May 2013 Filing Log

The documents are listed by date, docket number(s), (number of copies filed),
NAME OF DOCUMENT, and a description

May 2013
5/1/2013 12-035-100
(11)  OFFICE OF CONSUMER SERVICES’ RESPONSE TO FIRST SET OF DATA REQUESTS OF KENNECOTT UTAH COPPER, LLC AND TESORO REFINING & MARKETING COMPANY LLC  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/1/2013 13-2204-01
(6)  RESPONSE TO ORDER GRANTING INTERVENTION AND RESPONSE TO REQUEST FOR TECHNICAL CONFERENCE; AND REQUEST TO IMPOSE CONDITIONS ON CARBON/EMERY’S INTERVENTION  In the Matter of the Petition of Qwest Communications Company, LLC to Amend its Certificate of Public Convenience and Necessity No. 2204
5/1/2013 13-035-69
(11)  ROCKY MOUNTAIN POWER’S FOSSIL FUEL ENERGY EFFICIENCY STANDARD PLAN FOR 2013  In the Matter of Rocky Mountain Power’s Fossil Fuel Heat Rate Improvement Plan for 2013
5/1/2013 13-035-70
(11)  ROCKY MOUNTAIN POWER’S SERVICE QUALITY REVIEW REPORT FOR JANUARY 1 – DECEMBER 31, 2012  In the Matter of Rocky Mountain Power’s Service Quality Review Report
5/1/2013 13-035-71
(11)  ROCKY MOUNTAIN POWER’S DEMAND-SIDE MANAGEMENT 2012 ANNUAL ENERGY EFFICIENCY AND PEAK LOAD REDUCTION REPORT  In the Matter of Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report
5/1/2013 13-2431-01
(6)  JOINT APPLICATION  In the Matter of the Joint Application of TNCI Operating Company LLC, Assignee, and Trans National Communications International, Inc. (Debtor-In-Possession), Assignor, for (1) Approval for Assignee to Acquire the Customers and Certain Assets, Including the Certificate of Public Convenience and Necessity, of Assignor and (2) Waiver of Utah Code Ann. § 54-8b-18 and Commission Rule R746-349-5
CONTAINS PROPRIETARY EXHIBITS
5/2/2013 12-035-100
(1)  EMAIL CORRESPONDENCE FROM NAOMI FRANKLIN, RESEARCH PROFESSOR OF BIOLOGY, UNIVERSITY OF UTAH  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/2/2013 12-035-100
(1)  CORRESPONDENCE FROM BILL BARRON AND DAVE FOLLAND, UTAH CHAPTER OF THE CITIZENS CLIMATE LOBBY  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/2/2013 13-035-32
(1)  APPENDIX A RE: KEVIN C. HIGGINS, COURTNEY HIGGINS, NEAL TOWNSEND, JUSTIN FARR, AND OLIWIA SMITH  In the Matter of the Application of Rocky Mountain Power to Increase the Deferred EBA Rate through the Energy Balancing Account Mechanism
5/2/2013 13-057-03
(8)  APPLICATION  In the Matter of the Pass-Through Application of Questar Gas Company for an Adjustment in Rates and Charges for Natural Gas Service in Utah
5/2/2013 00-035-T01
(1) COMMENTS FROM HEAL UTAH Re: PacifiCorp – In the Matter of the Blue Sky Program, Schedule 70.
5/2/2013 13-035-33
(1)  APPENDIX A RE: KEVIN C. HIGGINS, COURTNEY HIGGINS, NEAL TOWNSEND, JUSTIN FARR, AND OLIWIA SMITH  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account
5/3/2013 13-2509-01
(6)  COMMENTS FROM DPU  In the Matter of dishNET Wireline L.L.C.’s Notice of Intracorporate Reorganization
5/3/2013 13-035-64
(6)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/3/2013 13-035-65
(6)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/3/2013 13-035-66
(6)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/3/2013 13-035-67
(6)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/3/2013 13-035-68
(6)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: MANTI TELEPHONE COMPANY  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: CARBON EMERY TELCOM  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: EMERY TELCOM  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: HANKSVILLE TELCOM  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: QWEST CORPORATION  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: SOUTH CENTRAL UTAH TELEPHONE ASSOCIATION  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: UBTA-UBET COMMUNICATIONS DBA STRATANETWORKS  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: DIRECT COMMUNICATIONS CEDAR VALLEY  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: GUNNISON TELEPHONE COMPANY  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: BEEHIVE TELEPHONE COMPANY, INC.  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: UNION TELEPHONE COMPANY  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: ALL WEST COMMUNICATIONS, INC.  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: CENTRAL UTAH TELEPHONE  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: BEAR LAKE COMMUNICATIONS  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/3/2013 13-999-05
(6)  COMMENTS FROM DPU RE: SKYLINE TELECOM  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/6/2013 12-2559-01
(5)  STIPULATION AND SETTLEMENT AGREEMENT  In the Matter of the Petition of Blue Jay Wireless, LLC for Designation as an Eligible Telecommunications Carrier for the Purpose of Offering Lifeline Service on a Wireless Basis
5/6/2013 13-035-53
(11)  COMMENTS FROM OCS  In the Matter of the Notice of an Optional New Application Process for the New Homes Program, Rocky Mountain Power Demand-Side Management
5/6/2013 13-035-53
(12)  COMMENTS FROM DPU  In the Matter of the Notice of an Optional New Application Process for the New Homes Program, Rocky Mountain Power Demand-Side Management
5/6/2013 12-2443-01
(6)  COMMENTS FROM DPU  In the Matter of the Application of WaterPro Inc. for a Culinary Water Rate Case
5/6/2013 12-035-100
(11)  MOTION FOR ODER PERMITTING RANDALL J. FALKENBERG TO APPEAR AT HEARING TELEPHONICALLY  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/6/2013 13-035-73
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/6/2013 13-035-74
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/6/2013 13-035-75
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/6/2013 13-035-76
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/6/2013 13-035-77
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/6/2013 13-999-03
(1)  COURTESY COPY OF SECTION 63.71 APPLICATION OF MCI COMMUNICATIONS SERVICES, INC. D/B/A VERIZON BUSINESS SERVICES INC.  In the Matter of the Miscellaneous Correspondence and Reports Regarding Telecommunications Utility Services; 2013
5/7/2013 13-2508-T01
(1) TARIFF Re: Ticaboo Utility Improvement District – Ticaboo Utility Improvement District Revised Tariff No. 1
5/7/2013 13-035-56
(6)  PETITION TO WITHDRAW OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/8/2013 12-035-100
(11)  COMMENTS FROM IMATTER UTAH  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/8/2013 13-999-03
(1)  COURTESY COPY OF SECTION 63.71 APPLICATION OF XO COMMUNICATIONS, LLC  In the Matter of the Miscellaneous Correspondence and Reports Regarding Telecommunications Utility Services; 2013
5/9/2013 13-2457-P01
(3) PRICE LIST Re: Metropolitan Telecommunications of Utah, Inc. – The purpose of this filing is to comply with the Federal Communications Commission in its Report and Order in WC Docket Nos. 10-90, etc., FCC Release No. 11-161 issued November 18, 2011 (“the Order”).
5/9/2013 13-999-05
(6)  COMMENTS FROM DPU  In the Matter of the 2013 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
5/9/2013 13-035-19
(11)  REQUEST FOR APPROVAL OF CUSTOMER SERVICE AGREEMENT  In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Steven Cote
5/9/2013 13-035-78
(11)  REQUEST FOR APPROVAL OF CUSTOMER SERVICE AGREEMENT  In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Jason Van Orman
5/10/2013 12-2559-01
(1)  REPORTER’S TRANSCRIPT RE: MAY 7, 2013  In the Matter of the Petition of Blue Jay Wireless, LLC for Designation as an Eligible Telecommunications Carrier for the Purpose of Offering Lifeline Service on a Wireless Basis
5/10/2013 10-2528-01
(6)  COMMENTS FROM DPU  In the Matter of the Resolution of Certain Issues Related to the Designation of a Common Carrier as an Eligible Telecommunications Carrier
5/13/2013 13-049-11
(1)  INTERCONNECTION AGREEMENT  In the Matter of the Interconnection Agreement between Qwest Corporation dba CenturyLink QC and YipTel, LLC
5/13/2013 13-049-12
(1)  INTERCONNECTION AGREEMENT  In the Matter of the Interconnection Agreement between Qwest Corporation dba CenturyLink QC and YipTel, LLC
5/13/2013 12-035-100
(11)  COMMENTS FROM MAYOR RALPH BECKER  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/13/2013 13-035-79
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/13/2013 13-035-80
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/13/2013 13-035-81
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/13/2013 13-035-82
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/13/2013 13-035-83
(6)  PETITION OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/14/2013 13-035-62
(6)  PETITION TO WITHDRAW OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/14/2013 13-035-75
(6)  PETITION TO WITHDRAW OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/14/2013 13-035-48
(1)  REPORTER’S TRANSCRIPT RE: MAY 14, 2013  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/15/2013 12-035-100
(13)  REBUTTAL TESTIMONY OF MAURICE BRUBAKER ON BEHALF OF KENNECOTT UTAH COPPER, LLC AND TESORO REFINING & MARKETING COMPANY LLC  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/15/2013 12-035-100
(13)  REBUTTAL TESTIMONY OF PAUL H. CLEMENTS AND GREGORY N. DUVALL FOR ROCKY MOUNTAIN POWER  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/15/2013 12-035-100
(11)  COMMENTS FROM SUNEDISON, LLC IN RESPONSE TO DIRECT TESTIMONY  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/15/2013 12-035-100
(11)  REBUTTAL TESTIMONY OF SARAH WRIGHT ON BEHALF OF UTAH CLEAN ENERGY  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/15/2013 12-035-100
(12)  REBUTTAL TESTIMONY OF ABDINASIR M. ABDULLE, PH.D. FOR THE DIVISION OF PUBLIC UTILITIES  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/15/2013 12-035-100
(13)  REBUTTAL TESTIMONY OF BELA VASTAG FOR THE OFFICE OF CONSUMER SERVICES  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/15/2013 12-035-100
(13)  REBUTTAL TESTIMONY OF RANDALL J. FALKENBERG ON BEHALF OF THE OFFICE OF CONSUMER SERVICES  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
CONTAINS PROPRIETARY EXHIBITS
5/15/2013 13-049-13
(6)  PETITION TO DEVIATE FROM AND/OR WAIVE THE END-USER SERVICE QUALITY RULES ONLY APPLICABLE TO CENTURYLINK  In the Matter of the Petition of Qwest Corporation dba CenturyLink QC for Approval to Deviate from and/or Waive the End-User Service Quality Rules only Applicable to CenturyLink
CONTAINS PROPRIETARY EXHIBITS
5/15/2013 13-040-T01
(3) COMMENTS FROM DPU Re: Central Utah Telephone, Inc. – Central Utah is revising its tariff to grandfather its Emergency Line Service.
5/15/2013 13-576-T01
(3) COMMENTS FROM DPU Re: Skyline Telecom – Skyline is revising its tariff to grandfather its Emergency Line Service.
5/15/2013 13-2201-T01
(3) COMMENTS FROM DPU Re: Bear Lake Communications, Inc. – Bear Lake is revising its tariff to grandfather its Emergency Line Service.
5/15/2013 12-035-101
(11)  COMMENTS FROM OCS  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Tariff Schedule No. 38, Qualifying Facility Procedures
5/15/2013 12-035-101
(12)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Tariff Schedule No. 38, Qualifying Facility Procedures
5/15/2013 13-035-63
(12)  COMMENTS FROM DPU  In the Matter of Rocky Mountain Power’s 2013 Avoided Cost Input Changes Quarterly Compliance Filing
5/15/2013 13-R405-01
(12)  COMMENTS FROM DPU  In the Matter of Amendment to Rule 746-405 Filing of Tariffs for Gas, Electric, Telephone, and Water Utilities
5/16/2013 12-035-100
(9)  ENERGY OF UTAH LLC’S RESPONSE TO DATA REQUESTS OF ROCKY MOUNTAIN POWER  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/16/2013 13-R200-01
(6)  COMMENTS FROM DPU  In the Matter of Amendment to Rule 746-200 Residential Utility Service Rules for Electric, Gas, Water, and Sewer Utilities
5/16/2013 12-035-100
(6)  MOTION AND CONSENT OF SPONSORING LOCAL COUNSEL FOR PRO HAC VICE ADMISSION OF DANIEL R. SIMON  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
CONTAINS A PROPRIETARY EXHIBIT
5/16/2013 13-035-74
(4)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/16/2013 13-035-76
(4)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/17/2013 13-035-83
(4)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/17/2013 13-035-82
(4)  COMMENTS FROM DPU  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/17/2013 13-2414-P01
(3) PRICE LIST Re: Granite Telecommunications, LLC – With this submission, Granite complies with the July 1, 2013 interstate access rate benchmarking requirement set forth in Section 51.911(c) of the Federal Communications Commission’s (“FCC”) rules, 47 C.F.R. § 51.911(c), Access Reciprocal Compensation Rates for Competitive LECs, promulgated under the USF/ICC Transformation Order, as amended.
5/17/2013 13-049-11
(6)  COMMENTS FROM DPU  In the Matter of the Interconnection Agreement between Qwest Corporation dba CenturyLink QC and YipTel, LLC
5/17/2013 13-049-12
(6)  COMMENTS FROM DPU  In the Matter of the Interconnection Agreement between Qwest Corporation dba CenturyLink QC and YipTel, LLC
5/17/2013 12-035-92
(1)  ROCKY MOUNTAIN POWER’S PETITION FOR CLARIFICATION – REDACTED  In the Matter of the Voluntary Request of Rocky Mountain Power for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4
5/17/2013 12-035-92
(11)  ROCKY MOUNTAIN POWER’S PETITION FOR CLARIFICATION – CONFIDENTIAL  In the Matter of the Voluntary Request of Rocky Mountain Power for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4
5/17/2013 07-035-T14
(11) ERRATA ANNUAL REPORT FOR THE SOLAR PHOTOVOLTAIC INCENTIVE PROGRAM FOR YEAR 2012 Re: PacifiCorp – In the Matter of the Approval of Rocky Mountain Power’s Tariff P.S.C.U. No. 47, Re: Schedule 107 – Solar Incentive Program
5/17/2013 13-035-19
(1)  REDACTED REQUEST FOR APPROVAL OF CUSTOMER SERVICE AGREEMENT  In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Steven Cote
5/17/2013 13-035-78
(1)  REDACTED REQUEST FOR APPROVAL OF CUSTOMER SERVICE AGREEMENT  In the Matter of the Application of Rocky Mountain Power for Approval of its Customer Service Agreement with Spring City, Utah and Jason Van Orman
5/17/2013
13-035-32

(11)  REPLACEMENT PAGES TO THE DIRECT TESTIMONY OF STEFAN BIRD ORIGINALLY FILED ON MARCH 15, 2013  In the Matter of the Application of Rocky Mountain Power to Increase the Deferred EBA Rate through the Energy Balancing Account Mechanism
5/17/2013
13-049-02

(1)  MAY PAYMENTS  In the Matter of the 2013 Qwest Performance Assurance Plan (QPAP)
5/20/2013 12-035-100
(1)  APPENDIX A RE: KIMBERLY CERUTI  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/20/2013 13-999-02
(1)  QUESTAR GAS COMPANY’S DECLARATION OF DIVIDEND  In the Matter of the Miscellaneous Correspondence and Reports Regarding Gas Utility Services; 2013
5/21/2013 13-035-32
(1)  APPENDIX A RE: RANDY FALKENBERG AND LAUREN FALKENBERG  In the Matter of the Application of Rocky Mountain Power to Increase the Deferred EBA Rate through the Energy Balancing Account Mechanism
5/21/2013 13-2462-P01
(3) PRICE LIST Re: OrbitCom, Inc. – In this filing, OrbitCom is reducing the total amount it charges for terminating intrastate access to match the total it charges for terminating interstate access.
5/21/2013 13-035-89
(11)  APPLICATION  In the Matter of the Application of Rocky Mountain Power for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140
CONTAINS PROPRIETARY EXHIBITS
5/23/2013 13-035-82
(1)  CORRESPONDENCE FROM CUSTOMER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric Service
5/24/2013 13-R200-01
(1) Comments from RMP: In the Matter of the Recommended Changes to Rule R746-200 Re: Residential Utility Service Rules for Electric, Gas, Water, and Sewer Utilities.
5/28/2013 09-057-16
(8)  COMMENTS FROM DPU  In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications
5/28/2013 13-035-88
(6)  PETITION TO WITHDRAW OF ROCKY MOUNTAIN POWER  In the Matter of the Petition of Rocky Mountain Power for Approval to Terminate Electric
5/29/2013 13-R200-01
(1) Comments from Questar: In the Matter of the Recommended Changes to Rule R746-200 Re: Residential Utility Service Rules for Electric, Gas, Water, and Sewer Utilities.
5/29/2013 13-035-72
(11)  COMMENTS FROM DPU  In the Matter of PacifiCorp’s Financial Reports
5/29/2013 13-2431-01
(6)  COMMENTS FROM DPU  In the Matter of the Joint Application of TNCI Operating Company LLC, Assignee, and Trans National Communications International, Inc. (Debtor-In-Possession), Assignor, for (1) Approval for Assignee to Acquire the Customers and Certain Assets, Including the Certificate of Public Convenience and Necessity, of Assignor and (2) Waiver of Utah Code Ann. § 54-8b-18 and Commission Rule R746-349-5
5/29/2013 13-2208-P01
(8) PRICE LIST Re: XO Communications Services, LLC – These revisions increase the insufficient funds charge, and modify Regulation language.
5/29/2013 13-2208-P02
(9) PRICE LIST Re: XO Communications Services, LLC – This filing revises Regulations language.
5/29/2013 13-041-T03
(3) TARIFF Re: Citizens Telecommunications Company of Utah d/b/a Frontier Communications of Utah – The purpose of this filing is to revise the tariff rates as required in the FCC’s November 18, 2011 Report and Order and Further Notice of Proposed Rulemaking in WC Docket Nos. 10-90, etc. (FCC 11-161).
5/29/2013 13-040-T02
(3) TARIFF Re: Central Utah Telephone, Inc. – Proposed revisions are made in compliance with current Federal Communications Commission (FCC) rules governing intercarrier compensation.
5/29/2013 13-2201-T02
(1) TARIFF Re: Bear Lake Communications, Inc. – Proposed revisions are made in compliance with current Federal Communications Commission (FCC) rules governing intercarrier compensation.
5/29/2013 13-576-T02
(1) TARIFF Re: Skyline Telecom – Proposed revisions are made in compliance with current Federal Communications Commission (FCC) rules governing intercarrier compensation.
5/30/2013 13-999-02
(11)  COMMENTS FROM DPU  In the Matter of the Miscellaneous Correspondence and Reports Regarding Gas Utility Services; 2013
5/30/2013 12-035-100
(13)  SURREBUTTAL TESTIMONY OF GREGORY N. DUVALL  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 12-035-100
(13)  SURREBUTTAL TESTIMONY OF BELA VASTAG FOR THE OFFICE OF CONSUMER SERVICES  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 12-035-100
(13)  SURREBUTTAL TESTIMONY OF RANDALL J. FALKENBERG ON BEHALF OF THE OFFICE OF CONSUMER SERVICES  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
CONTAINS A PROPRIETARY EXHIBIT
5/30/2013 12-035-100
(11)  SURREBUTTAL TESTIMONY OF SARAH WRIGHT ON BEHALF OF UTAH CLEAN ENERGY  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 12-035-100
(13)  SURREBUTTAL TESTIMONY OF MAURICE BRUBAKER ON BEHALF OF KENNECOTT UTAH COPPER, LLC AND TESORO REFINING & MARKETING COMPANY LLC  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 12-035-100
(10)  SURREBUTTAL TESTIMONY OF ROCCO VRBA FOR ENERGY OF UTAH  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 12-035-100
(14)  SURREBUTTAL TESTIMONY OF ABDINASIR M. ABDULLE, PH.D. FOR THE DIVISION OF PUBLIC UTILITIES  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 12-035-100
(10)  SURREBUTTAL TESTIMONY OF ROBERT MILLSAP FOR RENEWABLE ENERGY ADVISORS  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 12-035-100
(13)  SURREBUTTAL TESTIMONY OF LUIGI RESTA  In the Matter of the Application of Rocky Mountain Power for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts
5/30/2013 13-035-72
(11)  PACIFICORP’S QUARTERLY FINANCING ACTIVITY REPORT FOR THE PERIOD ENDED MARCH 31, 2013  In the Matter of PacifiCorp’s Financial Reports
5/30/2013 10-2528-01
(1) CORRESPONDENCE FROM DEPARTMENT OF WORKFORCE SERVICES In the Matter of the Resolution of Certain Issues Related to the Designation of a Common Carrier as an Eligible Telecommunications Carrier
5/30/2013 13-2508-T01
(11) COMMENTS FROM DPU Re: Ticaboo Utility Improvement District – Ticaboo Utility Improvement District Revised Tariff No. 1
5/30/2013 07-035-T14
(11) COMMENTS FROM DPU Re: PacifiCorp – In the Matter of the Approval of Rocky Mountain Power’s Tariff P.S.C.U. No. 47, Re: Schedule 107 – Solar Incentive Program
5/30/2013 13-2509-P02
(3) PRICE LIST Re: dishNET Wireline L.L.C. – With this submission, dishNET complies with the July 1, 2013 interstate access rate benchmarking requirement set forth in Section 51.911(c) of the Federal Communications Commission’s (“FCC”) rules, 47 C.F.R. § 51.911(c), Access Reciprocal Compensation Rates for Competitive LECs, promulgated under the USF/ICC Transformation Order.
5/31/2013 08-046-01
(6)  STIPULATION REGARDING STAY OF USF PAYBACK  In the Matter of the Application for the Increase of Rates and Charges by Manti Telephone Company
5/31/2013 13-035-72
(1)  PACIFICORP’S ANNUAL FERC FORM NO. 1 FOR THE YEAR ENDED DECEMBER 31, 2012  In the Matter of PacifiCorp’s Financial Reports
5/31/2013 13-057-04
(8)  QUESTAR GAS COMPANY’S INTEGRATED RESOURCE PLAN (IRP)  In the Matter of Questar Gas Company’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2013 to May 31, 2014
5/31/2013 13-2180-T01
(3) TARIFF Re: All West Communications, Inc. – This filing revises All West’s Terminating Local Transport Termination Charge from $0.026/min to $0.002171/min., and adds a rate element for Local Transport Facility Charges for originating and terminating traffic at the rate of $0.000418 per mile.
5/31/2013 13-2208-P03
(9) PRICE LIST Re: XO Communications Services, LLC – These revisions adjust terminating intrastate switched access rates to match interstate rates.
5/31/2013 13-049-P01
(1) PRICE LIST Re: Qwest Corporation d/b/a CenturyLink QC – This filing reduces the Early Termination Fees for Business customers who have entered into a Core Connect Professional term agreement but who terminate their service in whole or in part prior to the expiration of their term.
5/31/2013 13-049-T01
(6) TARIFF Re: Qwest Corporation d/b/a CenturyLink QC – This filing is the second step in implementing the “Transitional Intrastate Access Service” reductions mandated by the Federal Communications Commission’s November 18, 2011 Report and Order and Further Notice of Proposed Rulemaking in WC Docket Nos. 10-90, etc. (FCC 11-161).
CONTAINS A PROPRIETARY EXHIBIT
5/31/2013 13-040-T01
(3) AMENDED TARIFF PAGE Re: Central Utah Telephone, Inc. – Central Utah is revising its tariff to grandfather its Emergency Line Service.
5/31/2013 13-2201-T01
(3) AMENDED TARIFF PAGE Re: Bear Lake Communications, Inc. – Bear Lake is revising its tariff to grandfather its Emergency Line Service.
5/31/2013 13-576-T01
(3) AMENDED TARIFF PAGE Re: Skyline Telecom – Skyline is revising its tariff to grandfather its Emergency Line Service.
5/31/2013 13-035-T09
(3) TARIFF Re: PacifiCorp –
5/31/2013 13-051-01
(6)  PETITION  In the Matter of the Petition of Beehive Telephone Company, Inc. for an Immediate Increase in Rates; and Notice to the Commission and the Company’s Subscribers
CONTAINS PROPRIETARY EXHIBITS
5/31/2013 13-035-69
(11)  COMMENTS FROM DPU  In the Matter of Rocky Mountain Power’s Fossil Fuel Heat Rate Improvement Plan for 2013
5/31/2013 13-035-70
(11)  COMMENTS FROM DPU  In the Matter of Rocky Mountain Power’s Service Quality Review Report