9/30/2021 | Docket No. 20-035-34 ENTRY OF APPEARANCE FOR EVGO SERVICES, LLC Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/30/2021 | Docket No. 20-035-34 PETITION FOR LEAVE TO INTERVENE OF EVGO SERVICES, LLC Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/30/2021 | Docket No. 21-035-42 APPENDIX A, RE: JUSTIN BIEBER FOR THE UTAH ASSOCIATION OF ENERGY USERS Rocky Mountain Power’s Application for Alternative Cost Recovery for Major Plant Additions of the Pryor Mountain and TB Flats Wind Projects |
9/30/2021 | Docket No. 21-999-09 NOTICE OF SIGNIFICANT CHANGE FOR KINDER MORGAN’S OPERATOR QUALIFICATION TASKS Pipeline and Hazardous Material Safety Administration (PHMSA) Incident Reports and Miscellaneous Notifications Filed in 2021 |
9/29/2021 | Docket No. 17-035-61 PUBLIC COMMENTS FROM SEPTEMBER 29, 2021 Application of Rocky Mountain Power to Establish Export Credits for Customer Generated Electricity |
9/29/2021 | Docket No. 21-999-02 E-SERVICE CIG’S REMOVAL OF NON-CONFORMING AGREEMENT FILING OF COLORADO INTERSTATE GAS COMPANY, LLC – FERC DOCKET NO. RP21-1165-000 Miscellaneous Correspondence and Reports Regarding Gas Utility Services; 2021 |
9/28/2021 | Docket No. 21-999-10 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Universal Service and Speech/Hearing Impaired Funds Status Reports [CONTAINS CONFIDENTIAL EXHIBIT] |
9/28/2021 | Docket No. 21-035-09 APPENDIX A, RE: CHRISTOPHER LEGER, LISA TORMOEN HICKEY, AND NATE BLOUIN FOR INTERWEST ENERGY ALLIANCE PacifiCorp’s 2021 Integrated Resource Plan |
9/27/2021 | Docket No. 21-035-14 ROCKY MOUNTAIN POWER’S POST-HEARING LEGAL BRIEF Application of Rocky Mountain Power to Establish a Balancing Account for Pension Settlement Adjustments |
9/27/2021 | Docket No. 21-035-14 POST-HEARING BRIEF OF THE UTAH ASSOCIATION OF ENERGY USERS Application of Rocky Mountain Power to Establish a Balancing Account for Pension Settlement Adjustments |
9/27/2021 | Docket No. 21-035-14 DIVISION OF PUBLIC UTILITIES’ POST-HEARING BRIEF Application of Rocky Mountain Power to Establish a Balancing Account for Pension Settlement Adjustments |
9/27/2021 | Docket No. 20-035-34 CORRECTED CONFIDENTIALITY AND NON-DISCLOSURE AGREEMENT BETWEEN PACIFICORP D/B/A ROCKY MOUNTAIN POWER AND SCOTT F. DUNBAR, AS COUNSEL FOR CHARGEPOINT, INC. Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/27/2021 | Docket No. 21-035-14 REDACTED OFFICE OF CONSUMER SERVICES’ POST-HEARING BRIEF Application of Rocky Mountain Power to Establish a Balancing Account for Pension Settlement Adjustments Docket No. 21-035-14 OFFICE OF CONSUMER SERVICES’ POST-HEARING BRIEF Application of Rocky Mountain Power to Establish a Balancing Account for Pension Settlement Adjustments |
9/27/2021 | Docket No. 21-035-09 APPENDIX A, RE: HUNTER HOLMAN, KATE BOWMAN, AND KEVIN EMERSON FOR UTAH CLEAN ENERGY PacifiCorp’s 2021 Integrated Resource Plan |
9/27/2021 | Docket No. 20-035-34 CONFIDENTIALITY AND NON-DISCLOSURE AGREEMENT BETWEEN PACIFICORP D/B/A ROCKY MOUNTAIN POWER AND SCOTT F. DUNBAR, AS COUNSEL FOR CHARGEPOINT, INC. Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/27/2021 | Docket No. 21-035-16 TECHNICAL ASSISTANCE TO STATE PUBLIC UTILITY COMMISSIONS, DRAFT APPLICATION FORM WITH THE DEPARTMENT OF ENERGY Collaborative Stakeholder Process for Rocky Mountain Power’s Grid Modernization and Rate Design |
9/24/2021 | Docket Nos. 20-025-01, 20-027-01, 20-028-02, 20-030-01, 20-031-01, 20-032-01, and 20-066-02 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Empire Electric Association, Inc.’s Wildland Fire Protection Plan; Flowell Electric Association, Inc.’s Wildland Fire Protection Plan; Garkane Energy Cooperative, Inc.’s Wildland Fire Protection Plan; Moon Lake Electric Association’s Wildland Fire Protection Plan; Mt. Wheeler Power, Inc.’s Wildland Fire Protection Plan; Raft River Rural Electric Cooperative’s Wildland Fire Protection Plan; AND Dixie Power’s Wildland Fire Protection Plan |
9/24/2021 | Docket No. 21-035-29 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Rocky Mountain Power’s Fourth Annual Sustainable Transportation and Energy Plan Act (“STEP”) Program Status Report |
9/24/2021 | Docket No. 21-094-01 REQUEST Sprint Communications Company L.P.’s Request to Cancel Certificate to Provide Competitive Local Exchange and Interexchange Telecommunications Services |
9/24/2021 | Docket Nos. 21-506-01 and 20-506-02 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Deseret Generation & Transmission Cooperative’s Wildland Fire Protection Plan |
9/24/2021 | Docket No. 21-035-29 COMMENTS FROM THE OFFICE OF CONSUMER SERVICES Rocky Mountain Power’s Fourth Annual Sustainable Transportation and Energy Plan Act (“STEP”) Program Status Report |
9/24/2021 | Docket Nos. 16-2590-01 and 17-2590-01 NOTICE OF BOOMERANG WIRELESS, LLC D/B/A ENTOUCH WIRELESS DISTRIBUTING LIFELINE BENEFIT AND THE EMERGENCY BROADBAND BENEFIT WITHIN UTAH Application of Boomerang Wireless, LLC d/b/a enTouch Wireless for Designation as a Federal Eligible Telecommunications Carrier in the State of Utah for the Limited Purpose of Offering Wireless Lifeline Service to Qualified Households (Low Income Only) AND Notice by Boomerang Wireless, LLC d/b/a enTouch Wireless Re: Updated Lifeline Plan Description |
9/23/2021 | Docket No. 21-057-01 PETITION TO INTERVENE OF THE UTAH ASSOCIATION OF ENERGY USERS Dominion Energy Utah’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2021 to May 31, 2022 |
9/23/2021 | Docket No. 21-035-46 REPLY COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Rocky Mountain Power’s 2021 Net Metering and Interconnection Report |
9/23/2021 | Docket No. 21-035-46 ROCKY MOUNTAIN POWER’S REPLY COMMENTS Rocky Mountain Power’s 2021 Net Metering and Interconnection Report |
9/22/2021 | Docket No. 21-035-43 CORRESPONDENCE FROM COMPLAINANT Formal Complaint of Erin and Geromie Clavell against Rocky Mountain Power |
9/22/2021 | Docket No. 21-035-T10 ROCKY MOUNTAIN POWER’S REDACTED REPLY COMMENTS Application of Rocky Mountain Power for Approval of Billing for Other Entities Tariff, Electric Service Schedule No. 299 Docket No. 21-035-T10 ROCKY MOUNTAIN POWER’S REPLY COMMENTS Application of Rocky Mountain Power for Approval of Billing for Other Entities Tariff, Electric Service Schedule No. 299 |
9/22/2021 | Docket No. 21-999-01 PACIFICORP’S ERRATA TO THE SERVICE AGREEMENT 1029 WITH UTAH ASSOCIATED MUNICIPAL POWER SYSTEMS REGARDING SELF-SUPPLY OF ANCILLARY SERVICE SCHEDULES 5 AND 6 – FERC DOCKET NO. ER21-2909-000 Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 |
9/22/2021 | Docket No. 21-057-01 REDACTED TECHNICAL CONFERENCE PRESENTATION Dominion Energy Utah’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2021 to May 31, 2022 Docket No. 21-057-01 TECHNICAL CONFERENCE PRESENTATION Dominion Energy Utah’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2021 to May 31, 2022 |
9/22/2021 | Docket No. 21-035-09 APPENDIX A, RE: PHILLIP J. RUSSELL AND DONALD HENDRICKSON FOR THE UTAH ASSOCIATION OF ENERGY USERS PacifiCorp’s 2021 Integrated Resource Plan |
9/22/2021 | Docket No. 21-035-09 PETITION TO INTERVENE OF THE UTAH ASSOCIATION OF ENERGY USERS PacifiCorp’s 2021 Integrated Resource Plan |
9/21/2021 | Docket No. 18-035-28 PUBLIC COMMENTS FROM SEPTEMBER 21, 2021 Rocky Mountain Power’s Customer Owned Generation and Net Metering Report and Attachment A for the Period April 1, 2017 through March 31, 2018 |
9/21/2021 | Docket No. 21-999-01 REQUEST OF PACIFICORP FOR LIMITED WAIVER OF TARIFF, SHORTENED COMMENT PERIOD AND EXPEDITED ACTION – FERC DOCKET NO. ER21-2918-000 Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 |
9/21/2021 | Docket No. 21-R008-04 REPLY COMMENTS OF THE UTAH RURAL TELECOM ASSOCIATION Request for Rulemaking Regarding Utah Universal Service Fund |
9/21/2021 | Docket No. 21-035-53 REDACTED DIRECT TESTIMONY OF ROGER J. SWENSON ON BEHALF OF US MAGNESIUM, LLC Application of US Magnesium, LLC for Determination of Long-Term Rates, and Terms and Conditions of Interruptible/DSM Electric Service between it and Rocky Mountain Power Docket No. 21-035-53 DIRECT TESTIMONY OF ROGER J. SWENSON ON BEHALF OF US MAGNESIUM, LLC Application of US Magnesium, LLC for Determination of Long-Term Rates, and Terms and Conditions of Interruptible/DSM Electric Service between it and Rocky Mountain Power |
9/21/2021 | Docket No. 21-035-53 US MAGNESIUM, LLC’S MOTION TO DEVIATE FROM ELECTRONIC FILING REQUIREMENT Application of US Magnesium, LLC for Determination of Long-Term Rates, and Terms and Conditions of Interruptible/DSM Electric Service between it and Rocky Mountain Power |
9/21/2021 | Docket No. 21-035-53 APPLICATION OF US MAGNESIUM, LLC FOR DETERMINATION OF LONG-TERM RATES, AND TERMS AND CONDITIONS OF INTERRUPTIBLE/DSM ELECTRIC SERVICE Application of US Magnesium, LLC for Determination of Long-Term Rates, and Terms and Conditions of Interruptible/DSM Electric Service between it and Rocky Mountain Power |
9/21/2021 | Docket No. 21-R008-04 REPLY COMMENTS FROM THE OFFICE OF CONSUMER SERVICES Request for Rulemaking Regarding Utah Universal Service Fund |
9/21/2021 | Docket No. 21-R008-04 REPLY COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Request for Rulemaking Regarding Utah Universal Service Fund |
9/21/2021 | Docket No. 21-035-09 PETITION FOR LEAVE TO INTERVENE OF UTAH CLEAN ENERGY PacifiCorp’s 2021 Integrated Resource Plan |
9/20/2021 | Docket No. 20-035-34 PUBLIC COMMENTS FROM SEPTEMBER 20, 2021 Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/20/2021 | Docket No. 21-035-09 PETITION FOR LEAVE TO INTERVENE OF FERVO ENERGY COMPANY PacifiCorp’s 2021 Integrated Resource Plan |
9/20/2021 | Docket No. 21-035-44 ROCKY MOUNTAIN POWER’S QUARTERLY COMPLIANCE FILING – 2021.Q2 AVOIDED COST INPUT CHANGES Rocky Mountain Power’s 2021 Avoided Cost Input Changes Quarterly Compliance Filing |
9/20/2021 | Docket No. 20-035-34 APPENDIX A, RE: HUNTER HOLMAN, KATE BOWMAN, AND THOMAS KESSINGER FOR UTAH CLEAN ENERGY Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/20/2021 | Docket No. 21-999-01 PACIFICORP’S SERVICE AGREEMENT 1029 WITH UTAH ASSOCIATED MUNICIPAL POWER SYSTEMS REGARDING SELF-SUPPLY OF ANCILLARY SERVICE SCHEDULES 5 AND 6 – FERC DOCKET NO. ER21-2909-000 Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 |
9/17/2021 | Docket No. 20-035-34 APPENDIX A, RE: SOPHIE HAYES, CALLIE HOOD, DEBORAH KAPILOFF, AND AARON KRESSIG FOR WESTERN RESOURCE ADVOCATES Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/17/2021 | Docket No. 21-999-07 FRONTIER COMMUNICATIONS HOLDINGS, LLC’S 2021 CAF ICC FILING 2021 Universal Service Fund (USF) CAF Review |
9/17/2021 | Docket No. 21-049-09 FORMAL COMPLAINT Formal Complaint of John W. Holt and Karen Holt Bennion against CenturyLink |
9/16/2021 | Docket No. 21-999-03 VESTA SOLUTIONS, INC.’S NOTICE OF SERVICE DISRUPTION TO 911 CALL DELIVERY AND OR AUTOMATIC LOCATION IDENTIFICATION Miscellaneous Correspondence and Reports Regarding Telecommunications Utility Services; 2021 |
9/16/2021 | Docket No. 21-057-01 DOMINION ENERGY UTAH’S PETITION FOR HIGHLY CONFIDENTIAL TREATMENT AND ADDITIONAL PROTECTIVE MEASURES UNDER UTAH ADMINISTRATIVE CODE RULE R746-1-601(2)(A) Dominion Energy Utah’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2021 to May 31, 2022 |
9/16/2021 | Docket No. 21-057-01 DOMINION ENERGY UTAH’S FIVE-YEAR FORWARD CURVE REPORT Dominion Energy Utah’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2021 to May 31, 2022 |
9/16/2021 | Docket No. 21-035-T11 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Rocky Mountain Power’s Proposed Tariff Revisions to Electric Service Schedule No. 196, Sustainable Transportation and Energy Plan (STEP) Cost Rocky Mountain Power’s Proposed Tariff Revisions to Electric Service Schedule No. 196, Sustainable Transportation and Energy Plan (STEP) Cost Adjustment Pilot Program |
9/16/2021 | Docket No. 21-057-12 TECHNICAL CONFERENCE PRESENTATION FOR SEPTEMBER 16, 2021 Application of Dominion Energy Utah to Extend Service to Green River, Utah |
9/15/2021 | Docket No. 21-035-09 PACIFICORP’S ERRATA TO THE 2021 INTEGRATED RESOURCE PLAN PacifiCorp’s 2021 Integrated Resource Plan [CONTAINS CONFIDENTIAL ATTACHMENTS] |
9/15/2021 | Docket No. 21-035-T10 COMMENTS FROM THE OFFICE OF CONSUMER SERVICES Application of Rocky Mountain Power for Approval of Billing for Other Entities Tariff, Electric Service Schedule No. 299 |
9/15/2021 | Docket No. 21-035-T10 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Application of Rocky Mountain Power for Approval of Billing for Other Entities Tariff, Electric Service Schedule No. 299 |
9/14/2021 | Docket No. 20-2548-01 NOTICE OF CONSUMMATION Joint Application of Red Fiber Parent LLC, Cincinnati Bell Inc., and CBTS Technology Solutions LLC for Approval of a Transfer of Indirect Control of CBTS Technology Solutions LLC to Red Fiber Parent LLC |
9/14/2021 | Docket No. 21-057-01 DOMINION ENERGY UTAH’S SUBMISSION OF SUPPLEMENTAL INFORMATION Dominion Energy Utah’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2021 to May 31, 2022 |
9/14/2021 | Docket No. 21-030-01 2021 MOON LAKE ELECTRIC ASSOCIATION’S WILDLAND FIRE PROTECTION PLAN COMPLIANCE REPORT Moon Lake Electric Association’s Wildland Fire Protection Plan |
9/13/2021 | Docket No. 21-035-10 REDACTED COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES PacifiCorp’s Semi-Annual Hedging Report Docket No. 21-035-10 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES PacifiCorp’s Semi-Annual Hedging Report |
9/13/2021 | Docket No. 21-035-16 ENTRY OF APPEARANCE OF COUNSEL ON BEHALF OF CHARGEPOINT, INC. Collaborative Stakeholder Process for Rocky Mountain Power’s Grid Modernization and Rate Design |
9/13/2021 | Docket No. 21-035-16 MOTION TO INTERVENE OF CHARGEPOINT, INC. Collaborative Stakeholder Process for Rocky Mountain Power’s Grid Modernization and Rate Design |
9/13/2021 | Docket No. 21-057-14 SETTLEMENT STIPULATION Application of Dominion Energy Utah for a Subscription-Based Carbon Offset Program |
9/13/2021 | Docket No. 21-2631-01 COMMENTS FROM EARTHGRID PBC Application of EarthGrid PBC for a Certificate of Public Convenience and Necessity to Provide Resold and Facilities-Based Public Telecommunications Services within the State of Utah |
9/10/2021 | Docket No. 21-2204-P06 PRICE LIST CenturyLink Communications, LLC d/b/a Lumen Technologies Group – Interexchange Telecommunications Service – This filing introduces Simply Unlimited Phone for Residence, an optional enrollment plan available to residential customers. |
9/10/2021 | Docket No. 20-035-34 ROCKY MOUNTAIN POWER’S CONSOLIDATED REPLY IN SUPPORT OF MOTION FOR PROTECTIVE ORDER Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/10/2021 | Docket No. 21-049-P05 PRICE LIST Qwest Corporation d/b/a CenturyLink, QC – Exchange and Network Services Price List – This filing introduces Simply Unlimited Phone for Residence, an optional enrollment plan available to residential customers. |
9/10/2021 | Docket No. 21-2631-01 CORRECTED COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Application of EarthGrid PBC for a Certificate of Public Convenience and Necessity to Provide Resold and Facilities-Based Public Telecommunications Services within the State of Utah |
9/10/2021 | Docket Nos. 21-035-T09 and 20-035-20 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Rocky Mountain Power’s Proposed Revisions to Electric Service Schedule No. 3, Low Income Lifeline Program – Residential Service Option for Qualifying Customers and Electric Service Schedule No. 91, Surcharge to Fund Low Income Residential Lifeline Program AND Low Income Lifeline Program Reports 2020 |
9/10/2021 | Docket No. 21-2631-01 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Application of EarthGrid PBC for a Certificate of Public Convenience and Necessity to Provide Resold and Facilities-Based Public Telecommunications Services within the State of Utah |
9/10/2021 | Docket No. 21-2619-02 PETITION OF E FIBER SAN JUAN, LLC FOR DECLARATORY RULING OR, IN THE ALTERNATIVE, PETITION FOR DESIGNATION AS AN ELIGIBLE TELECOMMUNICATIONS CARRIER IN THE STATE OF UTAH FOR THE PURPOSE OF RECEIVING RURAL DIGITAL OPPORTUNITY FUND AND LIFELINE SUPPORT IN TRIBAL AREAS Petition of E Fiber San Juan, LLC for Declaratory Ruling or in the Alternative Petition for Designation as an Eligible Telecommunications Carrier on Tribal Locations in the State of Utah for the Purpose of Receiving Rural Digital Opportunity Fund and Lifeline Support |
9/9/2021 | Docket No. 21-999-14 CORRESPONDENCE FROM TAYLORSVILLE-BENNION IMPROVEMENT DISTRICT Request of Landmark Installations for Arbitration |
9/9/2021 | Docket No. 21-057-01 DOMINION ENERGY UTAH’S MOTION TO AMEND THE SCHEDULING ORDER Dominion Energy Utah’s Integrated Resource Plan (IRP) for Plan Year: June 1, 2021 to May 31, 2022 |
9/9/2021 | Docket No. 21-2597-01 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Assist Wireless, LLC’s Notice of withdrawal of its Eligible Telecommunications Carrier Designation |
9/9/2021 | Docket No. 21-035-14 UNOPPOSED MOTION TO AMEND THE SCHEDULING ORDER AND FOR EXPEDITED TREATMENT Application of Rocky Mountain Power to Establish a Balancing Account for Pension Settlement Adjustments |
9/9/2021 | Docket No. 21-035-09 INTERWEST ENERGY ALLIANCE’S MOTION FOR PERMISSION TO BE REPRESENTED BY OUT-OF-STATE ATTORNEY PacifiCorp’s 2021 Integrated Resource Plan |
9/9/2021 | Docket No. 21-035-09 INTERWEST ENERGY ALLIANCE’S PETITION TO INTERVENE PacifiCorp’s 2021 Integrated Resource Plan |
9/9/2021 | Docket No. 21-035-52 INTERWEST ENERGY ALLIANCE’S MOTION FOR PERMISSION TO BE REPRESENTED BY OUT-OF-STATE ATTORNEY Application of Rocky Mountain Power for Approval of Solicitation Process for 2022 All Source Request for Proposals |
9/9/2021 | Docket No. 21-035-52 INTERWEST ENERGY ALLIANCE’S PETITION TO INTERVENE Application of Rocky Mountain Power for Approval of Solicitation Process for 2022 All Source Request for Proposals |
9/8/2021 | Docket No. 21-035-46 UTAH CLEAN ENERGY’S COMMENTS Rocky Mountain Power’s 2021 Net Metering and Interconnection Report |
9/8/2021 | Docket No. 21-999-01 REDACTED PACIFICORP’S NOTICE OF AFFILIATE TRANSACTION WITH BHE WIND, LLC Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 Docket No. 21-999-01 PACIFICORP’S NOTICE OF AFFILIATE TRANSACTION WITH BHE WIND, LLC Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 |
9/8/2021 | Docket No. 21-035-46 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Rocky Mountain Power’s 2021 Net Metering and Interconnection Report |
9/8/2021 | Docket No. 21-035-14 REPORTER’S TRANSCRIPT, RE: AUGUST 23, 2021 Application of Rocky Mountain Power to Establish a Balancing Account for Pension Settlement Adjustments |
9/7/2021 | Docket No. 21-035-42 APPENDIX A, RE: COURTNEY HIGGINS FOR THE UTAH ASSOCIATION OF ENERGY USERS Rocky Mountain Power’s Application for Alternative Cost Recovery for Major Plant Additions of the Pryor Mountain and TB Flats Wind Projects |
9/7/2021 | Docket No. 20-035-34 PETITION TO INTERVENE OF THE UTAH ASSOCIATION OF ENERGY USERS Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/7/2021 | Docket No. 20-035-34 APPENDIX A, RE: HUNTER HOLMAN, KATE BOWMAN, SARAH WRIGHT, AND THOMAS KESSINGER FOR UTAH CLEAN ENERGY Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/7/2021 | Docket No. 20-035-34 PETITION FOR LEAVE TO INTERVENE AND UTAH CLEAN ENERGY’S RESPONSE TO ROCKY MOUNTAIN POWER’S MOTION FOR A PROTECTIVE ORDER Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/7/2021 | Docket No. 20-035-34 RESPONSE OF WESTERN RESOURCE ADVOCATES TO MOTION FOR PROTECTIVE ORDER Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/7/2021 | Docket No. 20-035-34 RESPONSE TO MOTION FOR PROTECTIVE ORDER OF CHARGEPOINT, INC. Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/7/2021 | Docket No. 21-999-01 PACIFICORP’S NOTICE OF TERMINATION OF RATE SCHEDULE NO. 727, CONSTRUCTION AGREEMENT WITH LEHI CITY, UT – FERC DOCKET NO. ER-21-2842-000 Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 |
9/3/2021 | Docket No. 21-999-13 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Annual 47 CFR § 54.314 Certification of Eligible Telecommunications Carriers to the Federal Communications Commission and the Universal Service Administrative Company |
9/2/2021 | Docket Nos. 21-035-T11 and 16-035-36 TARIFF Rocky Mountain Power’s Proposed Tariff Revisions to Electric Service Schedule No. 196, Sustainable Transportation and Energy Plan (STEP) Cost Adjustment Pilot Program AND Application of Rocky Mountain Power to Implement Programs Authorized by the Sustainable Transportation and Energy Plan Act |
9/2/2021 | Docket No. 21-999-01 REDACTED PACIFICORP’S NOTICE OF AFFILIATE TRANSACTION WITH PENN MACHINE COMPANY LLC Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 Docket No. 21-999-01 PACIFICORP’S NOTICE OF AFFILIATE TRANSACTION WITH PENN MACHINE COMPANY LLC Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2021 |
9/2/2021 | Docket No. 20-035-34 APPENDIX A, RE: SOPHIE HAYES, CALLIE HOOD, DEBORAH KAPILOFF, AND AARON KRESSIG FOR WESTERN RESOURCE ADVOCATES Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/2/2021 | Docket No. 20-035-34 PETITION FOR LEAVE TO INTERVENE OF WESTERN RESOURCE ADVOCATES Application of Rocky Mountain Power for Approval of Electrical Vehicle Infrastructure Program |
9/2/2021 | Docket No. 20-035-05 REDACTED SHORTLIST REPORT OF THE INDEPENDENT EVALUATOR, MERRIMACK ENERGY GROUP, INC. Application of Rocky Mountain Power for Approval of Solicitation Process for 2020 All Source Request for Proposals Docket No. 20-035-05 SHORTLIST REPORT OF THE INDEPENDENT EVALUATOR, MERRIMACK ENERGY GROUP, INC. Application of Rocky Mountain Power for Approval of Solicitation Process for 2020 All Source Request for Proposals [CONTAINS HIGHLY CONFIDENTIAL APPENDICES] |
9/1/2021 | Docket No. 21-035-09 PACIFICORP’S 2021 INTEGRATED RESOURCE PLAN PacifiCorp’s 2021 Integrated Resource Plan |
9/1/2021 | Docket No. 21-2589-01 COMMENTS FROM THE DIVISION OF PUBLIC UTILITIES Mobilitie Management, LLC’s Request to Cancel Certificate of Public Convenience and Necessity and to Withdraw Tariffs |
9/1/2021 | Docket No. 21-R008-03 REPLY COMMENTS OF THE UTAH RURAL TELECOM ASSOCIATION Administration of Utah Universal Service Fund Distributions to Carriers of Last Resort with Overlapping Telecommunications Service Exchanges |
9/1/2021 | Docket No. 21-R008-03 REPLY COMMENTS FROM THE OFFICE OF CONSUMER SERVICES Administration of Utah Universal Service Fund Distributions to Carriers of Last Resort with Overlapping Telecommunications Service Exchanges |
9/1/2021 | Docket No. 21-999-14 ADDITIONAL MATERIAL FROM LANDMARK INSTALLATIONS Request of Landmark Installations for Arbitration |