These orders and notices are stored in PDF, Word or html format; when viewed or copied they may be slightly different than the original document and should not be considered official copies. They are listed by the month issued, docket number, name of the order, notice, or (occasionally) another type of document issued by the Public Service Commission of Utah.

January
1/3/2008 Docket Nos. 06-035-163, 07-035-04, and 07-035-14Report and Order (PDF) (Issued: 1/3/08) Rocky Mountain Power – Applications
1/29/2008 Docket No. 07-028-02 — Report and Order Dismissing Complaint (PDF) (Issued: 1/29/08) Garkane Energy vs. Whitney – Formal Complaint
1/9/2008 Docket No. 07-035-93Amendment to and Modification of December 27, 2007 Scheduling Order (PDF) (Issued: 1/9/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/16/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 1/16/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/16/2008 Docket No. 07-035-93Erratum Order Granting Intervention (PDF) (Issued: 1/16/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rate
1/28/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 1/28/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/28/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 1/28/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/29/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 1/29/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/29/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 1/29/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/29/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 1/29/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/29/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 1/29/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/30/2008 Docket No. 07-035-93Notice of Hearing on Test Year Selection (PDF) (Issued: 1/30/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
1/28/2008 Docket No. 07-035-94Report and Order (PDF) (Issued: 1/28/08) PacifiCorp – Application for Approval of a Solicitation Process for a Flexible Resource
1/29/2008 Docket No. 07-035-97 — Notice of Hearing (PDF) (Issued: 1/29/08) Adams vs. Rocky Mountain Power – Formal Complaint
February
2/4/2008 Docket No. 05-035-47Notice of Hearing (PDF) (Issued: 2/4/08) PacifiCorp – 2009 Request for Proposals for Flexible Resource
2/4/2008 Docket No. 07-035-13Order Adopting and Approving Stipulation on Depreciation Rate Changes (PDF) (Issued: 2/4/08) Rocky Mountain Power – Application
2/25/2008 Docket No. 07-035-22Notice of Scheduling Conference (PDF) (Issued: 2/25/2008) Rocky Mountain Power vs. Heber Light & Power – Complaint
2/8/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 2/8/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
2/13/2008 Docket No. 07-035-93Modification and Clarification of Part 6 of December 27, 2007, Scheduling Order (PDF) (Issued: 2/13/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
2/14/2008 Docket No. 07-035-93Order on Test Period (PDF) (Issued: 2/14/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
2/19/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 2/19/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
2/19/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 2/19/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
2/20/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 2/20/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
2/25/2008 Docket No. 07-035-94Notice of Scheduling Conference (PDF) (Issued: 2/25/08) Rocky Mountain Power – Application
2/14/2008 Docket No. 07-035-97 — Report and Order (PDF) (Issued: 2/14/08) Adams vs. Rocky Mountain Power – Formal Complaint
2/6/2008 Docket No. 07-2035-01Report and Order (PDF) (Issued: 2/6/08) PacifiCorp – Integrated Resource Plan
2/26/2008 Docket No. 08-2490-01Scheduling Order Setting Deadline for Filing Responses to Application and Motion (PDF) (Issued: 2/26/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
March
3/21/2008 Docket No. 00-035-T01Report and Order (PDF) (Issued: 3/21/08) PacifiCorp / Scottish Power – Tariff Revisions
3/11/2008 Docket No. 07-035-22Scheduling Order (PDF) (Issued: 3/11/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
3/3/2008 Docket No. 07-035-69 — Notice of Settlement Conference (PDF) (Issued: 3/3/08) Harris vs. Rocky Mountain Power – Formal Complaint
3/11/2008 Docket No. 07-035-93Notice of Information Provided by Rocky Mountain Power to the Commission (PDF) (Issued: 3/11/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
3/26/2008 Docket No. 07-035-93Order Granting Intervention (PDF) (Issued: 3/26/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
3/4/2008 Docket No. 07-035-94Scheduling Order (PDF) (Issued: 3/4/08) Rocky Mountain Power – Application
3/26/2008 Docket No. 07-035-95 Order (PDF) (Issued: 3/26/08) Rocky Mountain Power – Request to Eliminate Requirement to File the Utah State Version of the FERC Form No. 1
3/11/2008 Docket No. 07-035-99 — Notice of Hearing (PDF) (Issued: 3/11/08) Rocky Mountain Power and Sunnyside Cogeneration Associates – Application for an Amendment to Power Purchase Agreement
3/27/2008 Docket No. 08-035-T01Order Suspending Tariff (PDF) (Issued: 3/27/08) Rocky Mountain Power – Revisions to Tariff Schedule 110 Energy Star Homes Program
3/18/2008 Docket No. 08-2490-01Order Granting Intervention (PDF) (Issued: 3/18/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
April
4/3/2008 Docket No. 96-2018-01 — Order Dismissing Petition (PDF) (Issued: 4/3/08) Sunnyside Cogeneration Associates – Petition for Enforcement of Contract Provisions
4/3/2008 Docket No. 05-035-46Order Dismissing Application (PDF) (Issued: 4/3/08) Rocky Mountain Power and Sunnyside Cogeneration Associates – Application for an Amendment to Power Purchase Agreement
4/9/2008 Docket No. 07-035-22Order Granting Intervention (PDF) (Issued: 4/9/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
4/21/2008 Docket No. 07-035-22Order Granting Motion to Stay Procedural Schedule and to Schedule Status and Scheduling Conference Notice of Status and Scheduling Conference (PDF) (Issued: 4/21/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
4/15/2008 Docket No. 07-035-69 — Notice of Hearing (PDF) (Issued: 4/15/08) Harris vs. Rocky Mountain Power – Formal Complaint
4/3/2008 Docket No. 07-035-94Order Granting Intervention (PDF) (Issued: 4/3/08) Rocky Mountain Power – Application
4/3/2008 Docket No. 07-035-99 — Report and Order on Application (PDF) (Issued: 4/3/08) Rocky Mountain Power and Sunnyside Cogeneration Associates – Application for an Amendment to Power Purchase Agreement
4/25/2008 Docket No. 08-035-T02Order Suspending Tariff Tariff (PDF) (Issued: 4/25/08) Renewable Energy Rider and Optional Bulk Purchase Option
4/2/2008 Docket No. 08-035-35Notice of Technical Conference (PDF) (Issued: 4/2/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
4/15/2008 Docket No. 08-035-35Procedural Order and Notice of Hearing (PDF) (Issued: 4/15/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
4/21/2008 Docket No. 08-035-35Notice Canceling Hearing (PDF) (Issued: 4/24/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
4/30/2008 Docket No. 08-035-35Order Granting Request for Waiver of Solicitation (PDF) (Issued: 4/30/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
4/21/2008 Docket No. 08-035-40Request for Comments (PDF) (Issued: 4/21/08) Rocky Mountain Power – Review of Report “Assessment of Long-Term System-Wide Potential for Demand-Side and Other Supplemental Resources”
4/9/2008 Docket No. 08-2490-01Order Granting Intervention (PDF) (Issued: 4/9/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
May
5/14/2008 Docket No: 00-035-T01Notice of Technical Conference (PDF) (Issued: 5/14/08) Rocky Mountain Power – Tariff P.S.C.U. No. 42, Re: Proposed Schedule 70 – Tariff Revisions Attributable to the Recently Approved Merger between PacifiCorp and Scottish Power in Docket No. 98-2035-04
5/21/2008 Docket No. 07-035-22Notice Rescheduling Status and Scheduling Conference (PDF) (Issued: 5/21/2008) Rocky Mountain Power vs. Heber Light & Power – Complaint
5/27/2008 Docket No. 07-035-69 — Report and Order (PDF) (Issued: 5/27/08) Harris vs. Rocky Mountain Power – Formal Complaint
5/2/2008 Docket No. 07-035-93Amended Notice of Settlement Conference (PDF) (Issued: 5/2/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
5/23/2008 Docket No. 07-035-94Commission’s Suggested Modifications and Order (PDF) (Issued: 5/23/08) Rocky Mountain Power – Application
5/2/2008 Docket No. 08-035-T01Order Approving Tariff Revision and Vacating March 27, 2008, Tariff Suspension Order (PDF) (Issued: 5/2/08) Rocky Mountain Power – Revisions to Tariff Schedule 110 Energy Star Homes Program
5/27/2008 Docket No. 08-035-34 — Report and Order Dismissing Complaint (PDF) (Issued: 5/27/08) Allen vs. Rocky Mountain Power – Formal Complaint
5/5/2008 Docket No. 08-035-35Order Granting Intervention (PDF) (Issued: 5/5/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
5/20/2008 Docket No. 08-035-35Protective Order (PDF) (Issued: 5/20/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
5/27/2008 Docket No. 08-035-38Order on Request to Intervene (PDF) (Issued: 5/27/08) Rocky Mountain Power – Notice of Intent to File a General Rate Case
5/27/2008 Docket No. 08-035-41 — Report and Order Dismissing Complaint (PDF) (Issued: 5/27/08) Cutler vs. Rocky Mountain Power – Formal Complaint
5/7/2008 Docket No. 08-035-42Notice of Scheduling Conference (PDF) (Issued: 5/7/08) Rocky Mountain Power – Application for a Certificate of Convenience and Necessity Authorizing Construction of the Populus-to-Terminal 345 kV Transmission Line Project
5/20/2008 Docket No. 08-035-42Scheduling Order (PDF) (Issued: 5/20/08) Rocky Mountain Power – Application for a Certificate of Convenience and Necessity Authorizing Construction of the Populus-to-Terminal 345 kV Transmission Line Project
5/5/2008 Docket No. 08-2490-01Notice of Hearing (PDF) (Issued: 5/5/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
5/16/2008 Docket No. 08-2490-01Order Granting Motion to Dismiss the Application of Milford I and Milford II for Certificates of Convenience and Necessity (PDF) (Issued: 5/16/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
June
6/3/2008 Docket No. 07-035-93Public Service Commission Data Request (PDF) (Issued: 6/3/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
6/6/2008 Docket No. 08-035-42Protective Order (PDF) (Issued: 6/6/08) Rocky Mountain Power – Application for a Certificate of Convenience and Necessity Authorizing Construction of the Populus-to-Terminal 345 kV Transmission Line Project
6/10/2008 Docket No. 07-035-22Second Notice Rescheduling Status and Scheduling Conference (PDF) (Issued: 6/10/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
6/10/2008 Docket No. 06-035-148Notice of Hearing (PDF) (Issued: 6/10/08) Vetere vs. Rocky Mountain Power – Formal Complaint
6/11/2008 Docket No. 08-066-01Report and Order Approving Issuance of Securities (PDF) (Issued: 6/11/08) Dixie-Escalante Rural Electric Association, Inc. – Application for Authority to Issue Securities
6/11/2008 Docket No. 08-035-56 and 08-035-40Erratum Request for Comments (PDF) (Issued: 6/11/08) PacifiCorp – Review of Report “Assessment of Long-Term System-Wide Potential for Demand-Side and Other Supplemental Resources”
6/13/2008 Docket No. 08-035-35Amened Procedural Order (PDF) (Issued: 6/13/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
6/13/2008 Docket No. 08-035-T04Order Approving Tariff with Certain Conditions (PDF) (Issued: 6/13/08) Rocky Mountain Power – Approval of Tariff P.S.C.U. No. 47, Re: Schedule 135 – Net Metering Service
6/27/2008 Docket No. 08-035-56Scheduling Order (PDF) (Issued: 6/27/08) PacifiCorp – Review of Report “Assessment of Long-Term System-Wide Potential for Demand-Side and Other Supplemental Resources”
July
7/7/2008 Docket No. 07-035-22Order Vacating Procedural Schedule (PDF) (Issued: 7/7/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
7/3/2008 Docket No. 07-035-94Order Denying Petition for Reconsideration, Review or Rehearing (PDF) (Issued: 7/3/08) Rocky Mountain Power – Application
7/7/2008 Docket No. 07-2035-01Notice of Scheduling Conference (PDF) (Issued: 7/7/08) PacifiCorp – Integrated Resource Plan
7/17/2008 Docket No. 07-2035-01Scheduling Order (PDF) (Issued: 7/17/08) PacifiCorp – Integrated Resource Plan
7/17/2008 Docket No. 08-035-38Notice of Scheduling Conference (PDF) (Issued: 7/17/08) Rocky Mountain Power – Notice of Intent to File a General Rate Case
7/30/2008 Docket No. 08-035-38Protective Order (PDF) (Issued: 7/30/08) Rocky Mountain Power – Notice of Intent to File a General Rate Case
7/7/2008 Docket No. 08-035-42Order Granting Intervention (PDF) (Issued: 7/7/08) Rocky Mountain Power – Application for a Certificate of Convenience and Necessity Authorizing Construction of the Populus-to-Terminal 345 kV Transmission Line Project
7/22/2008 Docket No. 08-035-56Amended Scheduling Order (PDF) (Issued: 7/22/08) PacifiCorp – Review of Report “Assessment of Long-Term System-Wide Potential for Demand-Side and Other Supplemental Resources”
7/2/2008 Docket No. 08-2490-01Order on Petition for Rehearing (PDF) (Issued: 7/2/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
7/9/2008 Docket No. 08-2490-01 Notice of Scheduling Conference (PDF) (Issued: 7/9/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
7/16/2008 Docket No. 08-2490-01Scheduling Order (PDF) (Issued: 7/16/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
August
8/11/2008 Dockt No. 07-035-93Report and Order on Revenue Requirement (PDF) (Issued: 8/11/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
8/14/2008 Docket No. 07-035-93Third Amended Scheduling Order (PDF) (Issued: 8/14/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
8/21/2008 Docket No. 07-035-93Erratum Report and Order on Revenue Requirement (PDF) (Issued: 8/21/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
8/26/2008 Docket No. 07-035-93Fourth Amended Scheduling Order Changing Testimony Filing Dates (PDF) (Issued: 8/26/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
8/1/2008 Docket No. 08-035-35Report and Order (PDF) (Issued: 8/1/08) Rocky Mountain Power – Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision
8/1/2008 Docket No. 08-035-38Scheduling Order (PDF) (Issued: 8/1/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/11/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issued: 8/11/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/11/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issued: 8/11/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/18/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issue: 8/18/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/25/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issued: 8/25/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/25/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issued: 8/25/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/26/2008 Docket No. 08-035-38Supplement to August 1, 2008, Scheduling Order (PDF) (Issued: 8/26/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/27/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issued: 8/27/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
8/5/2008 Docket No. 08-035-42Order Granting Intervention (PDF) (Issued: 8/5/08) Rocky Mountain Power – Application for a Certificate of Convenience and Necessity Authorizing Construction of the Populus-to-Terminal 345 kV Transmission Line Project
8/28/2008 Docket No. 08-035-56Third Amended Scheduling Order (PDF) (Issued: 8/28/08) PacifiCorp – Review of Report “Assessment of Long-Term System-Wide Potential for Demand-Side and Other Supplemental Resources”
8/1/2008 Docket No. 08-2490-01Protective Order (PDF) (Issued: 8/1/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
8/26/2008 Docket No. 08-2490-01Order on Scope of Intervention and Hearing (PDF) (Issued: 8/26/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
September
9/16/2008 Docket No. 07-035-22Notice of Scheduling Conference (PDF) (Issued: 9/16/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
9/30/2008 Docket No. 07-035-22Procedural Order (PDF) (Issued: 9/30/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
9/22/2008 Docket No. 07-035-93Fifth Amended Scheduling Order (PDF) (Issued: 9/22/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
9/22/2008 Docket No. 07-035-93Order on Request for Reconsideration (PDF) (Issued: 9/22/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
9/29/2008 Docket No. 07-035-93Sixth Amended Scheduling Order (PDF) (Issued: 9/29/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
9/30/2008 Docket No. 07-035-93Seventh Amended Scheduling Order (PDF) (Issued: 9/30/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
9/30/2008 Docket No. 07-035-93Erratum Seventh Amended Scheduling Order (PDF) (Issued: 9/30/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
9/25/2008 Docket No. 07-035-94Approval of Request for Proposals (PDF) (Issued: 9/25/2008) Rocky Mountain Power – Application
9/3/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issued: 9/3/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
9/17/2008 Docket No. 08-035-38Order Granting Intervention (PDF) (Issued: 9/17/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
9/23/2008 Docket No. 08-035-38Order on Motions to Dismiss or Address 240-Day Time Period (PDF) (Issued: 9/23/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
9/29/2008 Docket No. 08-035-38Amended Scheduling Order (PDF) (Issued: 9/29/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
9/30/2008 Docket No. 08-035-38Second Amended Scheduling Order (PDF) (Issued: 9/30/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
9/30/2008 Docket No. 08-035-38Erratum Second Amended Scheduling Order (PDF) (Issued: 9/30/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
9/4/2008 Docket No. 08-035-42Report and Order Granting Certificate and Certificate of Public Need and Necessity (PDF) (Issued: 9/4/08) Rocky Mountain Power – Application for a Certificate of Convenience and Necessity Authorizing Construction of the Populus-to-Terminal 345 kV Transmission Line Project
9/25/2008 Docket No. 08-035-56Fourth Amended Scheduling Order (PDF) (Issued: 9/25/08) PacifiCorp – Review of Report “Assessment of Long-Term System-Wide Potential for Demand-Side and Other Supplemental Resources”
9/25/2008 Docket No. 08-035-78Request for Comments and Notice of Technical Conference (PDF) (Issued: 9/25/08) Rocky Mountain Power – Consideration of Changes to Schedule No. 135 – Net Metering Service
9/4/2008 Docket No. 08-2490-01Notice of Hearing on Motion to Compel (PDF) (Issued: 9/4/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
9/10/2008 Docket No. 08-2490-01Notice of Continuance of Motion to Compel Hearing (PDF) (Issued: 9/10/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
9/23/2008 Docket No. 08-2490-01Notice of Hearing of Public Witness Testimony and Comment (PDF) (Issued: 9/23/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
9/23/2008 Docket No. 08-2490-01Order on Request for Clarification (PDF) (Issued: 9/23/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
October
10/20/2008 Docket No. 06-035-148Report and Order (PDF) (Issued: 10/20/08) Vetere vs. Rocky Mountain Power – Formal Complaint
10/13/2008 Docket No. 07-035-93Order on Reconsideration (PDF) (Issued: 10/13/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
10/7/2008 Docket No. 08-027-01 — Order (PDF) (Issued: 10/7/08) Flowell Electric Association, Inc. – Application for Authority to Issue Securities
10/14/2008 Docket No. 08-035-38Scheduling Order for Revenue Requirement and Cost of Service/Rate Design (PDF) (Issued: 10/14/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
10/30/2008 Docket No. 08-035-38Order on Motion for Approval of Test Period (PDF) (Issued: 10/30/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
10/30/2008 Docket No. 08-035-38Second Scheduling Order for Revenue Requirement and Cost of Service/Rate Design (PDF) (Issued: 10/30/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
10/28/2008 Docket No. 08-035-71 — Scheduling Order (PDF) (Issued: 10/28/08) Reynolds vs. Rocky Mountain Power – Formal Complaint
10/21/2008 Docket No. 08-035-82Notice of Hearing (PDF) (Issued: 10/21/08) PacifiCorp and Tesoro Refining and Marketing Company – Application for a Power Purchase Agreement
10/21/2008 Docket No. 08-035-83Notice of Hearing (PDF) (Issued: 10/21/08) PacifiCorp and Kennecott Utah Copper Corporation – Application for a Power Purchase Agreement
10/8/2008 Docket No. 08-2490-01Report and Order (PDF) (Issued: 10/8/08) Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC – Application
November
11/3/2008 Docket No. 07-035-22Report and Order (PDF) (Issued: 11/3/08 ) Rocky Mountain Power vs. Heber Light & Power – Complaint
11/3/2008 Docket No. 07-035-22Scheduling Order (PDF) (Issued: 11/3/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
11/6/2008 Docket No. 07-035-22Erratum Scheduling Order (PDF) (Issued: 11/6/2008) Rocky Mountain Power vs. Heber Light & Power – Complaint
11/17/2008 Docket No. 07-035-22Amended Scheduling Order (PDF) (Issued: 11/17/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
11/6/2008 Docket No. 07-035-93Report and Order on Cost of Service and Rate Design (PDF) (Issued: 11/6/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates
11/6/2008 Docket No. 08-035-38Third Scheduling Order for Revenue Requirement and Cost of Service/Rate Design (PDF) (Issued: 11/6/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
11/6/2008 Docket No. 08-035-82Protective Order (PDF) (Issued: 11/6/08) PacifiCorp and Tesoro Refining and Marketing Company – Application for a Power Purchase Agreement
11/17/2008 Docket No. 08-035-82Order Granting Intervention (PDF) (Issued: 11/17/08) PacifiCorp and Tesoro Refining and Marketing Company – Application for a Power Purchase Agreement
11/17/2008 Docket No. 08-035-82Notice Canceling Hearing (PDF) (Issued: 11/17/08) PacifiCorp and Tesoro Refining and Marketing Company – Application for a Power Purchase Agreement
11/17/2008 Docket No. 08-035-82Second Notice of Hearing (PDF) (Issued: 11/17/08) PacifiCorp and Tesoro Refining and Marketing Company – Application for a Power Purchase Agreement
11/6/2008 Docket No. 08-035-83Protective Order (PDF) (Issued: 11/6/08) PacifiCorp and Kennecott Utah Copper Corporation – Application for a Power Purchase Agreement
11/17/2008 Docket No. 08-035-83Order Granting Intervention (PDF) (Issued: 11/17/08) PacifiCorp and Kennecott Utah Copper Corporation – Application for a Power Purchase Agreement
11/17/2008 Docket No. 08-035-83Notice Canceling Hearing (PDF) (Issued: 11/17/08) PacifiCorp and Kennecott Utah Copper Corporation – Application for a Power Purchase Agreement
11/17/2008 Docket No. 08-035-83Second Notice of Hearing (PDF) (Issued: 11/17/08) PacifiCorp and Kennecott Utah Copper Corporation – Application for a Power Purchase Agreement
11/25/2008 Docket No. 08-035-84 — Notice of Hearing (PDF) (Issued: 11/25/08) Dillman and Ginman vs. Rocky Mountain Power – Formal Complaint
11/19/2008 Docket No. 08-035-93Notice of Technical and Scheduling Conference (PDF) (Issued: 11/19/08) Rocky Mountain Power – Application for an Accounting Order Regarding Pension Curtailment and Pension Measurement Date Change
December
12/22/2008 Docket No. 07-035-22Amended Scheduling Order (PDF) (Issued: 12/22/08) Rocky Mountain Power vs. Heber Light & Power – Complaint
12/24/2008 Docket No. 08-035-T09Order Approving Tariff with Certain Modifications and Notice of Technical Conference (PDF) (Issued: 12/24/08) Rocky Mountain Power – Request for Approval of Tariff P.S.C.U. No. 47, Re: Advice No. 08-10 Schedule 114 – Air-Conditioner – Direct Load Control Program (A/C-DLC) (Cool Keeper Program)
12/15/2008 Docket No. 08-035-38Erratum Notice of Scheduling Conference (PDF) (Issued: 12/15/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
12/15/2008 Docket No. 08-035-38Notice of Scheduling Conference (PDF) (Issued: 12/15/08) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utilities Rates
12/22/2008 Docket No. 08-035-71 — Scheduling Order (PDF) (Issued: 12/22/08) Reynolds vs. Rocky Mountain Power – Formal Complaint
12/18/2008 Docket No. 08-035-78Notice of Proposed Modifications and Notice of Hearing (PDF) ( Issued: 12/18/08) Rocky Mountain Power – Consideration of Changes to Schedule No. 135 – Net Metering Service
12/15/2008 Docket No. 08-035-82Report and Order (PDF) (Issued: 12/15/08) PacifiCorp and Tesoro Refining and Marketing Company – Application for a Power Purchase Agreement
12/15/2008 Docket No. 08-035-83Report and Order (PDF) (Issued: 12/15/08) PacifiCorp and Kennecott Utah Copper Corporation – Application for a Power Purchase Agreement
12/10/2008 Docket No. 08-035-93Scheduling Order (PDF) (Issued: 12/10/08) Rocky Mountain Power – Application for an Accounting Order Regarding Pension Curtailment and Pension Measurement Date Change
12/4/2008 Docket No. 08-035-95Protective Order (PDF) (Issued: 12/4/08) Rocky Mountain Power – Application for Significant Energy Resource Decision Resulting from 2012 Request for Proposals
12/10/2008 Docket No. 08-035-95Notice of Scheduling Conference (PDF) (Issued: 12/10/08) Rocky Mountain Power – Application for Significant Energy Resource Decision Resulting from 2012 Request for Proposals
12/24/2008 Docket No. 08-035-95Scheduling Order (PDF) (Issued: 12/24/08) Rocky Mountain Power – Application for Significant Energy Resource Decision Resulting from 2012 Request for Proposals