Date |
Description |
March 14, 2013 |
Correspondence from Gary L. Widerburg |
February 11, 2013 |
Comments of Renewable Energy Advisors |
February 7, 2013 |
Comments from DPU |
February 6, 2013 |
Cover Letter
Exhibit A – Rocky Mountain Power’s Service Quality Standards – June 2012 Service Quality Review Report (Revised) |
January 31, 2013 |
Comments from DPU |
January 10, 2013 |
Action Request Due: February 8, 2013 |
December 28, 2012 |
Cover Letter
Exhibit A – Description of Avoided Cost Input Changes
Exhibit B – Update Impact – Updated Avoided Cost Study
Exhibit C – Step Study between Prior Filing and Current Filing
Certificate of Service |
December 21, 2012 |
RMP’s Notice of Sole Source Contract with IBM Corporation |
December 19, 2012 |
RMP’s Notice of Sole Source Contract with Genesys Telecommunications Lab |
December 19, 2012 |
RMP’s Notice of Sole Source Contract with General Electric International |
December 13, 2012 |
Action Request Due: January 31, 2013 |
December 12, 2012 |
Notice of Affiliate Transaction between Rocky Mountain Power and International Business Machines Corporation Emptoris
Exhibit A – Signed Contract
Exhibit B – First Amendment to the Pacificorp Service Agreement |
December 11, 2012 |
Courtesy Copy of Memo from DPU to Judge John P. Dring Re: FERC Rate Case Settlement |
December 10, 2012 |
Cover Letter
Rocky Mountain Power’s June 2012 Service Quality Review Report |
December 3, 2012 |
Comments from DPU
Exhibit A |
November 27, 2012 |
Quarterly Compliance Filing – 2012.Q3 Avoided Cost Input Changes
Certificate of Service |
November 21, 2012 |
RMP’s Notice of Sole Source Contract with UPS Turbine Services, LLC
|
November 21, 2012 |
RMP’s Notice of Sole Source Contract with Nexant Inc |
November 21, 2012 |
RMP’s Notice of Sole Source Contract with Wyoming Machinery Company |
November 21, 2012 |
RMP’s Notice of Sole Source Contract with Nationwide Boiler, Inc.
|
November 19, 2012 |
Courtesy Copy of FERC Form 556 Certification of Qualifying Facility (QF) Status for a Small Power Production or Cogeneration Facility regarding eBay, Inc.
|
November 19, 2012 |
Cover Letter
PacifiCorp’s Quarterly Report on Form 10-Q for the Period Ended September 30, 2012 |
November 19, 2012 |
PacifiCorp’s Quarterly Financing Activity Report
|
November 15, 2012 |
Action Request Due: December 3, 2012 |
November 9, 2012 |
Cover Letter
RMP Hourly QF Purchases – Third Quarter 2012 11-9-2012 [PROPRIETARY] |
November 9, 2012 |
PacifiCorp’s Declaration of Dividend |
October 31, 2012 |
Rocky Mountain Power’s Utah Variance Report
|
October 31, 2012 |
Cover Letter
Exhibit A – JAM Results of Operations with ECD
Exhibit B – JAM Results of Operations without ECD
Exhibit C – Adjustment Cover Sheets
Exhibit D – Wind Generation Resources Summary [PROPRIETARY] |
October 25, 2012 |
Courtesy Letter from Ballard Spahr |
October 22, 2012 |
Notice of Affiliate Transaction between Rocky Mountain Power and International Business Machines Corporation (IBM)
Exhibit A – Professional Services Contract
Exhibit B – Pricing Schedule [PROPRIETARY] |
September 24, 2012 |
Comments from DPU
Certificate of Service |
September 24, 2012 |
Comments of Interwest Energy Alliance
Exhibit A – Review of Regional Loads
Certificate of Service |
September 21, 2012 |
Comments of Utah Clean Energy
Certificate of Service |
September 19, 2012 |
RMP’s Notice of Sole Source Contract with Dalton Olmstead & Fuglevand
|
September 19, 2012 |
RMP’s Notice of Sole Source Contract with Dynalectric |
September 19, 2012 |
RMP’s Notice of Sole Source Contract with Rocky Mountain Line Systems, Inc. |
September 19, 2012 |
RMP’s Notice of Sole Source Contract with American Red Cross
|
September 19, 2012 |
RMP’s Notice of Sole Source Contract with Oregon Heat
|
September 19, 2012 |
RMP’s Notice of Sole Source Contract with Wyoming Weatherization Services |
September 18, 2012 |
RMP Corrected Notice of Sole Source Contract with Devoge Electric, Inc |
September 15, 2012 |
Correspondence from Morgan County Council |
September 14, 2012 |
Comments from DPU |
September 13, 2012 |
Comments from DPU
Exhibit A |
September 12, 2012 |
Notice of Affiliate Transaction between PacifiCorp and National Indemnity Company (NICO)
Exhibit A – Indemnity Agreement |
September 11, 2012 |
Courtesy Copy of Fourth Amended & Restated Transmission Service & Operating Agreement (“Agreement”), dated 8/27/12, between PacifiCorp and Utah Municipal Power Agency (“UMPA”), to be designated as PacifiCorp Third Revised Rate Schedule FERC No. 637
|
September 10, 2012 |
Order Granting Extension of Time |
September 7, 2012 |
PacifiCorp’s Quarterly Financing Activity Report for the Period Ended June 30, 2012 |
September 6, 2012 |
Comments from DPU
Certificate of Service |
August 31, 2012 |
Notice of Affiliate Transaction between PacifiCorp and Kern River Gas Transportation Company
Exhibit A – Temporary Construction Workspace Agreement
Exhibit B – Map of Grantor’s Land and Map of Temporary Workspaces |
August 30, 2012 |
Cover Letter
FERC Form No. 1 – Resubmission |
August 30, 2012 |
Order Granting Extension of Time |
August 29, 2012 |
RMP’s Notice of Sole Source Contract with Sigma Energy Solutions |
August 29, 2012 |
RMP’s Notice of Sole Source Contract with Prysmian Power Cables & Systems |
August 29, 2012 |
RMP’s Notice of Sole Source Contract with ITC Elec Technologies, Inc.
|
August 29, 2012 |
RMP’s Notice of Sole Source Contract with Devoge Electric, Inc.
|
August 29, 2012 |
RMP’s Notice of Sole Source Contract with Automation & Electronics, Inc |
August 28, 2012 |
Correspondence from Rocky Mountain Power Re: Request for Extension of Filing Date |
August 27, 2012 |
Action Request Due: September 13, 2012 |
August 23, 2012 |
PacifiCorp’s Declaration of Dividend |
August 16, 2012 |
PacifiCorp’s Quarterly Report on Form 10-Q for the Period Ended June 30, 2012 |
August 14, 2012 |
Cover Letter
RMP Hourly QF Purchases – Second Quarter 2012 [PROPRIETARY] |
July 31, 2012 |
Cover Letter
Merger Commitment U1 |
July 17, 2012 |
Erratum Report and Order on PacifiCorp’s 2012 Fossil Fuel Heat Rate Improvement Plan |
July 16, 2012 |
Report and Order on PacifiCorp’s 2012 Fossil Fuel Heat Rate Improvement Plan |
July 10, 2012 |
Action Request Due: September 10, 2012 Re: Quarterly Compliance Filing |
July 5, 2012 |
Courtesy Copy of Comments on Coal Replacement Study from HEAL Utah [PROPRIETARY] |
JUne 29, 2012 |
RMP’s Notice of Sole Source Contract with Cougar Construction, Inc. |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Brent Woodward, Inc. |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Alstom Power, Inc. |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with ABB Inc. |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Power Source Services Inc. |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Provida Management Group LLC |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with ABB Power Inc. |
June 29, 2012 |
RMP’s Notice of Sole Source Contract Extension with Chilcote Engineering to Provide Engineering Consulting Services for the Protective Relay Schemes |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Tetra Tech Inc. – Exercise the First of Two Extension Options |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with P Cubed, Inc |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Lancaster Drilling Inc |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with General Electric – Jim Bridger Unit 2 |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with General Electric – Three Peaks |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Doble Engineering |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Kenny Construction |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Vision Services Plan |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Computer Associates International |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Codale Electric Supply Inc |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Meylan Enterprises |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with JH Fletcher Company |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Bucyrus America Caterpillar |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Esco Corporation |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Joy Mining Machinery |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with FMC Corporation |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Schauenburg Flexadux |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Black and Veatch Corp. |
June 29, 2012 |
RMP’s Notice of Two Sole Source Contract Extensions with Hewitt Associates, LLC |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with URS Corporation |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with General Electric International – Huntington Unit 1 |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with BMC Software |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Sargent & Lundy LLC |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with ProEnergy Services, LLC |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Elkhorn Construction |
June 29, 2012 |
RMP’s Notice of Sole Source Contract with Enviro Engineering Inc |
June 29, 2012
[Re: 03-035-14] |
Cover Letter Re: Quarterly Compliance Filing – 2012.Q2 Avoided Cost Input Changes
Certificate of Service
Exhibit A – Description of Avoided Cost Input Changes
Exhibit B – Update Impact – Updated Avoided Cost Study
Exhibit C – Step Study between Prior Filing and Current Filing
Exhibit D – Illustrative Wind Avoided Costs
Exhibit E – Incremental Wind Integration Costs |
June 27, 2012 |
Notice of Affiliate Transaction between Rocky Mountain Power and Wells Fargo Bank, N.A. and Wells Fargo Securities, LLC
Exhibit A – Credit Agreement [PROPRIETARY] |
June 27, 2012 |
PacifiCorp’s Notice of Intent to Dissolve its Affiliates, PacifiCorp Environmental Remediation Company (“PERCO”), and Pacific Investment Management Inc. (“PIMI”)
|
June 22, 2012 |
Notice of Amended Affiliate Interest Transaction between Rocky Mountain Power and Wells Fargo Bank, N.A.
Exhibit A – First Amendment to Letter of Credit Agreement
Exhibit B – First Amendment to Letter of Credit Agreement
Exhibit C – First Amendment to Letter of Credit Agreement
Exhibit D – First Amendment to Letter of Credit Agreement |
June 19, 2012 |
Notice of Affiliate Transaction between Rocky Mountain Power and Wells Fargo Securities, LLC |
June 12, 2012 |
Comments from DPU |
June 5, 2012 |
Courtesy Copy of PacifiCorp’s Proposed Revisions to its Amended and Restated Transmission Service and Operating Agreement (“TSOA”) with Utah Associated Municipal Power Systems (“UAMPS”)
|
June 5, 2012 |
Notice of Affiliate Transaction between PacifiCorp and Wells Fargo Bank, N.A. and Wells Fargo Securities, LLC
Exhibit A – Form of Joinder Agreement [PROPRIETARY]
Exhibit B – Form of Additional Arranger Fee Letter [PROPRIETARY] |
June 4, 2012 |
Courtesy Copy of Request for Limited Tariff Waiver and Request for Fast Track Processing of PacifiCorp
|
June 4, 2012 |
Notice of Affiliate Transaction between PacifiCorp and International Business Machines Corporation (“IBM”)
Exhibit A – Invoice
Exhibit B – Quote Number 15737452
Exhibit C – Information Management Subscription & Support Quote
Exhibit D – ECM Subscription & Support Renewal Quote
Exhibit E – Workload Pricer – Value Unit Price Report
Exhibit F – Invoice for Licensed Program Charges and Lease/Rental
Exhibit G – Quote 052412 |
June 4, 2012 |
Notice of Affiliate Transaction between PacifiCorp and International Business Machines Corporation (IBM) through CompuCom Systems, Inc.
Exhibit A
Exhibit B – Signed Contract |
May 31, 2012 |
Cover Letter
PacifiCorp’s CY 2011 Affiliated Interest Report
Exhibit A – HomeServices of America, Inc. Financial Statements [PROPRIETARY]
Exhibit B – The MEHC Insurance Services Ltd. Financial Statements [PROPRIETARY]
Exhibit C – The Cordova Energy Company LLC Financial Statements [PROPRIETARY]
Courtesy Copy of PacifiCorp’s Informational Filing of 2012 Transmission Formula Rate Annual Update Filed with the FERC |
May 30, 2012 |
PacifiCorp’s Quarterly Financing Activity Report for the Period Ended March 31, 2012 |
May 17, 2012 |
Courtesy Copy of Sunnyside Cogeneration Associates’ Filing with the Federal Energy Regulatory Commission (FERC)
|
May 16, 2012 |
Action Request Due: September 7, 2012 Regarding RMP’s Service Quality Review Report for 2011 Filed on April 11, 2012 |
May 14, 2012 |
PacifiCorp’s Quarterly Report on Form 10-Q for the Period Ended March 31, 2012 |
May 10, 2012 |
Notice of Affiliate Transaction between PacifiCorp and BNSF Railway Company (“BNSF”)
Exhibit A |
May 8, 2012 |
Action Request Due: June 13, 2012 |
May 1, 2012 |
Cover Letter
Rocky Mountain Power’s Fossil Fuel Heat Rate Improvement Plan
Exhibit A – FERC Form 1 Past 10 Years and Summary Sheet |
May 1, 2012 |
Cover Letter
Rocky Mountain Power’s 2011 Annual Report |
April 30, 2012 |
Cover Letter
Exhibit A – JAM Results of Operations with ECD
Exhibit B – JAM Results of Operations without ECD
Exhibit C – Adjustment Cover Sheets
Exhibit D – Wind Generation Resources Summary [PROPRIETARY] |
April 25, 2012 |
Notice of Affiliate Transaction between PacifiCorp and BNSF Railway Company (“BNSF”)
Exhibit A – Right of Way Easement |
April 24, 2012 |
Cover Letter
Rocky Mountain Power Hourly QF Purchases – First Quarter 2012 [PROPRIETARY] |
April 20, 2012 |
RMP’s Notice of Sole Source Contract with SAP America |
April 20, 2012 |
RMP’s Notice of Sole Source Contract with Osmose Utilities Services, Inc. |
April 20, 2012 |
RMP’s Notice of Sole Source Contract with Niels Fugal Sons Company LLC |
April 20, 2012 |
RMP’s Notice of Sole Source Contract with Line Inspection Services, Inc. |
April 20, 2012 |
RMP’s Notice of Sole Source Contract with Intech Services, Inc. |
April 20, 2012 |
RMP’s Notice of Sole Source Contract with Custom Lighting Services LLC |
April 11, 2012 |
Cover Letter
Rocky Mountain Power’s Service Quality Review Report for 2011 |
April 9, 2012 |
Notice of Affiliate Transaction between PacifiCorp and BNSF Railway Company (“BNSF”)
Exhibit A – License for Electric Supply Line Across or Along Railway Property |
April 6, 2012 |
Notice of Affiliate Transaction between PacifiCorp and International Business Machines Corporation (“IBM”)
Exhibit A – Quote |
March 26, 2012 |
PacifiCorp’s Quarterly Report on Form 10-K for the Period Ended December 31, 2011 |
March 8, 2012 |
PacifiCorp’s Quarterly Financing Activity Report for the Period Ended September 30, 2011 |
March 8, 2012 |
Cover Letter
Certificate of Service
Exhibit A – Description of Avoided Cost Input Changes
Exhibit B – Update Impact – Updated Avoided Cost Study
Exhibit C – Step Study between Prior Filing and Current Filing |
February 29, 2012 |
Cover Letter
Certificate of Service
Service Standards Report for the period January 1, 2011 through December 31, 2011 |
February 16, 2012 |
Notice of Affiliate Transaction between PacifiCorp and Marmon/Keystone LLC
Exhibit A |
February 13, 2012 |
Notice of Affiliate Transaction between PacifiCorp and International Business Machines Corporation (IBM)
Exhibit A
Exhibit B – Purchase Order
Exhibit C – Contract |
February 7, 2012 |
Comments from DPU
Exhibit A – Historical Balance Sheets |
January 25, 2012 |
Pacificorp Declaration of Dividend |
January 23, 2012 |
Complaint from Dave Kennamer against Heber Light & Power |
January 19, 2012 |
Comments from DPU |
January 19, 2012 |
Complaint from Terrie Schultz against Heber Light & Power |
January 19, 2012 |
Complaint from John Knecht against Heber Light & Power |
January 19, 2012 |
Complaint from Kimberly Dalby against Heber Light & Power |
January 19, 2012 |
Complaint from Lisa F. Teifke against Heber Light & Power |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with Homax Oil Sales |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with Sargent & Lundy LLC |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with General Electric International (WindCONTROL |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with VMWare, Inc. |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with Alstom Power, Inc. at Naughton Units 1 & 2 |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with Pierce Oil Company |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with General Electric International (Naughton Unit 1) |
January 12, 2012 |
RMP’s Notice of Sole Source Contract Extension with Riester Mountain, LLC |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with Ground Piercing, Inc. |
January 12, 2012 |
RMP’s Notice of Sole Source Contracts with Alstom Power, Inc. at Naughton Unit One |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with Progreen Lawn & Landscape |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with Oracle Software |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with SAP America |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with MCG Energy Solutions |
January 12, 2012 |
RMP’s Notice of Sole Source Contract with General Electric International (Gadsby Plant) |
January 5, 2012 |
RMP’s Notice of Sole Source Contract with War Fab, Inc. at Bridger Coal Company |
January 3, 2012 |
Notice of Affiliate Transaction between PacifiCorp and Wells Fargo Securities, LLC
Exhibit A – Underwriting Agreement [PROPRIETARY} |
Share this: