’s Response to DPU Data Request 58.2 Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of J. Randall Woolridge, Ph.D. for the Office of Consumer Services OCS Exhibits JRW-10 to JRW-12 Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of Bela Vastag for the Office of Consumer Services Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of Alyson Anderson on behalf of the Utah Office of Consumer Services Certificate of Service |
December 4, 2024 |
Redacted Phase I Surrebuttal Testimony of Donna Ramas for the Office of Consumer Services Phase I Surrebuttal Testimony of Donna Ramas for the Office of Consumer Services [CONFIDENTIAL] OCS Exhibits 3.1SR to 3.7SR OCS Exhibit 3.8SR – Internal Labor Expenses OCS Exhibit 3.9SR – Responses to Data Requests Referenced in the Testimony Certificate of Service Certificate of Service [CONFIDENTIAL] |
December 4, 2024 |
Phase I Surrebuttal Testimony of Colin T. Fitzhenry on behalf of the Federal Executive Agencies Certificate of Service |
December 4, 2024 |
Phase I Surrebuttal Testimony of David J. Garrett on behalf of the Utah Large Customer Group Certificate of Service |
December 4, 2024 |
Cover Letter to Rocky Mountain Power’s Phase I Surrebuttal Testimonies and Exhibits Phase I Surrebuttal Testimony of Ramon J. Mitchell for Rocky Mountain Power Phase I Surrebuttal Testimony of Ann E. Bulkley for Rocky Mountain Power Phase I Surrebuttal Testimony of Craig M. Eller for Rocky Mountain Power Phase I Surrebuttal Testimony of Julie Lewis for Rocky Mountain Power Phase I Surrebuttal Testimony of Shelley E. McCoy for Rocky Mountain Power Phase I Surrebuttal Testimony of Ryan Fuller for Rocky Mountain Power RMP Exhibit RF-1S – Rate Case History – Property Tax Expense |
December 4, 2024 |
The Kroger Co.’s Motion to Excuse Party from Phase I Hearings |
December 3, 2024 |
Public Comments from December 3, 2024 |
December 3, 2024 |
Order to Submit List of Anticipated Order of Witnesses for Phase I Hearing |
December 2, 2024 |
Public Comments from December 2, 2024 |
November 29, 2024 |
Public Comments from November 29, 2024 |
November 27, 2024 |
Public Comments from November 27, 2024 |
November 27, 2024 |
Notice of Additional Phase I Hearing Dates |
November 27, 2024 |
Rocky Mountain Power’s Unopposed Motion to Amend the Scheduling Order |
November 26, 2024 |
Public Comments from November 26, 2024 |
November 26, 2024 |
Rocky Mountain Power’s Phase I Rebuttal Testimony Corrected Workpaper RMP Workpaper – Corrected JAM |
November 26, 2024 |
Phase II Rebuttal Testimony of Jeffry Pollock on behalf of the Utah Large Customer Group UTLCG Exhibit JP-1R – RMP POD Hourly Generation Cost and Demand Heatmap UTLCG Exhibit JP-2R – RMP Price-Duration Curve UTLCG Exhibit JP-3R – OCS Response to UTLCG Data Request Set 1 UTLCG Phase II Rebuttal Testimony Workpapers Certificate of Service |
November 26, 2024 |
Phase II Rebuttal Testimony of Kyra Coyle on behalf of Stadion LLC Stadion Exhibit 2.1 – Rocky Mountain Power Data Request Response to Stadion Certificate of Service |
November 26, 2024 |
Phase II Rebuttal Testimony of Matt Pernichele for the Division of Public Utilities Certificate of Service |
November 26, 2024 |
Cover Letter to Rocky Mountain Power’s Phase II Rebuttal Testimonies and Exhibits Phase II Rebuttal Testimony of Anna DeMers for Rocky Mountain Power Phase II Rebuttal Testimony of Kenneth Lee Elder for Rocky Mountain Power Phase II Rebuttal Testimony of Craig M. Eller for Rocky Mountain Power Phase II Rebuttal Testimony of Robert M. Meredith for Rocky Mountain Power RMP Meredith Phase II Rebuttal Testimony Workpapers RMP Meredith Phase II Rebuttal Testimony Workpapers [CONFIDENTIAL] |
November 26, 2024 |
Phase II Rebuttal Testimony and Exhibits of Justin Bieber on behalf of the Utah Association of Energy Users UAE Exhibit COS 4.1 – OCS Responses to Data Requests Referenced in the Rebuttal Testimony UAE Exhibit COS 4.2 – UT_GRC_2025_07_JULY_OUTPUTMWH [CONFIDENTIAL] Certificate of Service |
November 26, 2024 |
Phase II Rebuttal Testimony of Karl G. Boothman on behalf of Western Resource Advocates WRA Exhibit KB-5 – RMP’s Response to WRA Data Requests 11.10-11.11 WRA Exhibit KB-6 – RMP’s Response to OCS Data Request 26.8 WRA Workpapers 1 – Billing Determinants WRA Workpapers 2 – Substation Peaks Certificate of Service |
November 26, 2024 |
Phase II Rebuttal Testimony of Ron Nelson on behalf of the Office of Consumer Services Certificate of Service |
November 26, 2024 |
Phase II Rebuttal Testimony of Brian C. Andrews for the Federal Executive Agencies Certificate of Service |
November 25, 2024 |
Public Comments from November 25, 2024 |
November 25, 2024 |
Corrected Division of Public Utilities’ Request to Consider Adding Hearing Days |
November 22, 2024 |
Division of Public Utilities’ Request to Consider Adding Hearing Days |
November 19, 2024 |
Western Resource Advocates’ Errata, Re: Phase I Rebuttal Testimony of Nancy L. Kelly (Redline) Certificate of Service |
November 19, 2024 |
Appendix A, Re: Jared Robertson for the Utah Association of Energy Users |
November 18, 2024 |
Public Comments from November 18, 2024 |
November 18, 2024 |
Response of Western Resource Advocates |
November 18, 2024 |
Federal Executive Agencies’ Errata Cover Letter, Re: FEA Phase I Rebuttal Testimony of Michael P. Gorman FEA Attachment 1 – Rebuttal Testimony of Michael P. Gorman FEA Attachment 2 – Corrected Exhibit MPG-1R (Redline) Certificate of Service |
November 18, 2024 |
Federal Executive Agencies’ Errata Cover Letter, Re: FEA Phase II Direct Testimony of Brian C. Andrews FEA Attachment 1 – Direct Testimony of Brian C. Andrews FEA Attachment 2 – Qualifications of Brian C. Andrews FEA Attachment 3 – Exhibit BCA-1 FEA Attachment 4 – Exhibit BCA-2 Certificate of Service |
November 18, 2024 |
Rocky Mountain Power’s Response to Round Two Dispositive Motions |
November 15, 2024 |
Cover Letter to Rocky Mountain Power’s Phase I Rebuttal Testimonies and Exhibits Phase I Rebuttal Testimony of Joelle R. Steward for Rocky Mountain Power Redacted Phase I Rebuttal Testimony of Nikki L. Kobliha for Rocky Mountain Power Phase I Rebuttal Testimony of Nikki L. Kobliha for Rocky Mountain Power [CONFIDENTIAL] Phase I Rebuttal Testimony of Ann E. Bulkley for Rocky Mountain Power RMP Bulkley Workpapers Phase I Rebuttal Testimony of Allen L. Berreth for Rocky Mountain Power Redacted Phase I Rebuttal Testimony of Ramon J. Mitchell for Rocky Mountain Power Phase I Rebuttal Testimony of Ramon J. Mitchell for Rocky Mountain Power [CONFIDENTIAL] RMP Mitchell Workpapers [CONFIDENTIAL] Redacted Phase I Rebuttal Testimony of Michael G. Wilding for Rocky Mountain Power Phase I Rebuttal Testimony of Michael G. Wilding for Rocky Mountain Power [CONFIDENTIAL] RMP Wilding Workpapers [CONFIDENTIAL] Redacted Phase I Rebuttal Testimony of Rick T. Link for Rocky Mountain Power Phase I Rebuttal Testimony of Rick T. Link for Rocky Mountain Power [CONFIDENTIAL] Phase I Rebuttal Testimony of Richard A. Vail for Rocky Mountain Power RMP Exhibit RAV-2R [CONFIDENTIAL] Phase I Rebuttal Testimony of Timothy J. Hemstreet for Rocky Mountain Power Redacted Phase I Rebuttal Testimony of Jeffrey M. Wagner for Rocky Mountain Power Phase I Rebuttal Testimony of Jeffrey M. Wagner for Rocky Mountain Power [CONFIDENTIAL] Redacted Phase I Rebuttal Testimony of James C. Owen for Rocky Mountain Power Phase I Rebuttal Testimony of James C. Owen for Rocky Mountain Power [CONFIDENTIAL] RMP Exhibit JCO-4R [HIGHLY CONFIDENTIAL] Phase I Rebuttal Testimony of Ryan Fuller for Rocky Mountain Power RMP Exhibit RF-1R [CONFIDENTIAL] Phase I Rebuttal Testimony of Julie Lewis for Rocky Mountain Power Phase I Rebuttal Testimony of Joshua B. Jones for Rocky Mountain Power Phase I Rebuttal Testimony of Craig M. Eller for Rocky Mountain Power Phase I Rebuttal Testimony of Kenneth Lee Elder for Rocky Mountain Power Phase I Rebuttal Testimony of Shelley E. McCoy for Rocky Mountain Power RMP Exhibit SEM-3R [CONFIDENTIAL] RMP McCoy Workpapers RMP McCoy Workpapers [CONFIDENTIAL] |
November 15, 2024 |
Redacted Phase I Rebuttal Testimony of Thomas A. D’Ambrosia for the Division of Public Utilities Phase I Rebuttal Testimony of Thomas A. D’Ambrosia for the Division of Public Utilities [CONFIDENTIAL] Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Justin Christensen for the Division of Public Utilities Redacted DPU Exhibits 13.1R – 13.2R DPU Exhibits 13.1R – 13.2R [CONFIDENTIAL] DPU Exhibit 13.3R – OCS Data Request 22.3 Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Shauna Benvegnu-Springer for the Division of Public Utilities Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Ryan Daigle for the Division of Public Utilities DPU Attachment A – OCS 5th Set Data Request (1-49) DPU Attachment B – OCS Data Request 5.37 DPU Attachment C – OCS 11th Set Data Request (1-12) DPU Attachment D – OCS Data Request 11.5 DPU Attachment E – OCS Data Request 11.7 Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Dan F. Koehler for the Division of Public Utilities Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Paul A. Hicken for the Division of Public Utilities Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Jeffrey S. Einfeldt for the Division of Public Utilities Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Eric Orton for the Division of Public Utilities Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Nancy L. Kelly on behalf of Western Resource Advocates Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Albert Lin on behalf of Western Resource Advocates Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Kevin C. Higgins on behalf of the Utah Association of Energy Users Certificate of Service |
November 15, 2024 |
Phase I Rebuttal Testimony of Alyson Anderson on behalf of the Utah Office of Consumer Services |
November 15, 2024 |
Scheduling Order for Consolidated Phase III and Notice of Hearing |
November 15, 2024 |
Order Adopting Alternative Process |
November 15, 2024 |
Phase I Rebuttal Testimony and Exhibit of Michael P. Gorman on behalf of the Federal Executive Agencies FEA Exhibit MPG-1R – Revenue Impact Certificate of Service |
November 12, 2024 |
Public Comments from November 12, 2024 |
November 8, 2024 |
Notice of Decision and Order Vacating Deadline to Submit Statements of Position |
November 6, 2024 |
Utah Clean Energy’s Notice of Withdrawal of Counsel and Removal from Service List Certificate of Service |
November 5, 2024 |
The Utah Large Customer Group’s Notice of Appearance of Counsel |
November 5, 2024 |
Correspondence from Gary L. Widerburg, Re: Stadion LLC’s Motion to Deviate from Electronic Filing Requirement |
November 1, 2024 |
Legal Brief of Stadion LLC in Support of the Utah Association of Large Energy Users’ Brief |
November 1, 2024 |
Legal Brief of the Utah Association of Energy Users UAE Exhibit 1 – Redlined Tariff Sheets – Regulation No. 12 UAE Exhibit 2 – DPU Request – Docket No. 24-035-43 UAE Exhibit 3 – DPU Comments – Docket No. 24-035-43 |
November 1, 2024 |
Comments of the Utah Association of Energy Users in Response to the Commission’s October 25, 2024 Order |
November 1, 2024 |
The Utah Large Customer Group’s Response Comments to the Order Affirming Consolidation Order and Request for Comments Re: Alternative Process |
November 1, 2024 |
Division of Public Utilities’ Comments on Alternative Process |
November 1, 2024 |
Office of Consumer Services’ Comments Certificate of Service |
October 31, 2024 |
Rocky Mountain Power’s Response to Commission’s October 25, 2024 Order |
October 31, 2024 |
Utah Association of Energy Users’ Errata Filing, Re: UAE Direct Testimony of Kevin C. Higgins UAE Attachment 1 – Corrected Pages (Redline) Redacted UAE Attachment 2 – Errata Phase I Direct Testimony of Kevin C. Higgins on behalf of the Utah Association of Energy Users UAE Attachment 2 – Errata Phase I Direct Testimony of Kevin C. Higgins on behalf of the Utah Association of Energy Users [CONFIDENTIAL] |
October 30, 2024 |
Redacted Phase II Direct Testimony and Exhibits of Kyra Coyle on behalf of Stadion LLC Phase II Direct Testimony and Exhibits of Kyra Coyle on behalf of Stadion LLC [CONFIDENTIAL] Stadion Exhibit 1.1 – Qualifications of Kyra Coyle Redacted Stadion Exhibit 1.2 – Selected Data Responses from PacifiCorp to Parties Stadion Exhibit 1.2 – Selected Data Responses from PacifiCorp to Parties [CONFIDENTIAL] Stadion Exhibit 1.3 – Recommended Edits to Rocky Mountain Power Electric Service Regulation 12 Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 30, 2024 |
Phase II Direct Testimony of Jeffry Pollock on behalf of the Utah Large Customer Group UTLCG Exhibit JP-1 – Updated Class Cost-of-Service Study UTLCG Exhibit JP-2 – Derivation of Average and Excess/Four Coincident Peak Allocation Factors UTLCG Exhibit JP-3 – Updated Class Cost-of-Service Study: AED-4CP Method for Production and Transmission Plant and Related Expenses UTLCG Exhibit JP-4 – RMP’s Proposed Class Revenue Allocation UTLCG Exhibit JP-5 – Class Revenue Allocation Based on the Updated Class Cost-of-Service Study Using the AED-4CP Method for Production and Transmission Plant and Related Expenses UTLCG Exhibit JP-6 – UTLCG Recommended Class Revenue Allocation Based on the Updated Class Cost-of-Service Study UTLCG Exhibit JP-7 – Compilation of Cited Discovery Responses UTLCG Workpapers Certificate of Service |
October 30, 2024 |
Redacted Phase II Direct Testimony of Matt Pernichele for the Division of Public Utilities Phase II Direct Testimony of Matt Pernichele for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 16.2 – RMP Lifeline Summary Report Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 30, 2024 |
Phase II Direct Testimony of Jaime McGovern on behalf of Walmart Inc. Certificate of Service |
October 30, 2024 |
Phase II Direct Testimony of Logan Mitchell, Ph.D. on behalf of Utah Clean Energy Certificate of Service |
October 30, 2024 |
Phase II Direct Testimony of Karl G. Boothman on behalf of Western Resource Advocates Certificate of Service |
October 30, 2024 |
Phase II Direct Testimony and Exhibits of Justin Bieber on behalf of the Utah Association of Energy Users UAE Exhibit COS 2.1 – RMP’s Responses to Data Requests Referenced in Testimony UAE Exhibit COS 2.2 – Average and Excess Informational Cost of Service Study UAE Workpapers COS 2.1 – Rate Spread UAE Workpapers COS 2.2 – Informational Average and Excess CoS by Rate Schedule Certificate of Service |
October 30, 2024 |
Phase II Direct Testimony of Ron Nelson on behalf of the Office of Consumer Services Redacted OCS Exhibit 5.1D – Collection of Data Requests Referenced in this Testimony OCS Exhibit 5.1D – Collection of Data Requests Referenced in Testimony [CONFIDENTIAL] OCS Exhibit 5.2D – Resume of Ron Nelson OCS Workpapers 1 – COSS Combined OCS Adjusted OCS Workpapers 2 – Basis for Customer Charge OCS Workpapers 3 – Bill Impact Analysis Redacted OCS Workpapers 4 – PoD Test Year Analysis OCS Workpapers 4 – PoD Test Year Analysis [CONFIDENTIAL] OCS Workpapers 5 – Rate Spread Adjustment Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 30, 2024 |
Phase II Direct Testimony of Alyson Anderson on behalf of the Utah Office of Consumer Services Certificate of Service |
October 30, 2024 |
Phase II Direct Testimony and Exhibits of Rebecca Forbes on behalf of The Kroger Co. Kroger COS Exhibit 1.1 – Proposed Schedule 6 Revenue Verification Kroger COS Exhibit 1.2 – Schedule 6 Bill Impacts Certificate of Service |
October 30, 2024 |
Phase II Direct Testimony and Exhibits of Brian C. Andrews on behalf of the Federal Executive Agencies FEA Exhibit 3.1 – Qualifications of Brian C. Andrews Certificate of Service |
October 30, 2024 |
Phase II Direct Testimony of Dr. Jay Zarnikau on behalf of Nucor Steel-Utah, a Division of Nucor Corporation Exhibit JZ-1 – Resume of Jay Zarnikau Exhibit JZ-2 – Discovery Requests and Responses Cited in Testimony Certificate of Service |
October 30, 2024 |
Stadion LLC’s Motion to Deviate from Electronic Filing Requirement |
October 25, 2024 |
Order Affirming Consolidation Order and Request for Comments Re: Alternative Process |
October 23, 2024 |
Appendix A, Re: D. Matthew Moscon, Cameron L. Sabin, and Kaitie Wilson for Rocky Mountain Power |
October 23, 2024 |
Notice of Appearance of Counsel Kaitie Wilson for Rocky Mountain Power |
October 22, 2024 |
Correspondence from Gary L. Widerburg, Re: the Utah Large Customer Group’s Motion to Deviate from Electronic Filing Requirement |
October 22, 2024 |
Correspondence from Gary L. Widerburg, Re: the Federal Executive Agencies’ Motion for Permission to Deviate from Electronic Filing Requirement |
October 18, 2024 |
Public Comments from October 18, 2024 |
October 18, 2024 |
Federal Executive Agencies’ Notice of Appearance of Additional Counsel |
October 17, 2024 |
Phase I Direct Testimony of Eric Orton for the Division of Public Utilities DPU Exhibit 15.1 – Adjustments to Expense Certificate of Service |
October 17, 2024 |
Phase I Direct Testimony of Robert A. Davis for the Division of Public Utilities DPU Exhibit 12.1 – Attachment DPU 27.2 Net Metering DPU Exhibit 12.2 – PacifiCorp Company Aircraft & Supplemental Lift Use Policy DPU Exhibit 12.3 – DPU Data Requests Set 16 (1-3) DPU Exhibit 12.4 – DPU Data Requests Set 38 (1-3) DPU Exhibit 12.5 – Attachment DPU 16.1 Aircraft Flight Log DPU Exhibit 12.6 – Attachment DPU 16.3 Aircraft GL DPU Exhibit 12.7 – Attachment OCS 15.1 Aircraft Expense Certificate of Service |
October 17, 2024 |
Redacted Phase I Direct Testimony of Jonathan Lee for the Division of Public Utilities Phase I Direct Testimony of Jonathan Lee for the Division of Public Utilities [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Phase I Direct Testimony of Jeffrey S. Einfeldt for the Division of Public Utilities Certificate of Service |
October 17, 2024 |
Redacted Phase I Direct Testimony of Thomas A. D’Ambrosia for the Division of Public Utilities Phase I Direct Testimony of Thomas A. D’Ambrosia for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit TAD-9.1 – Prepared Testimony of TAD before NY PSC DPU Exhibit TAD-9.2 – Daymark Adjustments to Revenue Requirement Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Redacted Phase I Direct Testimony of David Williams for the Division of Public Utilities [Replaced by Corrected Testimony filed on 12/12/2024] Phase I Direct Testimony of David Williams for the Division of Public Utilities [CONFIDENTIAL] Phase I Direct Testimony of David Williams for the Division of Public Utilities [HIGHLY CONFIDENTIAL] DPU Exhibit 8.1 – Copy of Attachment DPU 40.3 [CONFIDENTIAL] DPU Exhibit 8.2 – Cedar Springs IV Adjustment [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] Certificate of Service [HIGHLY CONFIDENTIAL] |
October 17, 2024 |
Redacted Phase I Direct Testimony of Dan F. Koehler for the Division of Public Utilities Phase I Direct Testimony of Dan F. Koehler for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 7.1 – Resume DPU Exhibit 7.2 – Daymark Direct 2025 NPC Report Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Phase I Direct Testimony of Gary Smith for the Division of Public Utilities DPU Exhibit 6.1 – Chart 1 [CONFIDENTIAL] DPU Exhibit 6.2 – Chart 2 [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Redacted Phase I Direct Testimony of Karan Pol for the Division of Public Utilities Phase I Direct Testimony of Karan Pol for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 5.1 – Resume Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Redacted Phase I Direct Testimony of Douglas D. Wheelwright for the Division of Public Utilities Phase I Direct Testimony of Douglas D. Wheelwright for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 4.1 – Current Power Market Trends DPU Exhibit 4.2 – OCS Data Request 11.1 DPU Exhibit 4.3 – OCS Data Request 11.1 [CONFIDENTIAL] DPU Exhibit 4.4 – DPU Data Requests 15.8 & 15.9 DPU Exhibit 4.5 – DPU Data Request 42.11 [CONFIDENTIAL] DPU Exhibit 4.6 – DPU Data Request 42.12 [CONFIDENTIAL] DPU Exhibit 4.7 – DPU Data Request 42.7 Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Redacted Phase I Direct Testimony of Casey J. Coleman for the Division of Public Utilities Phase I Direct Testimony of Casey J. Coleman for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibits 3.1 – 3.12 DPU Exhibit 3.13 – Cost of Capital in the Current Environment DPU Exhibit 3.14 – Major Energy Rate Case Decisions Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Redacted Phase I Direct Testimony of Trevor Jones for the Division of Public Utilities Phase I Direct Testimony of Trevor Jones for the Division of Public Utilities [CONFIDENTIAL] DPU Exhibit 2.1 – Total Proposed Revenue Requirement adjustments DPU Exhibit 2.2 – DPU Data Request 15.9 DPU Exhibit 2.3 – Transaction Details Analysis [CONFIDENTIAL] DPU Trevor Jones Workpapers [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Phase I Direct Testimony of David J. Garrett on behalf of the Utah Large Customer Group UTLCG Exhibit DJG-1 – Curriculum Vitae UTLCG Exhibit DJG-2 – Proxy Group Summary UTLCG Exhibit DJG-3 – DCF Stock and Index Prices UTLCG Exhibit DJG-4 – DCF Dividend Yields UTLCG Exhibit DJG-5 – DCF Sustainable Growth Rate Determinants UTLCG Exhibit DJG-6 – DCF Final Results UTLCG Exhibit DJG-7 – CAPM Risk-Free Rate UTLCG Exhibit DJG-8 – CAPM Beta Coefficient UTLCG Exhibit DJG-9 – CAPM Implied Equity Risk Premium Estimate UTLCG Exhibit DJG-10 – CAPM Equity Risk Premium Results UTLCG Exhibit DJG-11 – CAPM Final Result UTLCG Exhibit DJG-12 – Cost of Equity Summary UTLCG Exhibit DJG-13 – Proxy Company Debt Ratios UTLCG Exhibit DJG-14 – Competitive Industry Debt Ratios UTLCG Exhibit DJG-15 – Hamada Model ROE UTLCG Exhibit DJG-16 – Rate of Return Recommendation Certificate of Service |
October 17, 2024 |
Redacted Phase I Direct Testimony of James R. Dauphinais on behalf of the Utah Large Customer Group Phase I Direct Testimony of James R. Dauphinais on behalf of the Utah Large Customer Group [CONFIDENTIAL] UTLCG Exhibit JRD-1 – Compilation of Data Requests Certificate of Service |
October 17, 2024 |
Phase I Direct Testimony of Jaime McGovern on behalf of Wal-Mart Stores, Inc. WM Exhibit JLM-1 – Qualifications WM Exhibit JLM-2 – Impact of Proposed Hypothetical Capital Structure WM Exhibit JLM-3 – Normalized Results of Operations, RMP (SEM-1) WM JLM Workpapers |
October 17, 2024 |
Redacted Phase I Direct Testimony of Kevin C. Higgins on behalf of the Utah Association of Energy Users Phase I Direct Testimony of Kevin C. Higgins on behalf of the Utah Association of Energy Users [CONFIDENTIAL] Redacted UAE Exhibits RR 1.1 – 1.17 UAE Exhibits RR 1.1 – 1.17 [CONFIDENTIAL] UAE Exhibit RR 1.18 – RMP’s Responses to Data Requests UAE Exhibit RR 1.19 – RMP’s Confidential Responses to Data Requests [CONFIDENTIAL] UAE Exhibit RR 1.20 – Klamath Hydroelectric Settlement Agreement UAE Exhibit RR 1.21 – Oregon October 27, 2023 PUC Order in Docket No. UE 420 UAE Exhibit RR 1.22 – Wyoming January 2, 2024 PSC Order in Docket No. 20000-633-ER-23 Certificate of Service |
October 17, 2024 |
Redacted Prefiled Phase I Direct Testimony of Nancy L. Kelly on behalf of Western Resource Advocates Prefiled Phase I Direct Testimony of Nancy L. Kelly on behalf of Western Resource Advocates [CONFIDENTIAL] WRA Exhibit NK-1 – Resume WRA Exhibit NK-2 – NPC Filings [CONFIDENTIAL] WRA Exhibit NK-3 – Coal Generation [CONFIDENTIAL] WRA Exhibit NK-4 – Gas Generation [CONFIDENTIAL WRA Exhibit NK-5 – Gas Capacity [CONFIDENTIAL] Certificate of Service |
October 17, 2024 |
Phase I Prefiled Direct Testimony of Albert Lin on behalf of Western Resource Advocates WRA Exhibit AL-1 – Resume Certificate of Service |
October 17, 2024 |
Phase I Direct Testimony of Karl G. Boothman on behalf of Western Resource Advocates WRA Exhibit KB-1 – Resume WRA Exhibit KB-2 – Data Requests Set 9 WRA Exhibit KB-3 – Schedule 74 Redlines WRA Exhibit KB-4 – Data Requests Set 7 Certificate of Service |
October 17, 2024 |
Redacted Phase I Direct Testimony of Donna Ramas for the Office of Consumers services Phase I Direct Testimony of Donna Ramas for the Office of Consumers services [CONFIDENTIAL] OCS Appendix I – Qualifications of Donna Ramas OCS Exhibits 3.1D – 3.26D Redacted OCS Exhibit 3.2.1D – Wheeling Revenue Increase OCS Exhibit 3.2.1D – Wheeling Revenue Increase [CONFIDENTIAL] Redacted OCS Exhibit 3.27D – Data Requests OCS Exhibit 3.27D – Data Requests [CONFIDENTIAL] OCS Exhibit 3.27D – Data Requests, Attachment OCS 15.6 1st Supplemental Certificate of Service Certificate of Service [CONFIDENTIAL] |
October 17, 2024 |
Phase I Direct Testimony of J. Randall Woolridge, Ph.D. for the Office of Consumer Services OCS Exhibit JRW1 – Cost of Capital Recommendation OCS Exhibit JRW2 – Qualifications of J. Randall Woolridge OCS Workpapers JRW1 – Workpapers List OCS Workpapers JRW2 – Articles OCS Workpapers JRW3 – Electric V-Lines OCS Workpapers JRW4 – Tables and Worksheets Certificate of Service |
October 17, 2024 |
Phase I Direct Testimony of Bela Vastag for the Office of Consumer Services Certificate of Service |
October 17, 2024 |
Phase I Direct Testimony of Alyson Anderson on behalf of the Utah office of Consumer Services Certificate of Service |
October 17, 2024 |
Redacted Phase I Direct Testimony of Colin T. Fitzhenry on behalf of the Federal Executive Agencies Phase I Direct Testimony of Colin T. Fitzhenry on behalf of the Federal Executive Agencies [CONFIDENTIAL] |
October 17, 2024 |
Redacted Phase I Direct Testimony and Exhibits of Michael P. Gorman on behalf of the Federal Executive Agencies Phase I Direct Testimony and Exhibits of Michael P. Gorman on behalf of the Federal Executive Agencies [CONFIDENTIAL] |
October 17, 2024 |
Phase I Prefiled Direct Testimony of Logan Mitchell, Ph.D. on behalf of Utah Clean Energy UCE Exhibit A – Curriculum Vitae of Logan E. Mitchell, Ph.D. Certificate of Service |
October 16, 2024 |
The Utah Large Customer Group’s Motion to Deviate from Electronic Filing Requirement |
October 16, 2024 |
The Federal Executive Agencies’ Motion for Permission to Deviate from Electronic Filing Requirement |
October 15, 2024 |
Public Comments from October 15, 2024 |
October 11, 2024 |
Rocky Mountain Power’s Objection to the Commission’s October 4, 2024 Order |
October 11, 2024 |
Comments of the Utah Association of Energy Users in Response to Consolidation Order |
October 11, 2024 |
The Utah Large Customer Group’s Request for Clarification |
October 9, 2024 |
Order Granting Intervention of The Kroger Co. |
October 8, 2024 |
Appendix A, Re: Jaime McGovern for Wal-Mart Stores, Inc. |
October 7, 2024 |
Public Comments from October 7, 2024 |
October 4, 2024 |
Public Comments from October 4, 2024 |
October 4, 2024 |
Order |
October 3, 2024 |
Rocky Mountain Power’s Revised Workpapers RMP Workpapers 1 – Revised Meredith UT Blocking GRC 2024 RMP Workpapers 2 – Revised Meredith UT Monthly Loads for Load Research – 2024 GRC(Revised) RMP Workpapers 3 – Revised Amended RMM Workpapers UT Blocking GRC 2024 |
October 3, 2024 |
Order Granting Intervention of the Federal Executive Agencies |
October 3, 2024 |
Appendix A, Re: Justina A. Caviglia for Wal-Mart Stores, Inc. |
October 3, 2024 |
Appendix A, Re: Grace Barry, Vikram Suresh, Rory O’Brien, and Dana H. Cline for the Division of Public Utilities |
October 3, 2024 |
Appendix A, Re: Jay Zarnikau for Nucor Steel-Utah, a Division of Nucor Corporation |
October 2, 2024 |
Appendix A, Re: Sam C. Kidd for the Utah Large Customer Group |
October 2, 2024 |
Appendix A, Re: Jordan J. Ahern and Micah Feigelson for the Office of Consumer Services |
October 1, 2024 |
Appendix A, Re: Timothy Cook for the Office of Consumer Services |
September 30, 2024 |
Public Comments from September 30, 2024 |
September 25, 2024 |
Appendix A, Re: Leslie R. Newton, Thomas A. Jernigan, Ashley N. George, Michael A. Rivera, James B. Ely, Ebony M. Payton, Magdalena G. Ackenhausen, Brian C. Andrews, Sarah A. Bellm, Colin Fitzhenry, Michael P. Gorman, James A. Leyko, and Adrienne Navarro for the Federal Executive Agencies |
September 23, 2024 |
Appendix A, Re: Anuradha Sen and Ellen S. Smith for the Division of Public Utilities |
September 23, 2024 |
The Kroger Co.’s Revised Petition to Intervene |
September 23, 2024 |
The Kroger Co.’s Petition to Intervene |
September 19, 2024 |
Appendix A, Re: Michelle Brandt King, Austin W. Jensen, Thorvald A. Nelson, Nikolas S. Stoffel, Adele Lee, Jeffry Pollock, Shawn McGlothlin, Billie S. LaConte, Joseph Selsor, Kitty Turner, David Garrett, and James Dauphinais for Utah Large Customer Group |
September 19, 2024 |
Appendix A, Re: Paul D. Anderson for the Office of Consumer Services |
September 19, 2024 |
Order Granting Intervention of the Utah Large Customer Group |
September 18, 2024 |
Rocky Mountain Power’s Response to Round One Dispositive Motions |
September 18, 2024 |
Notice of Appearance of Counsel D. Matthew Moscon and Cameron L. Sabin for Rocky Mountain Power |
September 17, 2024 |
Petition for Leave to Intervene of Federal Executive Agencies and Notice of Non-Opposition to the Federal Executive Agencies’ Intervention |
September 16, 2024 |
Appendix A, Re: Jeffrey Evans, John Gleba, Ryan Hughes, Peter Kelly, Kevin M. Madigan, Taarini Mohan, Wendy R. Shapss, and Mark Crawshaw for the Division of Public Utilities |
September 12, 2024 |
Public Comments from September 12, 2024 |
September 12, 2024 |
Appendix A, Re: Paul Alvarez and Dennis Stephens for the Office of Consumer Services |
September 6, 2024 |
Dispositive Motion of the Utah Association of Energy Users |
September 6, 2024 |
Notice of Non-Opposition to the Utah Large Customer Group’s Intervention |
September 6, 2024 |
Western Resource Advocates’ Request for Preliminary Conclusion of Law |
September 6, 2024 |
Appendix A, Re: Mark Ellis for the Office of Consumer Services |
September 6, 2024 |
Office of Consumer Services’ Legal Brief Seeking Summary Disposition and/or Clarification of Identified Issues Certificate of Service |
September 4, 2024 |
Appendix A, Re: Oliwia Smith for the Utah Association of Energy Users |
September 3, 2024 |
Public Comments from September 3, 2024 |
September 3, 2024 |
Petition for Leave to Intervene of the Utah Large Customer Group |
August 30, 2024 |
Public Comments from August 30, 2024 |
August 28, 2024 |
Rocky Mountain Power’s Amendment to the Application for General Rate Increase RMP Attachment 1 – Amended Direct Testimony of Joelle R. Steward RMP Attachment 2 – Amended Direct Testimony of Mariya V. Coleman RMP Attachment 3 – Amended Direct Testimony of Shelley E. McCoy RMP Attachment 3A – Revised Exhibit SEM-7A EBA Base RMP Attachment 3B – Revised Exhibit SEM-10A Rate Mitigation Calculations RMP Attachment 4 – Amended Direct Testimony of Robert M. Meredith |
August 27, 2024 |
Public Comments from August 27, 2024 |
August 27, 2024 |
Appendix A, Re: James A. Logan for the Utah Public Service Commission |
August 26, 2024 |
Public Comments from August 26, 2024 |
August 26, 2024 |
Errata Supplemental Scheduling Order Re: Dispositive Motions and Pre-Hearing Briefs |
August 23, 2024 |
Public Comments from August 23, 2024 |
August 21, 2024 |
Public Comments from August 21, 2024 |
August 20, 2024 |
Appendix A, Re: Albert Lin for Western Resource Advocates |
August 19, 2024 |
Public Comments from August 19, 2024 |
August 16, 2024 |
Public Comments from August 16, 2024 |
August 15, 2024 |
Public Comments from August 15, 2024 |
August 14, 2024 |
Public Comments from August 14, 2024 |
August 14, 2024 |
Supplemental Scheduling Order Re: Dispositive Motions and Pre-Hearing Briefs |
August 13, 2024 |
Public Comments from August 13, 2024 |
August 12, 2024 |
Public Comments from August 12, 2024 |
August 8, 2024 |
Public Comments from August 8, 2024 Attachment 1 – FERC Order No. 1920 |
August 8, 2024 |
Appendix A, Re: Alex Palomino and Donald Hendrickson for the Utah Association of Energy Users |
August 7, 2024 |
Appendix A, Re: Peter J. Mattheis, Eric J. Lacey, Joseph R. Briscar, and Jeremy R. Cook for Nucor Steel-Utah, a Division of Nucor Corporation |
August 2, 2024 |
Office of Consumer Services’ Submission of Proposed Legal Issues for Prehearing Briefing and Response Concerning Briefing Schedule Certificate of Service |
August 2, 2024 |
Utah Association of Energy Users’ Comments and Request for Legal Briefing |
August 2, 2024 |
Utah Division of Public Utilities’ Request and Proposal Regarding Legal Briefing, Dispositive Motions, and Schedule Certificate of Service |
August 2, 2024 |
Stadion LLC’s Request for Legal Briefing and Dispositive Motions |
August 2, 2024 |
Appendix A, Re: Irion Sanger, Diego Rivas, Ellie Hardwick, Min Hu, Dustin Prater, Kyra Coyle, and Brian Dickman for Stadion LLC |
August 2, 2024 |
Request for Briefing of Western Resource Advocates |
July 30, 2024 |
Order Granting Intervention of Nucor Steel-Utah, a Division of Nucor Corporation |
July 30, 2024 |
Appendix A, Re: Sarah Wright for Utah Clean Energy |
July 29, 2024 |
Public Comments from July 29, 2024 |
July 26, 2024 |
Order Granting Intervention of Wal-Mart Stores, Inc. |
July 25, 2024 |
Rocky Mountain Power’s Supplement to Filing Requirements R746-700.22.B.6 and R746-700-22.C.1 RMP Attachment GRC FR R746-700-22.B.6-1 1st Supplemental – JAM Model RMP Attachment GRC FR R746-700-22.B.6-2 1st Supplemental – Cost of Service Model RMP Attachment GRC FR R746-700-22.B.6-3 1st Supplemental – Tax Model |
July 25, 2024 |
Order Granting Intervention of Stadion LLC |
July 23, 2024 |
Appendix A, Re: J. Randall Woolridge for the Office of Consumer Services |
July 19, 2024 |
Public Comments from July 19, 2024 |
July 18, 2024 |
Scheduling Order, Notice of Hearings, and Notice of Public Witness Hearing |
July 15, 2024 |
Public Comments from July 15, 2024 |
July 12, 2024 |
Petition to Intervene of Nucor Steel-Utah, a Division of Nucor Corporation |
July 12, 2024 |
Comments from the Division of Public Utilities DPU Attachment 1 – 2024 Analysis |
July 10, 2024 |
Petition for Leave to Intervene of Wal-Mart Stores, Inc. Exhibit 1 – Certificate of Good Standing |
July 9, 2024 |
Public Comments from July 9, 2024 |
July 9, 2024 |
Petition to Intervene of Stadion LLC Attachment A – Certificate of Good Standing |
July 5, 2024 |
Public Comments from July 5, 2024 |
July 3, 2024 |
Public Comments from July 3, 2024 |
July 3, 2024 |
Appendix A, Re: Joel Opio, Cayleigh Donahue, and Melissa Whitten for the Division of Public Utilities |
July 2, 2024 |
Public Comments from July 2, 2024 |
July 2, 2024 |
Appendix A, Re: Ron Nelson for the Office of Consumer Services |
July 1, 2024 |
Notice of Virtual Scheduling Conference |
July 1, 2024 |
Action Request, Due: July 12, 2024 |
June 28, 2024 |
Direct Testimony and Exhibits of Robert M. Meredith for Rocky Mountain Power RMP Meredith Workpapers |
June 28, 2024 |
Direct Testimony of Anna DeMers for Rocky Mountain Power RMP DeMers Workpapers |
June 28, 2024 |
Redacted Direct Testimony and Exhibits of Shelley E. McCoy for Rocky Mountain Power Direct Testimony and Exhibits of Shelley E. McCoy for Rocky Mountain Power [CONFIDENTIAL] RMP McCoy Workpapers RMP McCoy Workpapers [CONFIDENTIAL] |
June 28, 2024 |
Direct Testimony of Kenneth Lee Elder, Jr. for Rocky Mountain Power RMP Elder Workpapers |
June 28, 2024 |
Direct Testimony and Exhibits of Craig M. Eller for Rocky Mountain Power |
June 28, 2024 |
Redacted Direct Testimony and Exhibits of Jeffrey M. Wagner for Rocky Mountain Power Direct Testimony and Exhibits of Jeffrey M. Wagner for Rocky Mountain Power [CONFIDENTIAL] |
June 28, 2024 |
Redacted Direct Testimony and Exhibits of Timothy J. Hemstreet for Rocky Mountain Power Direct Testimony and Exhibits of Timothy J. Hemstreet for Rocky Mountain Power [CONFIDENTIAL] |
June 28, 2024 |
Direct Testimony of Richard A. Vail for Rocky Mountain Power |
June 28, 2024 |
Redacted Direct Testimony and Exhibits of Thomas R. Burns for Rocky Mountain Power Direct Testimony and Exhibits of Thomas R. Burns for Rocky Mountain Power [CONFIDENTIAL] RMP Burns Workpapers RMP Burns Workpapers [CONFIDENTIAL] |
June 28, 2024 |
Direct Testimony and Exhibits of Rick T. Link for Rocky Mountain Power RMP Link Workpapers RMP Link Workpapers [CONFIDENTIAL] |
June 28, 2024 |
Redacted Direct Testimony and Exhibits of Ramon J. Mitchell for Rocky Mountain Power Direct Testimony and Exhibits of Ramon J. Mitchell for Rocky Mountain Power [CONFIDENTIAL] RMP Mitchell Workpapers |
June 28, 2024 |
Direct Testimony and Exhibits of Allen L. Berreth for Rocky Mountain Power RMP Berreth Workpapers |
June 28, 2024 |
Redacted Direct Testimony of Mariya V. Coleman for Rocky Mountain Power Direct Testimony of Mariya V. Coleman for Rocky Mountain Power [CONFIDENTIAL] |
June 28, 2024 |
Direct Testimony and Exhibits of Frank Graves for Rocky Mountain Power |
June 28, 2024 |
Direct Testimony and Exhibits of Ann E. Bulkley for Rocky Mountain Power RMP Bulkley Workpapers RMP Bulkley Workpapers [CONFIDENTIAL] |
June 28, 2024 |
Redacted Direct Testimony and Exhibits of Nikki L. Kobliha for Rocky Mountain Power Direct Testimony and Exhibits of Nikki L. Kobliha for Rocky Mountain Power [CONFIDENTIAL] RMP Kobliha Workpapers RMP Kobliha Workpapers [CONFIDENTIAL] |
June 28, 2024 |
Direct Testimony of Joelle R. Steward for Rocky Mountain Power |
June 28, 2024 |
Direct Testimony of Richard J. Garlish for Rocky Mountain Power |
June 28, 2024 |
Rocky Mountain Power’s Application for General Rate Increase Filing Requirements Redacted FR Responses FR Responses [CONFIDENTIAL] Attachment GRC FR R746-700 A Attachment GRC FR R746-700 B Attachment GRC FR R746-700 B [CONFIDENTIAL] Attachment GRC FR R746-700 C Attachment GRC FR R746-700 C [CONFIDENTIAL] Attachment GRC FR R746-700 D Attachment GRC FR R746-700 D [CONFIDENTIAL] |
May 10, 2024 |
Order Granting Intervention of Utah Clean Energy |
May 2, 2024 |
Appendix A, Re: Philip Hayet, Leah J. Wellborn, and Evelyn Menendez for the Utah Office of Consumer Services |
April 30, 2024 |
Rocky Mountain Power’s Update to Notice of Intent to File General Rate Case |
April 23, 2024 |
Appendix A, Re: Donna Ramas for the Office of Consumer Services |
April 23, 2024 |
Order Granting Intervention of Western Resource Advocates |
April 19, 2024 |
Appendix A, Re: Sarah Puzzo, Logan Mitchell, Josh Craft, and Jennifer Eden for Utah Clean Energy |
April 19, 2024 |
Petition for Leave to Intervene of Utah Clean Energy |
April 11, 2024 |
Appendix A, Re: Dan Koehler, Philip DiDomenico, Aliea Afnan Munger, Karan Pol, Saeid R. Dindarloo, John G. Athas, Thomas A. D’Ambrosia, and Stan Faryniarz for the Division of Public Utilities |
April 5, 2024 |
Redacted Corrected Rocky Mountain Power’s SER Filing Requirement A.3 Corrected Rocky Mountain Power’s SER Filing Requirement A.3 [CONFIDENTIAL] |
April 4, 2024 |
Rocky Mountain Power’s 1st Supplemental SER Filing Requirement A.11 RMP Attachment SER FR A.11-3k – Rock Creek II Wind Operations and Maintenance Agreement [CONFIDENTIAL] |
March 27, 2024 |
Rocky Mountain Power’s Filing Requirements for Waiver of Significant Energy Resource Decision Projects Redacted SER Filing Requirements Responses SER Filing Requirements Responses [CONFIDENTIAL] Filing Requirements RMP SER FR A.1 [CONFIDENTIAL] RMP SER FR A.4 [CONFIDENTIAL] RMP SER FR A.5 [CONFIDENTIAL] RMP SER FR A.5-1 – Supporting Workpapers [CONFIDENTIAL] RMP SER FR A.5-1 Supporting Workpapers [Highly CONFIDENTIAL] RMP SER FR A.8 [CONFIDENTIAL] RMP SER FR A.9 [CONFIDENTIAL] RMP SER FR A.11 [CONFIDENTIAL] RMP SER FR C.1 RMP SER FR C.2 [CONFIDENTIAL] RMP SER FR D.1 [CONFIDENTIAL] RMP SER FR D.2 [CONFIDENTIAL] RMP SER FR D.4 [CONFIDENTIAL] RMP SER FR E.1 – Aurora Archive [CONFIDENTIAL] RMP SER FR E.1 – NPC Reports [CONFIDENTIAL] |
March 25, 2024 |
Appendix A, Re: Sophie Hayes, Karl Boothman, Nancy Kelly, and Jessica Loeloff for Western Resource Advocates |
March 25, 2024 |
Petition to Intervene of Western Resource Advocates |
March 18, 2024 |
Reporter’s Transcript, Re: March 4, 2024 |
March 11, 2024 |
Order Approving Test Period |
March 4, 2024 |
Recorded Live Stream of Virtual Hearing on Test Period Held on March 4, 2024 |
February 26, 2024 |
Order Granting Intervention of the Utah Association of Energy Users |
February 23, 2024 |
Direct Testimony of Gary Smith for the Division of Public Utilities DPU Exhibit 1.1 – Large Capital Projects to be Included in Utah General Rate Case [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
February 21, 2024 |
Public Comments from February 21, 2024 |
February 2, 2024 |
Appendix A, Re: Phillip J. Russell, Courtney Higgins, Kevin Higgins, Neal Townsend, Justin Bieber, Rebecca Forbes, Jason Kiengsiri, and Shantell Garrett for the Utah Association of Energy Users |
February 2, 2024 |
Petition to Intervene of the Utah Association of Energy Users |
January 31, 2024 |
Scheduling Order and Notice of Virtual Hearing on Test Period |
January 25, 2024 |
Notice of Virtual Scheduling Conference |
January 24, 2024 |
Rocky Mountain Power’s Notice of Intent to File a General Rate Case and Request for Approval of Test Period Direct Testimony on Test Period of Shelley E. McCoy |
Share this: