Date |
Description |
March 26, 2020 |
Memorandum from Dead Horse Oil Company |
March 24, 2020 |
Order Denying Dead Horse Motion for PSC to Set Aside Its Order Denying Rehearing |
March 19, 2020 |
Comments from the Division of Public Utilities
Certificate of Service |
March 17, 2020 |
Dead Horse Oil Company Reply Brief to Opposition by Division |
March 17, 2020 |
Division of Public Utilities’ Response Opposing Dead Horse Oil Company’s Motion for PSC to Set Aside its Order |
March 12, 2020 |
Dead Horse Oil Company Motion for PSC to Set Aside its Order Dated March 11 2020 for Violating Rule 746-1-301 |
March 11, 2020 |
Order Denying Dead Horse Oil Company’s Motion for Rehearing |
March 6, 2020 |
Division of Public Utilities’ Response Opposing Dead Horse Oil Company’s Motion for Rehearing
DPU Attachment A – Utah Division of Public Utilities’ Statement of Facts to be Established, Legal Issues to be Resolved, and Relief Sought at Hearing
DPU Attachment B – Utah Division of Public Utilities’ Response to the November 18, 2019 Filings
DPU Attachment C – Correspondence from Spencer and Jensen
DPU Attachment D – Correspondence from Dead Horse Oil Company
DPU Attachment E – Correspondence from JMD Resources Inc.
DPU Attachment F – Email Correspondence from Spencer & Jensen
Certificate of Service |
March 6, 2020 |
Additional Correspondence from Dean Christensen with Dead Horse Oil Company |
March 5, 2020 |
Correspondence from Dean Christensen with Dead Horse Oil Company |
February 27, 2020 |
Comments from the Division of Public Utilities, Re: Paradox Pipeline Site Visit, February 12-13, 2020
DPU Attachment A – Letter from Dead Horse filed with the PSC on February 11, 2020
DPU Attachment B – Site Visit’s Narrative and Photos
DPU Attachment C – Operations and Maintenance Procedures Task Manual #1661
Certificate of Service |
February 20, 2020 |
Dead Horse Oil Company’s Motion for Rehearing |
February 11, 2020 |
Correspondence from Gary L. Widerburg, Re: Dead Horse Oil Company’s Motion to Deviate from Electronic Filing Requirement |
February 11, 2020 |
Correspondence from Dean Christensen with Dead Horse Oil Company |
February 11, 2020 |
Motion to Deviate from Electronic Filing Requirement for Dead Horse Oil Company |
January 31, 2020 |
Second Hazardous Facility Order |
December 26, 2019 |
Reporter’s Transcript, Re: December 19, 2019
Hearing Exhibit 1 – Division’s Response to Commission’s March 26, 2019 Action Request
Hearing Exhibit 3 – PEMC PHMSA Operator Registry Notification
Hearing Exhibit 6 – Status Update from the Division
Hearing Exhibit 10 – Division’s Responding Report to the June 14, 2019 Order by the Commission
Hearing Exhibit 13 – Dead Horse OPID Assignment Request
Hearing Exhibit 14 – Certificate of Service for Interim Pipeline Monitoring Program for Paradox Pipeline
Hearing Exhibit 17 – Comments from the Division
Hearing Exhibit 23 – Dead Horse Intrastate Transmission Pipeline, October 18, 2019 Site Visit
Hearing Exhibit 24 – Dead Horse Intrastate Transmission Pipeline, December 13, 2019 Site Visit |
December 19, 2019 |
Audio of Hearing Held December 19, 2019 |
December 18, 2019 |
Petition for Leave to Intervene on behalf of the Utah Board of Oil, Gas & Mining |
December 12, 2019 |
Order |
December 11, 2019 |
Division of Public Utilities’ Motion Concerning Physical Presence of Witnesses in the Hearing Room with Requested Expedited Response and Reply Schedule
Certificate of Service |
December 11, 2019 |
Division of Public Utilities’ Request that the Commission Order Certain Information and Documents to be Treated as Confidential Information under the Commission’s Rules
DPU Exhibit 1 – Cover Email for the Spencer Information
DPU Exhibit 2 – Cover Email for the Dead Horse Information
Certificate of Service |
December 11, 2019 |
Cover Letter
Dead Horse Oil Company Exhibit 1
Dead Horse Oil Company Exhibit 2
Dead Horse Oil Company Exhibit 3
Dead Horse Oil Company Exhibit 4 |
December 10, 2019 |
Utah Division of Public Utilities’ Response to the November 18, 2019 Filings
Certificate of Service |
December 10, 2019 |
Trustee’s Response to Purported Filing of Pacific Energy & Mining Company |
December 9, 2019 |
Cover Emails
Dead Horse Oil Company Exhibit 1 [CONFIDENTIAL] |
December 2, 2019 |
Cover Email
PEMC Exhibit 1 [CONFIDENTIAL]
PEMC Exhibit 2 [CONFIDENTIAL]
PEMC Exhibit 3 [CONFIDENTIAL]
PEMC Exhibit 4 [CONFIDENTIAL]
PEMC Exhibit 5 [CONFIDENTIAL]
PEMC Exhibit 6 [CONFIDENTIAL] |
November 18, 2019 |
Notice of Appointment of Bankruptcy Trustee, Ongoing Investigation, and Reservation of Rights |
November 18, 2019 |
Utah Division of Public Utilities’ Statement of Facts to be Established, Legal Issues to Resolved, and Relief Sought at Hearing
Certificate of Service |
November 18, 2019 |
Pacific Energy & Mining Co.’s (PEMC’s) Statement of Facts to be Established, Legal Issues to be Resolved, and Relief Sought at Hearing |
November 18, 2019 |
Correspondence from Dead Horse Oil Company |
October 18, 2019 |
Scheduling Order and Notice of Hearing |
October 16, 2019 |
Status and Scheduling Conference Sign-In Sheet |
October 15, 2019 |
Correspondence from Dead Horse Oil Company |
October 4, 2019 |
Correspondence from Dead Horse Oil Company |
October 4, 2019 |
Notice of Status and Scheduling Conference |
October 3, 2019 |
Correspondence from the Utah Division of Public Utilities Responding to Correspondence from JMD Resources Inc. and Correspondence from Pacific Energy & Mining Company et al.
Certificate of Service |
October 3, 2019 |
Correspondence from Spencer & Jensen, PLLC |
October 1, 2019 |
Correspondence from JMD Resources Inc. |
September 25, 2019 |
Utah Division of Public Utilities’ Response to Pacific Energy & Mining Company’s Request for Hearing
DPU Attachment 1 – Letter from Dead Horse to the Pipeline and Hazardous Materials Safety Administration
Certificate of Service |
September 16, 2019 |
Request for Hearing |
September 6, 2019 |
Comments from the Division of Public Utilities
DPU Attachment 1 – Certificate of Service for Interim Pipeline Monitoring Program for Paradox Pipeline
Certificate of Service |
August 29, 2019 |
Correspondence from Pacific Energy & Mining Company |
August 22, 2019 |
Action Request, Due: September 6, 2019 |
August 22, 2019 |
Certificate of Service for Interim Pipeline Monitoring Program for Paradox Pipeline |
August 13, 2019 |
Correspondence from Pacific Energy & Mining Company |
August 2, 2019 |
Notice of Motion and Accelerated Time to Respond |
August 1, 2019 |
Utah Division of Public Utilities’ Response to the Commission’s July 26, 2019 Notice |
August 1, 2019 |
Utah Division of Public Utilities’ Notice to the Commission of Statutory Exception to the Automatic Stay Associated with Pacific Energy & Mining Company’s Chapter 11 Bankruptcy Proceeding |
July 30, 2019 |
Suggestion of Bankruptcy |
July 30, 2019 |
Utah Division of Public Utilities’ Notice to the Commission of Pacific Energy & Mining Company’s Chapter 11 Bankruptcy Filing |
July 26, 2019 |
Notice to the Division of Public Utilities and Order Denying Motion for an Order Requiring Review of Documents |
July 10, 2019 |
Utah Division of Public Utilities’ Response to Pacific Energy & Mining Co.’s (PEMC’S) Motion for an Order Requiring the Division to Review PEMC’s Documents in Person |
July 10, 2019 |
Pacific Energy & Mining Co.’s (PEMC’S) Motion for an Order Requiring the Division of Public Utilities to Review PEMC’s Documents in Person |
July 9, 2019 |
Division of Public Utilities’ Report Responding to the PSC’s June 14, 2019 Order
DPU Exhibit 1 – May 9, 2019 Operator Registry Notification Filing from Tariq Ahmad of PEMC with PHMSA
DPU Exhibit 2 – May 30, 2019 Email from DPU’s Counsel Patricia Schmid to PEMC’s Counsel Terry Spencer, PH.D.
DPU Exhibit 3 – June 7, 2019 Email from Ms. Schmid to Mr. Spencer
DPU Exhibit 4A – June 6, 2019 Email from Ms. Schmid to Mr. Spencer
DPU Exhibit 4B – June 7, 2019 Email from Mr. Spencer to Ms. Schmid
DPU Exhibit 5 – June 14 Correspondence from Dan Green, Consultant for PEMC, to the PSC
DPU Exhibit 6A – June 10, 2019 Faxed Correspondence from Dead Horse to the DPU
DPU Exhibit 6B – June 10, 2019 Correspondence from Dead Horse to the DPU (Received by Mail)
DPU Exhibit 7A – June 12, 2019 Correspondence from Dead Horse to the DPU
DPU Exhibit 7B – June 13, 2019 Correspondence from Dead Horse to the DPU
DPU Exhibit 8A – June 13, 2019 Correspondence from PEMC to the PSC
DPU Exhibit 8B – June 13, 2019 2nd Correspondence from PEMC to the PSC
DPU Exhibit 9 – June 7, 2019 Letter from the DPU to Dead Horse
DPU Exhibit 10 – June 12, 2019 Letter from the DPU to Dead Horse
DPU Exhibit 11 – June 11, 2019 Pipeline Inspection Photos from UTPS
DPU Exhibit 12 – June 26, 2019 Pipeline Inspection Photos from UTPS
DPU Exhibit 13 – PEMC Procedures
DPU Exhibit 14 – PHMSA Advisory Bulletin ADB-2016-05
Certificate of Service |
June 17, 2019 |
Correspondence from Pacific Energy & Mining Company |
June 14, 2019 |
Notice of Hazardous Facility Order, Order to Provide Confirmation of Compliance, and Action Request to the Division of Public Utilities |
June 13, 2019 |
Second Correspondence from Pacific Energy & Mining Company |
June 13, 2019 |
Correspondence from Pacific Energy & Mining Company |
June 13, 2019 |
Miscellaneous Correspondence |
June 12, 2019 |
Correspondence from Pacific Energy & Mining Company |
June 12, 2019 |
Status Update from the Division of Public Utilities
Certificate of Service |
May 30, 2019 |
Correspondence between the Public Service Commission of Utah and Pacific Energy & Mining Company |
May 23, 2019 |
Correspondence from the Bureau of Land Management, Re: Pacific Energy and Mining Company’s Gas Venting Request |
May 17, 2019 |
Order Denying Motion to Strike |
May 16, 2019 |
Pacific Energy & Mining Co.’s (PEMC’s) Reply Brief to the Response Filed by the Division to PEMC’s Motion to Strike and Notice of Commission’s Failure to Follow the Relevant Rules |
May 10, 2019 |
Utah Division of Public Utilities’ Response to both PEMC’s Motion to Strike and its Amended Motion to Strike (also Containing Request for Rescission of Order) |
May 7, 2019 |
Affidavit of Tariq Ahmad |
May 7, 2019 |
Affidavit of Dana F. Green |
May 6, 2019 |
Amended Pacific Energy and Mining Company Motion to Strike Utah Division of Public Utilities Opposition to Pacific’s Motion to Reconsider |
May 3, 2019 |
Pacific Energy and Mining Company Motion to Strike Utah Division of Public Utilities Opposition to Pacific’s Motion to Reconsider |
May 2, 2019 |
Order on Review |
April 29, 2019 |
Utah Division of Public Utilities’ Response to PEMC’s Motion to Reconsider Order Dated April 10, 2019 |
April 12, 2019 |
Corrected Reporter’s Transcript, Re: December 18, 2018 |
April 12, 2019 |
Motion to Reconsider Order Dated April 10, 2019 |
April 10, 2019 |
Hazardous Facility Order |
April 4, 2019 |
Division’s Response to Commission’s Action Request dated March 26, 2019 |
March 26, 2019 |
Action Request, Due: A.S.A.P. |
March 25, 2019 |
Correspondence from Pacific Energy & Mining Company |
January 18, 2019 |
Order |
January 11, 2019 |
Correspondence from Pacific Energy & Mining Company to the Division of Public Utilities |
January 2, 2019 |
Miscellaneous Correspondence from Pacific Energy & Mining Company |
December 31, 2018 |
Reporter’s Transcript, Re: December 18, 2018
DPU Exhibit 1 – UTPS Post-Inspection, Letter from Chien Hwang to Dan Green 11-21-16
DPU Exhibit 2 – Emails between Chien Hwang and Dan Green 1-5-17
DPU Exhibit 3 – Emails between Dan Green and Chien Hwang 2-2-17
DPU Exhibit 4 – Email from Chien Hwang to Dan Green 2-2-17
DPU Exhibit 5 – Email from Connie Hendricks to Dan Green Re: PHMSA Annual Report 3-22-17
DPU Exhibit 6 – Email from Dan Green to Connie Hendricks 3-22-17
DPU Exhibit 7 – Warning Letter from Jimmy Betham to Dan Green 5-16-17
DPU Exhibit 8 – Letter from Dan Green to Jimmy Betham 5-25-17
DPU Exhibit 9 – Letter from Jimmy Betham to Dan Green 6-23-17
DPU Exhibit 10 – Warning Letter from Jimmy Betham to Dan Green 8-14-17
DPU Exhibit 11 – Emails from Jimmy Betham to Connie Hendricks 9-6-17
DPU Exhibit 12 – Letter from Patricia Schmid to Dan Green 1-5-18
DPU Exhibit 13 – Division of Public Utilities’ Request for Agency Action
DPU Exhibit 14 – PEMC Response to Agency Action
PEMC Exhibit 1 – Letter from Hans Schmoldt, Anode Systems Company to Dan Green 2-22-18
PEMC Exhibit 2 – Letter from Dan Green to Cinda, WC Striegel 8-30-17
PEMC Exhibit 3 – Procedural Manual for Operations, Maintenance & Emergencies |
December 18, 2018 |
Audio of Hearing held December 18, 2018 |
December 4, 2018 |
Amended Notice of Hearing |
November 30, 2018 |
Stipulated Motion to Change Hearing Date |
November 21, 2018 |
Notice of Hearing |
November 21, 2018 |
Status Report from the Utah Division of Public Utilities |
October 2, 2018 |
Reporter’s Transcript, Re: September 25, 2018 |
September 26, 2018 |
Notice of Status Report Filing |
September 25, 2018 |
Audio of Hearing held September 25, 2018 |
September 18, 2018 |
Reporter’s Transcript Re: September 12, 2018 |
September 14, 2018 |
Order Denying Motion to Remove Counsel and Acknowledgment of Discovery Related Motions’ Withdrawal |
September 12, 2018 |
Audio of Hearing held September 12, 2018 |
September 5, 2018 |
Notice of Status Conference and Hearing on Discovery Related Motions |
September 4, 2018 |
Motion to Establish PEMC’s Response Date to the Division’s First Set of Data Requests and Request for Expedited Consideration |
September 4, 2018 |
Utah Division of Public Utilities’ Response to PEMC’s Motion for Formal Discovery |
August 29, 2018 |
Notice that Motion to Request Reconsideration is Deemed Denied, Order Denying Motions to Stay and Invitation to Propose Alternative Hearing Date |
August 27, 2018 |
Pacific Energy & Mining Company’s Motion for Formal Discovery
Attachment A – Pacific Energy & Mining Company’s Draft Order for Formal Discovery |
August 20, 2018 |
Utah Division of Public Utilities’ Response to PEMC’s Motion to Remove Counsel for Division Request for Sanctions |
August 20, 2018 |
Utah Division of Public Utilities’ Response to PEMC’s August 10, 2018 Motions to Request Reconsideration of Commission Order Dated August 9, 2018 [AND] Request for Hearing; Motion to Extend Time to File Reply Brief; Reply to Division’s Response Dated June 20, 2018; Reply to Division’s Response Dated June 20, 2018 – Supplemental Brief; and Motion to Stay Proceedings |
August 20, 2018 |
Notice of Appearance of Terry R. Spencer for Pacific Energy & Mining Company |
August 20, 2018 |
Protective Order |
August 17, 2018 |
Pacific Energy & Mining Company’s Motion to Remove Counsel for Division Request for Sanctions |
August 17, 2018 |
Utah Division of Public Utilities’ Motion for a Protective Order Regarding Corrected Notices of Deposition Filed by Pacific Energy & Mining Company, and Request for Shortened Response Time and Expedited Treatment |
August 10, 2018 |
Pacific Energy & Mining Company’s Reply to Division’s Response Dated June 20, 2018- Supplemental Brief |
August 10, 2018 |
Notice of Deposition of Jimmy Betham |
August 10, 2018 |
Corrected Notice of Deposition of Jimmy Betham |
August 10, 2018 |
Corrected Notice of Deposition of Al Zadeh |
August 10, 2018 |
Notice of Deposition of Jimmy Betham |
August 10, 2018 |
Notice of Deposition of Al Zadeh |
August 10, 2018 |
Pacific Energy & Mining Company’s Reply to Division’s Response Dated June 20, 2018 |
August 10, 2018 |
Pacific Energy & Mining Company’s Motion to Extend Time to File Reply Brief |
August 10, 2018 |
Pacific Energy & Mining Company’s Motion to Stay Proceedings |
August 10, 2018 |
Pacific Energy & Mining Company’s Motion to Request Reconsideration of Commission Order Dated August 9, 2018; Request for Hearing |
August 10, 2018 |
Pacific Energy & Mining Company’s Motion to Stay Proceedings |
August 9, 2018 |
Order Denying PEMC’s Motion to Dismiss for Lack of Jurisdiction, and Notice of Hearing |
June 25, 2018 |
Second Amended Scheduling Order Cancelling Hearing Date and Extending Discovery Cut-Off Date |
June 25, 2018 |
Erratum Notice |
June 22, 2018 |
Correspondence from Melanie Reif, PSC to Parties |
June 22, 2018 |
Correspondence from Patricia Schmid for the Division of Public Utilities |
June 22, 2018 |
Request of Pacific Energy & Mining Company to Reschedule July 19, 2018 Hearing |
June 22, 2018 |
Order Staying Decision on PEMC’s Request for Extension, and Requesting Responses from Parties Concerning the July 19, 2018 Hearing Date |
June 20, 2018 |
Division of Public Utilities’ Response to PEMC’s Request to Deny Agency Action Due to Lack of Jurisdiction and Supplemental Brief
DPU Exhibit 1 – PEMC Gas Gathering and Transmission System
DPU Exhibit 2 – PEMC Regulated Pipeline
DPU Exhibit 3 – Email dated August 30, 2013 from Mobashir Ahmad to Jimmy Betham
DPU Exhibit 4 – Emails dated September 16, 17, and 23, 2013
DPU Exhibit 5 – Emails dated September 3, 16, 17, 23, and October 9, 2013
DPU Exhibit 6 – Letter dated April 8, 2014 from Jimmy Betham to Dan Green
DPU Exhibit 7 – Emails dated October 8, November 1, 19, 2013, and January 7, 2014
DPU Exhibit 8 – Email dated September 23, 2013 from Jimmy Betham to Mobashir Ahmad
DPU Exhibit 9 – Email dated September 23, 2013 from Jimmy Betham to Mobashir Ahmad and email dated September 23, 2013 from Al Zadeh to Jamerson Pender with PHMSA
DPU Exhibit 10 – OPID Assignment Request dated September 3, 2013
DPU Exhibit 11 – Email dated October 9, 2013 from Jason Dunphy with PHMSA
DPU Exhibit 12 – Article Re: Pipeline Operator Could Face up to $1 Million in Fines |
June 6, 2018 |
Pacific Energy & Mining Company Supplemental Brief in Support of Lack of Jurisdiction |
June 5, 2018 |
Pacific Energy & Mining Company’s Request to Deny Agency Action Due to Lack of Jurisdiction |
May 25, 2018 |
Correspondence between the Public Service Commission’s Presiding Officer and Parties |
May 25, 2018 |
Pacific Energy & Mining Company’s Request for Extension of Time |
May 24, 2018 |
Utah Division of Public Utilities’ Final Reply to Pacific Energy Mining Company’s Response |
May 15, 2018 |
Pacific Energy and Mining Company’s Response to Agency Action against Pacific Energy and Mining Company |
May 11, 2018 |
Amended Scheduling Order |
May 11, 2018 |
Division of Public Utilities’ and Pacific Energy and Mining Company’s (PEMC) Request to Extend PEMC’s Response Time to May 15, 2018 |
April 16, 2018 |
Scheduling Order and Notice of Hearing |
April 12, 2018 |
Utah Division of Public Utilities’ Request for Agency Action on Notice of Probable Violation, Proposed Civil Penalty, and Proposed Compliance Order Against Pacific Energy & Mining Company |
Share this: