Electric 2023
Orders and Notices
These orders and notices are stored in PDF format. They are listed by the month issued, docket number, and name of the order or notice issued by the Public Service Commission of Utah.
December | |
---|---|
12/22/2023 | Docket No. 21-035-52 — Order Granting Intervention of Utah Clean Energy – Rocky Mountain Power – Application for Approval of a Solicitation Process for 2020 All Source Request for Proposals |
12/12/2023 | Docket No. 23-035-41 — Order Granting Motion to Dismiss Complaint – Rocky Mountain Power – Formal Complaint of Ian McCubbin, David Goldsmith, Tim Watcke, Laurie Hoffman, and David Classen |
12/13/2023 | Docket No. 23-035-45 — Order Approving Amendments to Qualifying Facility Power Purchase Agreements – Rocky Mountain Power – Application for Approval of an Amendment to the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC – Smelter |
12/13/2023 | Docket No. 23-035-46 — Order Approving Amendments to Qualifying Facility Power Purchase Agreements – Rocky Mountain Power – Application for Approval of an Amendment to the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC – Refinery |
12/13/2023 | Docket No. 23-035-47 — Order Approving Amendment to Qualifying Facility Power Purchase Agreement – Rocky Mountain Power – Application for Approval of an Amendment of a Power Purchase Agreement between PacifiCorp and Tesoro Refining & Marketing Company LLC |
12/21/2023 | Docket No. 23-035-56 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Blanding, Utah |
12/21/2023 | Docket No. 23-2508-T01 — Order Granting Request – Ticaboo Utility Improvement District – Revisions to Tariff No. 1 |
12/14/2023 | Docket No. 23-R312-01 — Notice of Virtual Scheduling Conference – Investigation into Possible Amendment of Utah Admin. Code R746-312, Electrical Interconnection |
November | |
11/21/2023 | Docket No. 21-035-52 — Order to Preserve Records – Rocky Mountain Power – Application for Approval of a Solicitation Process for 2020 All Source Request for Proposals |
11/27/2023 | Docket No. 23-035-23 — Order Canceling Limited Hearing and Directing Rocky Mountain Power to File Report – Rocky Mountain Power – Formal Complaint of Glenn Mickelson |
11/8/2023 | Docket No. 23-035-27 — Order – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
11/3/2023 | Docket No. 23-035-31 — Notice of Filing and Comment Period – Rocky Mountain Power – Semi-Annual Demand-Side Management Forecast Reports |
11/21/2023 | Docket No. 23-035-44 — Order Granting Motion to Vacate Scheduling Order – Rocky Mountain Power – 2023 Wildland Fire Protection Plan |
11/13/2023 | Docket No. 23-035-49 — Notice of Filing and Comment Period – Rocky Mountain Power – Request for Approval of its 2024 Strategic Communications and Outreach Action Plan and Budget for Demand Side Management |
11/14/2023 | Docket No. 23-035-50 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Monroe, Utah |
11/14/2023 | Docket No. 23-035-51 — Notice of Virtual Scheduling Conference – Rocky Mountain Power – Application of Kennecott Utah Copper, LLC for an Order Determining the Rates, Terms, and Conditions of Electric Service by Rocky Mountain Power to Kennecott |
11/24/2023 | Docket No. 23-035-51 — Scheduling Order and Notice of Hearing – Rocky Mountain Power – Application of Kennecott Utah Copper, LLC for an Order Determining the Rates, Terms, and Conditions of Electric Service by Rocky Mountain Power to Kennecott |
11/16/2023 | Docket No. 23-035-52 — Notice of Filing and Comment Period – Rocky Mountain Power – Formal Complaint of Andrea Reich-Armbruster |
11/20/2023 | Docket No. 23-035-53 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Blanding, Utah |
11/29/2023 | Docket No. 23-035-54 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Monroe, Utah |
11/16/2023 | Docket No. 23-035-T11 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Changes to Electric Service Schedule No. 114, Load Management Program |
11/16/2023 | Docket No. 23-999-01 — Public Notice Re: Rocky Mountain Power’s Update on Cybersecurity – Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2023 |
October | |
10/23/2023 | Docket No. 23-035-10 — Order Granting Intervention of Utah Citizens Advocating Renewable Energy – PacifiCorp – 2023 Integrated Resource Plan |
10/16/2023 | Docket No. 23-035-17 — Notice of Filing and Comment Period – Rocky Mountain Power – 2022 Annual Report of the Blue Sky Program |
10/4/2023 | Docket No. 23-035-27 — Order Granting Motion for Witness to Appear Remotely – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
10/3/2023 | Docket No. 23-035-33 — Order Dismissing Complaint – Rocky Mountain Power – Formal Complaint of Douglas F. and Colleen C. Higham |
10/5/2023 | Docket No. 23-035-40 — Order Granting Intervention of the Utah Association of Energy Users – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Insurance Costs |
10/5/2023 | Docket No. 23-035-44 — Scheduling Order – Rocky Mountain Power – 2023 Wildland Fire Protection Plan |
10/12/2023 | Docket No. 23-035-45 — Scheduling Order and Notice of Virtual Hearing – Rocky Mountain Power – Application for Approval of an Amendment to the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC – Smelter |
10/12/2023 | Docket No. 23-035-46 — Scheduling Order and Notice of Virtual Hearing – Rocky Mountain Power – Application for Approval of an Amendment to the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC – Refinery |
10/12/2023 | Docket No. 23-035-47 — Scheduling Order and Notice of Virtual Hearing – Rocky Mountain Power – Application for Approval of an Amendment of a Power Purchase Agreement between PacifiCorp and Tesoro Refining & Marketing Company LLC |
10/16/2023 | Docket No. 23-035-48 — Notice of Filing and Comment Period – Rocky Mountain Power – Formal Complaint of Kevin House |
10/17/2023 | Docket No. 23-035-T10 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Changes to Electric Service Schedule No. 140, Non-Residential Energy Efficiency Program |
September | |
9/8/2023 | Docket No. 17-035-40 — Order – Rocky Mountain Power – Application for Approval of a Significant Energy Resource Decision and Voluntary Request for Approval of Resource Decision |
9/1/2023 | Docket No. 19-999-01 — Notice of Technical Conference – Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2019 |
9/29/2023 | Docket No. 23-035-23 — Order Suspending Order Dismissing Complaint and Notice of Limited Hearing – Rocky Mountain Power – Formal Complaint of Glenn Mickelson |
9/20/2023 | Docket No. 23-035-27 — Order Granting Motion for Leave to File Supplemental Comments – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
9/21/2023 | Docket No. 23-035-27 — Request for Comments – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
9/29/2023 | Docket No. 23-035-27 — Amended Notice of Hearing – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
9/15/2023 | Docket No. 23-035-30 — Notice – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Wildfire Claims |
9/13/2023 | Docket No. 23-035-40 — Scheduling Order and Notice of Hearing – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Insurance Costs |
9/13/2023 | Docket No. 23-035-40 — Erratum Scheduling Order and Notice of Hearing – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Insurance Costs |
9/8/2023 | Docket No. 23-035-41 — Notice of Filing and Comment Period – Rocky Mountain Power – Formal Complaint of Ian McCubbin, David Goldsmith, Tim Watcke, Laurie Hoffman, and David Classen |
9/7/2023 | Docket No. 23-035-42 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Blanding, Utah |
9/7/2023 | Docket No. 23-035-43 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Blanding, Utah |
9/26/2023 | Docket No. 23-035-44 — Notices of Filing and Virtual Scheduling Conference – Rocky Mountain Power – 2023 Wildland Fire Protection Plan |
9/28/2023 | Docket No. 23-035-45 — Notice of Virtual Consolidated Scheduling Conference – Rocky Mountain Power – Application for Approval of an Amendment to the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC – Smelter |
9/28/2023 | Docket No. 23-035-46 — Notice of Virtual Consolidated Scheduling Conference – Rocky Mountain Power – Application for Approval of an Amendment to the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC – Refinery |
9/29/2023 | Docket No. 23-035-47 — Notice of Virtual Scheduling Conference – Rocky Mountain Power – Application for Approval of an Amendment of a Power Purchase Agreement between PacifiCorp and Tesoro Refining & Marketing Company LLC |
9/8/2023 | Docket No. 23-R312-01 — Notice and Request for Comments – Investigation into Possible Amendment of Utah Admin. Code R746-312, Electrical Interconnection |
August | |
8/4/2023 | Docket No. 22-506-03 — Erratum Report and Order – Deseret Generation and Transmission Co-Operative – Application for a Certificate of Public Convenience and Necessity Authorizing the Acquisition of Electric Utility Plant and Equipment |
8/18/2023 | Docket No. 23-035-06 — Notice of Filing and Comment Period – PacifiCorp – Semi-Annual Hedging Report |
8/31/2023 | Docket No. 23-035-15 — Order Setting Final Rates – Rocky Mountain Power – Application for Authority to Revise Tariff Schedule 98, Renewable Energy Credits Balancing Account |
8/17/2023 | Docket No. 23-035-23 — Order Dismissing Complaint – Rocky Mountain Power – Formal Complaint of Glenn Mickelson |
8/3/2023 | Docket No. 23-035-30 — Order Granting Intervention of the Utah Association of Energy Users – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Wildfire Claims |
8/7/2023 | Docket No. 23-035-34 — Notice Regarding Deadline to File a Response – Rocky Mountain Power – Request for a Technical Conference |
8/10/2023 | Docket No. 23-035-34 — Amended Notice of Closed Technical Conference – Rocky Mountain Power – Request for a Technical Conference |
8/25/2023 | Docket No. 23-035-34 — Order Granting Intervention of the Utah Association of Energy Users – Rocky Mountain Power – Request for a Technical Conference |
8/14/2023 | Docket No. 23-035-37 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Oak City, Utah |
8/14/2023 | Docket No. 23-035-38 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Oak City, Utah |
8/14/2023 | Docket No. 23-035-39 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Oak City, Utah |
8/24/2023 | Docket No. 23-035-40 — Notice of Virtual Scheduling Conference – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Insurance Costs |
8/18/2023 | Docket No. 23-035-T08 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Changes to Electric Service Regulation No. 12, Line Extensions |
8/25/2023 | Docket No. 23-035-T09 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Changes to Electric Service Schedule Nos. 7, Security Area Lighting and 11, Street Lighting — Company-Owned System |
8/11/2023 | Docket No. 23-999-09 — Notice of Intention to File Proposed Rule – Proposed Rulemaking Regarding Utah Code Title 54, Chapter 25, Electrical Power Delivery Quality Act |
July | |
7/11/2023 | Docket No. 16-035-27 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of a Renewable Energy Services Contract between Rocky Mountain Power and Facebook, Inc. Pursuant to Tariff Electric Service Schedule 34 |
7/28/2023 | Docket No. 21-035-16 — Notice of Filing and Comment Period – Rocky Mountain Power – Collaborative Stakeholder Process for Grid Modernization and Rate Design |
7/10/2023 | Docket No. 22-035-39 — Notice of Filing, Comment Period, and Request Rocky Mountain Power Submit Comments – Rocky Mountain Power – Low Income Lifeline Program Reports 2022 |
7/6/2023 | Docket No. 23-035-10 — Order Granting Intervention of Fervo Energy Company – PacifiCorp – 2023 Integrated Resource Plan |
7/27/2023 | Docket No. 23-035-20 — Order Approving Extension of the 2020 Protocol – Rocky Mountain Power – Application for an Extension to the 2020 Inter-Jurisdictional Cost Allocation Agreement |
7/12/2023 | Docket No. 23-035-27 — Scheduling Order and Notice of Hearing – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
7/17/2023 | Docket No. 23-035-30 — Scheduling Order – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Wildfire Claims |
7/6/2023 | Docket No. 23-035-31 — Notice of Filing and Comment Period – Rocky Mountain Power – Semi-Annual Demand-Side Management Forecast Reports |
7/6/2023 | Docket No. 23-035-32 — Notice of Filing and Comment Period – Rocky Mountain Power – 2023 Net Metering and Interconnection Report |
7/13/2023 | Docket No. 23-035-33 — Notice of Filing and Comment Period – Rocky Mountain Power – Formal Complaint of Douglas F. and Colleen C. Higham |
7/26/2023 | Docket No. 23-035-34 — Notice of Closed Technical Conference – Rocky Mountain Power – Request for a Technical Conference |
7/12/2023 | Docket No. 23-506-01 — Order – Deseret Generation and Transmission Co-Operative – Application for a Certificate of Public Convenience and Necessity Authorizing the Acquisition of Electric Utility Plant and Equipment |
June | |
6/26/2023 | Docket No. 17-035-40 — Amended Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of a Significant Energy Resource Decision and Voluntary Request for Approval of Resource Decision |
6/2/2023 | Docket No. 23-022-02 — Notice of Filing and Comment Period – Bridger Valley Electric Association – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/29/2023 | Docket No. 23-022-02 — Order – Bridger Valley Electric Association – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/2/2023 | Docket No. 23-028-01 — Notice of Filing and Comment Period – Garkane Energy Cooperative, Inc. – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/29/2023 | Docket No. 23-028-01 — Order – Garkane Energy Cooperative, Inc. – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/2/2023 | Docket No. 23-030-01 — Notice of Filing and Comment Period – Moon Lake Electric Association, Inc. – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/29/2023 | Docket No. 23-030-01 — Order – Moon Lake Electric Association, Inc. – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/2/2023 | Docket No. 23-031-01 — Notice of Filing and Comment Period – Mt. Wheeler Power, Inc. – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/29/2023 | Docket No. 23-031-01 — Order – Mt. Wheeler Power, Inc. – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/5/2023 | Docket No. 23-035-01 — Order Granting Intervention of the Utah Association of Energy Users – Rocky Mountain Power – Application for Approval of the 2023 Energy Balancing Account |
6/29/2023 | Docket No. 23-035-01 — Order Approving Interim Rates – Rocky Mountain Power – Application for Approval of the 2023 Energy Balancing Account |
6/7/2023 | Docket No. 23-035-10 — Notices of Filing and Virtual Scheduling Conference – PacifiCorp – 2023 Integrated Resource Plan |
6/27/2023 | Docket No. 23-035-10 — Scheduling Order and Notice of Technical Conference – PacifiCorp – 2023 Integrated Resource Plan |
6/5/2023 | Docket No. 23-035-26 — Notice of Filing and Comment Period – Rocky Mountain Power – Demand-Side Management 2022 Annual Energy Efficiency and Peak Load Reduction Report |
6/5/2023 | Docket No. 23-035-27 — Notice of Filing and Comment Period – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
6/23/2023 | Docket No. 23-035-27 — Notice Regarding Deadline to File a Response – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
6/30/2023 | Docket No. 23-035-27 — Order Granting Motion and Notice of Scheduling Conference – Rocky Mountain Power – 2023 Wildland Fire Cost and Compliance Report |
6/23/2023 | Docket No. 23-035-30 — Notice of Virtual Scheduling Conference – Rocky Mountain Power – Application for a Deferred Accounting Order Regarding Wildfire Claims |
6/2/2023 | Docket No. 23-066-02 — Notice of Filing and Comment Period – Dixie Power – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/29/2023 | Docket No. 23-066-02 — Order – Dixie Power – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/2/2023 | Docket No. 23-506-01 — Notice of Filing and Comment Period – Deseret Generation and Transmission Co-Operative – Application for a Certificate of Public Convenience and Necessity Authorizing the Acquisition of Electric Utility Plant and Equipment |
6/2/2023 | Docket No. 23-506-02 — Notice of Filing and Comment Period – Deseret Generation and Transmission Co-Operative – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
6/29/2023 | Docket No. 23-506-02 — Order – Deseret Generation and Transmission Co-Operative – Application for Authority to Issue Securities Related to Acquisition of Bonanza Recip 1 |
May | |
5/25/2023 | Docket No. 17-035-40 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of a Significant Energy Resource Decision and Voluntary Request for Approval of Resource Decision |
5/9/2023 | Docket No. 21-035-70 — Public Notice – Rocky Mountain Power – Evaluation of Electric Vehicle Time of Use Pilot Program |
5/3/2023 | Docket No. 23-035-01 — Notice of Virtual Scheduling Conference – Rocky Mountain Power – Application for Approval of the 2023 Energy Balancing Account |
5/11/2023 | Docket No. 23-035-01 — Scheduling Order and Notice of Hearings – Rocky Mountain Power – Application for Approval of the 2023 Energy Balancing Account |
5/31/2023 | Docket No. 23-035-03 — Order – Rocky Mountain Power – Formal Complaint of Cindy L. Thompson |
5/8/2023 | Docket No. 23-035-10 — Order Granting Intervention of the Interwest Energy Alliance – PacifiCorp – 2023 Integrated Resource Plan |
5/8/2023 | Docket No. 23-035-10 — Order Granting Intervention of Western Resource Advocates – PacifiCorp – 2023 Integrated Resource Plan |
5/30/2023 | Docket No. 23-035-15 — Order – Rocky Mountain Power – Application for Authority to Revise Tariff Schedule 98, Renewable Energy Credits Balancing Account |
5/2/2023 | Docket No. 23-035-21 — Notice of Filing and Comment Period – Rocky Mountain Power – Service Quality Review Report |
5/19/2023 | Docket No. 23-035-23 — Notice of Filing and Comment Period – Rocky Mountain Power – Formal Complaint of Glenn Mickelson |
5/23/2023 | Docket No. 23-035-24 — Notice of Filing and Comment Period – Rocky Mountain Power – Solar Photovoltaic Incentive Program (Schedule 107) 2023 Annual Report |
5/2/2023 | Docket No. 23-035-T06 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Revisions to Electric Service Schedule No. 37, Avoided Cost Purchases from Qualifying Facilities |
5/17/2023 | Docket No. 23-035-T07 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Revisions to Electric Service Schedule No. 135, Net Metering Service |
April | |
4/26/2023 | Docket No. 23-035-03 — Notice – Rocky Mountain Power – Formal Complaint of Cindy L. Thompson |
4/3/2023 | Docket No. 23-035-10 — Notice of Filing and Clarification of Comment Period – PacifiCorp – 2023 Integrated Resource Plan |
4/27/2023 | Docket No. 23-035-10 — Order Granting Intervention of Utah Clean Energy – PacifiCorp – 2023 Integrated Resource Plan |
4/28/2023 | Docket No. 23-035-10 — Order Granting Intervention of Sierra Club – PacifiCorp – 2023 Integrated Resource Plan |
4/28/2023 | Docket No. 23-035-10 — Order Granting Intervention of the Utah Association of Energy Users – PacifiCorp – 2023 Integrated Resource Plan |
4/27/2023 | Docket No. 23-035-15 — Order Granting Intervention of the Utah Association of Energy Users – Rocky Mountain Power – Application for Authority to Revise Tariff Schedule 98, Renewable Energy Credits Balancing Account |
4/5/2023 | Docket No. 23-035-18 — Notice of Filing and Comment Period – Rocky Mountain Power – Annual Report of Electric Vehicle Infrastructure Program |
4/12/2023 | Docket No. 23-035-19 — Notice of Filing and Comment Period – Rocky Mountain Power – Request for Major Event Exclusion for the Snowstorm in the Salt Lake City Metro and Jordan Valley Areas of Utah on March 10-11, 2023 |
4/13/2023 | Docket No. 23-035-20 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for an Extension to the 2020 Inter-Jurisdictional Cost Allocation Agreement |
4/3/2023 | Docket No. 23-999-01 — Notice of Technical Conference – Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2023 |
March | |
3/21/2023 | Docket No. 23-035-03 — Order Extending Time to File Reply – Rocky Mountain Power – Formal Complaint of Cindy L. Thompson |
3/2/2023 | Docket No. 23-035-08 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Manti, Utah |
3/2/2023 | Docket No. 23-035-09 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Manti, Utah |
3/3/2023 | Docket No. 23-035-10 — Notice and Request for Comments – PacifiCorp – 2023 Integrated Resource Plan |
3/28/2023 | Docket No. 23-035-10 — Order Granting Request for Extension to File – PacifiCorp – 2023 Integrated Resource Plan |
3/6/2023 | Docket No. 23-035-11 — Notices of Filing, Virtual Technical Conference, and Comment Period – Rocky Mountain Power – Application for Waiver of the Solicitation Process and Waiver of the Requirement for Preapproval of Significant Energy Resource Decision |
3/23/2023 | Docket No. 23-035-11 — Order – Rocky Mountain Power – Application for Waiver of the Solicitation Process and Waiver of the Requirement for Preapproval of Significant Energy Resource Decision |
3/7/2023 | Docket No. 23-035-13 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Blanding, Utah |
3/30/2023 | Docket No. 23-035-14 — Notice of Filing and Comment Period – Rocky Mountain Power – Division of Public Utilities’ Audit of PacifiCorp’s 2022 Fuel Inventory Policies and Procedures |
3/17/2023 | Docket No. 23-035-15 — Notice of Virtual Scheduling Conference – Rocky Mountain Power – Application for Authority to Revise Tariff Schedule 98, Renewable Energy Credits Balancing Account |
3/27/2023 | Docket No. 23-035-15 — Scheduling Order and Notice of Hearing on Interim Rates – Rocky Mountain Power – Application for Authority to Revise Tariff Schedule 98, Renewable Energy Credits Balancing Account |
3/28/2023 | Docket No. 23-035-16 — Notice of Filing and Comment Period – Rocky Mountain Power – 2022 Annual Report of the Subscriber Solar Program |
3/30/2023 | Docket No. 23-035-17 — Notice of Filing and Comment Period – Rocky Mountain Power – 2022 Annual Report of the Blue Sky Program |
3/13/2023 | Docket No. 23-035-T05 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Revisions to Electric Service Schedule No. 3, Low Income Lifeline Program Residential Service Optional for Qualifying Customers |
3/17/2023 | Docket No. 23-999-09 — Notice – Proposed Rulemaking Regarding Utah Code Title 54, Chapter 25, Electrical Power Delivery Quality Act |
February | |
2/1/2023 | Docket No. 22-035-54 — Notice of Filing and Comment Period – Rocky Mountain Power – Notice of Intent to Use Export Credit Rate Input |
2/14/2023 | Docket No. 23-035-04 — Notice of Filing and Comment Period – Rocky Mountain Power – Request for Major Event Exclusion for the Snowstorm in the Salt Lake City Metro, Richfield, and Jordan Valley Areas of Utah on January 1-3, 2023 |
2/17/2023 | Docket No. 23-035-05 — Notice of Filing and Comment Period – Rocky Mountain Power – Power Quality Report for the Period of January through December 2022 |
2/17/2023 | Docket No. 23-035-06 — Notice of Filing and Comment Period – PacifiCorp – Semi-Annual Hedging Report |
2/22/2023 | Docket No. 23-035-07 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Ephraim, Utah |
2/23/2023 | Docket No. 23-035-T02 — Order – Rocky Mountain Power – Proposed Tariff Revisions to Electric Service Schedule No. 300, Regulation Charges |
2/1/2023 | Docket No. 23-035-T03 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Changes to Electric Service Schedule No. 137, Net Billing Service |
2/6/2023 | Docket No. 23-035-T04 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Changes to Electric Service Schedule No. 111, Residential Energy Efficiency Program |
January | |
1/10/2023 | Docket No. 09-035-15 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Proposed Energy Cost Adjustment Mechanism |
1/5/2023 | Docket No. 22-028-04 — Amended Notice of Filing and Comment Period – Garkane Energy Cooperative, Inc. – Application for Authority to Issue Securities in the Form of a Loan Agreement and Secured Promissory Note |
1/20/2023 | Docket No. 22-028-04 — Order – Garkane Energy Cooperative, Inc. – Application for Authority to Issue Securities in the Form of a Loan Agreement and Secured Promissory Note |
1/9/2023 | Docket No. 22-035-01 — Order – Rocky Mountain Power – Application for Approval of the 2022 Energy Balancing Account |
1/13/2023 | Docket No. 22-035-52 — Order Approving Amendment to Qualifying Facility Power Purchase Agreement – Rocky Mountain Power – Application for Approval of an Amendment of a Power Purchase Agreement between PacifiCorp and Tesoro Refining & Marketing Company LLC |
1/11/2023 | Docket No. 22-035-53 — Order – Rocky Mountain Power – Request for Approval of its 2023 Strategic Communications and Outreach Action Plan and Budget for Demand Side Management |
1/27/2023 | Docket No. 22-035-T13 — Order – Rocky Mountain Power – Proposed Changes to Schedule 140, Non-Residential Energy Efficiency Program |
1/19/2023 | Docket No. 22-2508-01 — Order – Ticaboo Utility Improvement District – Formal Complaint of Ticaboo Management, LLC dba North Lake Powell against Ticaboo Utility Improvement District |
1/24/2023 | Docket No. 23-035-02 — Notice of Filing and Comment Period – Rocky Mountain Power – Application for Approval of its Amendment to Agreement for Electric Service to Additional Customers with City of Monroe, Utah |
1/30/2023 | Docket No. 23-035-03 — Notice of Filing and Comment Period – Rocky Mountain Power – Formal Complaint of Cindy L. Thompson |
1/10/2023 | Docket No. 23-035-T01 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Revisions to Electric Service Schedule No. 94, Energy Balancing Account |
1/30/2023 | Docket No. 23-035-T02 — Notice of Filing and Comment Period – Rocky Mountain Power – Proposed Tariff Revisions to Electric Service Schedule No. 300, Regulation Charges |