Docket No: 18-2602-01

Pacific Energy & Mining Company (PEMC)

For questions regarding documents not linked call 801-530-6716

Date Description
March 26, 2020 Memorandum from Dead Horse Oil Company
March 24, 2020 Order Denying Dead Horse Motion for PSC to Set Aside Its Order Denying Rehearing
March 19, 2020 Comments from the Division of Public Utilities
Certificate of Service
March 17, 2020 Dead Horse Oil Company Reply Brief to Opposition by Division
March 17, 2020 Division of Public Utilities’ Response Opposing Dead Horse Oil Company’s Motion for PSC to Set Aside its Order
March 12, 2020 Dead Horse Oil Company Motion for PSC to Set Aside its Order Dated March 11 2020 for Violating Rule 746-1-301
March 11, 2020 Order Denying Dead Horse Oil Company’s Motion for Rehearing
March 6, 2020 Division of Public Utilities’ Response Opposing Dead Horse Oil Company’s Motion for Rehearing
DPU Attachment A – Utah Division of Public Utilities’ Statement of Facts to be Established, Legal Issues to be Resolved, and Relief Sought at Hearing
DPU Attachment B – Utah Division of Public Utilities’ Response to the November 18, 2019 Filings
DPU Attachment C – Correspondence from Spencer and Jensen
DPU Attachment D – Correspondence from Dead Horse Oil Company
DPU Attachment E – Correspondence from JMD Resources Inc.
DPU Attachment F – Email Correspondence from Spencer & Jensen
Certificate of Service
March 6, 2020 Additional Correspondence from Dean Christensen with Dead Horse Oil Company
March 5, 2020 Correspondence from Dean Christensen with Dead Horse Oil Company
February 27, 2020 Comments from the Division of Public Utilities, Re: Paradox Pipeline Site Visit, February 12-13, 2020
DPU Attachment A – Letter from Dead Horse filed with the PSC on February 11, 2020
DPU Attachment B – Site Visit’s Narrative and Photos
DPU Attachment C – Operations and Maintenance Procedures Task Manual #1661
Certificate of Service
February 20, 2020 Dead Horse Oil Company’s Motion for Rehearing
February 11, 2020 Correspondence from Gary L. Widerburg, Re: Dead Horse Oil Company’s Motion to Deviate from Electronic Filing Requirement
February 11, 2020 Correspondence from Dean Christensen with Dead Horse Oil Company
February 11, 2020 Motion to Deviate from Electronic Filing Requirement for Dead Horse Oil Company
January 31, 2020 Second Hazardous Facility Order
December 26, 2019 Reporter’s Transcript, Re: December 19, 2019
Hearing Exhibit 1 – Division’s Response to Commission’s March 26, 2019 Action Request
Hearing Exhibit 3 – PEMC PHMSA Operator Registry Notification
Hearing Exhibit 6 – Status Update from the Division
Hearing Exhibit 10 – Division’s Responding Report to the June 14, 2019 Order by the Commission
Hearing Exhibit 13 – Dead Horse OPID Assignment Request
Hearing Exhibit 14 – Certificate of Service for Interim Pipeline Monitoring Program for Paradox Pipeline
Hearing Exhibit 17 – Comments from the Division
Hearing Exhibit 23 – Dead Horse Intrastate Transmission Pipeline, October 18, 2019 Site Visit
Hearing Exhibit 24 – Dead Horse Intrastate Transmission Pipeline, December 13, 2019 Site Visit
December 19, 2019 Audio of Hearing Held December 19, 2019
December 18, 2019 Petition for Leave to Intervene on behalf of the Utah Board of Oil, Gas & Mining
December 12, 2019 Order
December 11, 2019 Division of Public Utilities’ Motion Concerning Physical Presence of Witnesses in the Hearing Room with Requested Expedited Response and Reply Schedule
Certificate of Service
December 11, 2019 Division of Public Utilities’ Request that the Commission Order Certain Information and Documents to be Treated as Confidential Information under the Commission’s Rules
DPU Exhibit 1 – Cover Email for the Spencer Information
DPU Exhibit 2 – Cover Email for the Dead Horse Information
Certificate of Service
December 11, 2019 Cover Letter
Dead Horse Oil Company Exhibit 1
Dead Horse Oil Company Exhibit 2
Dead Horse Oil Company Exhibit 3
Dead Horse Oil Company Exhibit 4
December 10, 2019 Utah Division of Public Utilities’ Response to the November 18, 2019 Filings
Certificate of Service
December 10, 2019 Trustee’s Response to Purported Filing of Pacific Energy & Mining Company
December 9, 2019 Cover Emails
Dead Horse Oil Company Exhibit 1 [CONFIDENTIAL]
December 2, 2019 Cover Email
PEMC Exhibit 1 [CONFIDENTIAL]
PEMC Exhibit 2 [CONFIDENTIAL]
PEMC Exhibit 3 [CONFIDENTIAL]
PEMC Exhibit 4 [CONFIDENTIAL]
PEMC Exhibit 5 [CONFIDENTIAL]
PEMC Exhibit 6 [CONFIDENTIAL]
November 18, 2019 Notice of Appointment of Bankruptcy Trustee, Ongoing Investigation, and Reservation of Rights
November 18, 2019 Utah Division of Public Utilities’ Statement of Facts to be Established, Legal Issues to Resolved, and Relief Sought at Hearing
Certificate of Service
November 18, 2019 Pacific Energy & Mining Co.’s (PEMC’s) Statement of Facts to be Established, Legal Issues to be Resolved, and Relief Sought at Hearing
November 18, 2019 Correspondence from Dead Horse Oil Company
October 18, 2019 Scheduling Order and Notice of Hearing
October 16, 2019 Status and Scheduling Conference Sign-In Sheet
October 15, 2019 Correspondence from Dead Horse Oil Company
October 4, 2019 Correspondence from Dead Horse Oil Company
October 4, 2019 Notice of Status and Scheduling Conference
October 3, 2019 Correspondence from the Utah Division of Public Utilities Responding to Correspondence from JMD Resources Inc. and Correspondence from Pacific Energy & Mining Company et al.
Certificate of Service
October 3, 2019 Correspondence from Spencer & Jensen, PLLC
October 1, 2019 Correspondence from JMD Resources Inc.
September 25, 2019 Utah Division of Public Utilities’ Response to Pacific Energy & Mining Company’s Request for Hearing
DPU Attachment 1 – Letter from Dead Horse to the Pipeline and Hazardous Materials Safety Administration
Certificate of Service
September 16, 2019 Request for Hearing
September 6, 2019 Comments from the Division of Public Utilities
DPU Attachment 1 – Certificate of Service for Interim Pipeline Monitoring Program for Paradox Pipeline
Certificate of Service
August 29, 2019 Correspondence from Pacific Energy & Mining Company
August 22, 2019 Action Request, Due: September 6, 2019
August 22, 2019 Certificate of Service for Interim Pipeline Monitoring Program for Paradox Pipeline
August 13, 2019 Correspondence from Pacific Energy & Mining Company
August 2, 2019 Notice of Motion and Accelerated Time to Respond
August 1, 2019 Utah Division of Public Utilities’ Response to the Commission’s July 26, 2019 Notice
August 1, 2019 Utah Division of Public Utilities’ Notice to the Commission of Statutory Exception to the Automatic Stay Associated with Pacific Energy & Mining Company’s Chapter 11 Bankruptcy Proceeding
July 30, 2019 Suggestion of Bankruptcy
July 30, 2019 Utah Division of Public Utilities’ Notice to the Commission of Pacific Energy & Mining Company’s Chapter 11 Bankruptcy Filing
July 26, 2019 Notice to the Division of Public Utilities and Order Denying Motion for an Order Requiring Review of Documents
July 10, 2019 Utah Division of Public Utilities’ Response to Pacific Energy & Mining Co.’s (PEMC’S) Motion for an Order Requiring the Division to Review PEMC’s Documents in Person
July 10, 2019 Pacific Energy & Mining Co.’s (PEMC’S) Motion for an Order Requiring the Division of Public Utilities to Review PEMC’s Documents in Person
July 9, 2019 Division of Public Utilities’ Report Responding to the PSC’s June 14, 2019 Order
DPU Exhibit 1 – May 9, 2019 Operator Registry Notification Filing from Tariq Ahmad of PEMC with PHMSA
DPU Exhibit 2 – May 30, 2019 Email from DPU’s Counsel Patricia Schmid to PEMC’s Counsel Terry Spencer, PH.D.
DPU Exhibit 3 – June 7, 2019 Email from Ms. Schmid to Mr. Spencer
DPU Exhibit 4A – June 6, 2019 Email from Ms. Schmid to Mr. Spencer
DPU Exhibit 4B – June 7, 2019 Email from Mr. Spencer to Ms. Schmid
DPU Exhibit 5 – June 14 Correspondence from Dan Green, Consultant for PEMC, to the PSC
DPU Exhibit 6A – June 10, 2019 Faxed Correspondence from Dead Horse to the DPU
DPU Exhibit 6B – June 10, 2019 Correspondence from Dead Horse to the DPU (Received by Mail)
DPU Exhibit 7A – June 12, 2019 Correspondence from Dead Horse to the DPU
DPU Exhibit 7B – June 13, 2019 Correspondence from Dead Horse to the DPU
DPU Exhibit 8A – June 13, 2019 Correspondence from PEMC to the PSC
DPU Exhibit 8B – June 13, 2019 2nd Correspondence from PEMC to the PSC
DPU Exhibit 9 – June 7, 2019 Letter from the DPU to Dead Horse
DPU Exhibit 10 – June 12, 2019 Letter from the DPU to Dead Horse
DPU Exhibit 11 – June 11, 2019 Pipeline Inspection Photos from UTPS
DPU Exhibit 12 – June 26, 2019 Pipeline Inspection Photos from UTPS
DPU Exhibit 13 – PEMC Procedures
DPU Exhibit 14 – PHMSA Advisory Bulletin ADB-2016-05
Certificate of Service
June 17, 2019 Correspondence from Pacific Energy & Mining Company
June 14, 2019 Notice of Hazardous Facility Order, Order to Provide Confirmation of Compliance, and Action Request to the Division of Public Utilities
June 13, 2019 Second Correspondence from Pacific Energy & Mining Company
June 13, 2019 Correspondence from Pacific Energy & Mining Company
June 13, 2019 Miscellaneous Correspondence
June 12, 2019 Correspondence from Pacific Energy & Mining Company
June 12, 2019 Status Update from the Division of Public Utilities
Certificate of Service
May 30, 2019 Correspondence between the Public Service Commission of Utah and Pacific Energy & Mining Company
May 23, 2019 Correspondence from the Bureau of Land Management, Re: Pacific Energy and Mining Company’s Gas Venting Request
May 17, 2019 Order Denying Motion to Strike
May 16, 2019 Pacific Energy & Mining Co.’s (PEMC’s) Reply Brief to the Response Filed by the Division to PEMC’s Motion to Strike and Notice of Commission’s Failure to Follow the Relevant Rules
May 10, 2019 Utah Division of Public Utilities’ Response to both PEMC’s Motion to Strike and its Amended Motion to Strike (also Containing Request for Rescission of Order)
May 7, 2019 Affidavit of Tariq Ahmad
May 7, 2019 Affidavit of Dana F. Green
May 6, 2019 Amended Pacific Energy and Mining Company Motion to Strike Utah Division of Public Utilities Opposition to Pacific’s Motion to Reconsider
May 3, 2019 Pacific Energy and Mining Company Motion to Strike Utah Division of Public Utilities Opposition to Pacific’s Motion to Reconsider
May 2, 2019 Order on Review
April 29, 2019 Utah Division of Public Utilities’ Response to PEMC’s Motion to Reconsider Order Dated April 10, 2019
April 12, 2019 Corrected Reporter’s Transcript, Re: December 18, 2018
April 12, 2019 Motion to Reconsider Order Dated April 10, 2019
April 10, 2019 Hazardous Facility Order
April 4, 2019 Division’s Response to Commission’s Action Request dated March 26, 2019
March 26, 2019 Action Request, Due: A.S.A.P.
March 25, 2019 Correspondence from Pacific Energy & Mining Company
January 18, 2019 Order
January 11, 2019 Correspondence from Pacific Energy & Mining Company to the Division of Public Utilities
January 2, 2019 Miscellaneous Correspondence from Pacific Energy & Mining Company
December 31, 2018 Reporter’s Transcript, Re: December 18, 2018
DPU Exhibit 1 – UTPS Post-Inspection, Letter from Chien Hwang to Dan Green 11-21-16
DPU Exhibit 2 – Emails between Chien Hwang and Dan Green 1-5-17
DPU Exhibit 3 – Emails between Dan Green and Chien Hwang 2-2-17
DPU Exhibit 4 – Email from Chien Hwang to Dan Green 2-2-17
DPU Exhibit 5 – Email from Connie Hendricks to Dan Green Re: PHMSA Annual Report 3-22-17
DPU Exhibit 6 – Email from Dan Green to Connie Hendricks 3-22-17
DPU Exhibit 7 – Warning Letter from Jimmy Betham to Dan Green 5-16-17
DPU Exhibit 8 – Letter from Dan Green to Jimmy Betham 5-25-17
DPU Exhibit 9 – Letter from Jimmy Betham to Dan Green 6-23-17
DPU Exhibit 10 – Warning Letter from Jimmy Betham to Dan Green 8-14-17
DPU Exhibit 11 – Emails from Jimmy Betham to Connie Hendricks 9-6-17
DPU Exhibit 12 – Letter from Patricia Schmid to Dan Green 1-5-18
DPU Exhibit 13 – Division of Public Utilities’ Request for Agency Action
DPU Exhibit 14 – PEMC Response to Agency Action
PEMC Exhibit 1 – Letter from Hans Schmoldt, Anode Systems Company to Dan Green 2-22-18
PEMC Exhibit 2 – Letter from Dan Green to Cinda, WC Striegel 8-30-17
PEMC Exhibit 3 – Procedural Manual for Operations, Maintenance & Emergencies
December 18, 2018 Audio of Hearing held December 18, 2018
December 4, 2018 Amended Notice of Hearing
November 30, 2018 Stipulated Motion to Change Hearing Date
November 21, 2018 Notice of Hearing
November 21, 2018 Status Report from the Utah Division of Public Utilities
October 2, 2018 Reporter’s Transcript, Re: September 25, 2018
September 26, 2018 Notice of Status Report Filing
September 25, 2018 Audio of Hearing held September 25, 2018
September 18, 2018 Reporter’s Transcript Re: September 12, 2018
September 14, 2018 Order Denying Motion to Remove Counsel and Acknowledgment of Discovery Related Motions’ Withdrawal
September 12, 2018 Audio of Hearing held September 12, 2018
September 5, 2018 Notice of Status Conference and Hearing on Discovery Related Motions
September 4, 2018 Motion to Establish PEMC’s Response Date to the Division’s First Set of Data Requests and Request for Expedited Consideration
September 4, 2018 Utah Division of Public Utilities’ Response to PEMC’s Motion for Formal Discovery
August 29, 2018 Notice that Motion to Request Reconsideration is Deemed Denied, Order Denying Motions to Stay and Invitation to Propose Alternative Hearing Date
August 27, 2018 Pacific Energy & Mining Company’s Motion for Formal Discovery
Attachment A – Pacific Energy & Mining Company’s Draft Order for Formal Discovery
August 20, 2018 Utah Division of Public Utilities’ Response to PEMC’s Motion to Remove Counsel for Division Request for Sanctions
August 20, 2018 Utah Division of Public Utilities’ Response to PEMC’s August 10, 2018 Motions to Request Reconsideration of Commission Order Dated August 9, 2018 [AND] Request for Hearing; Motion to Extend Time to File Reply Brief; Reply to Division’s Response Dated June 20, 2018; Reply to Division’s Response Dated June 20, 2018 – Supplemental Brief; and Motion to Stay Proceedings
August 20, 2018 Notice of Appearance of Terry R. Spencer for Pacific Energy & Mining Company
August 20, 2018 Protective Order
August 17, 2018 Pacific Energy & Mining Company’s Motion to Remove Counsel for Division Request for Sanctions
August 17, 2018 Utah Division of Public Utilities’ Motion for a Protective Order Regarding Corrected Notices of Deposition Filed by Pacific Energy & Mining Company, and Request for Shortened Response Time and Expedited Treatment
August 10, 2018 Pacific Energy & Mining Company’s Reply to Division’s Response Dated June 20, 2018- Supplemental Brief
August 10, 2018 Notice of Deposition of Jimmy Betham
August 10, 2018 Corrected Notice of Deposition of Jimmy Betham
August 10, 2018 Corrected Notice of Deposition of Al Zadeh
August 10, 2018 Notice of Deposition of Jimmy Betham
August 10, 2018 Notice of Deposition of Al Zadeh
August 10, 2018 Pacific Energy & Mining Company’s Reply to Division’s Response Dated June 20, 2018
August 10, 2018 Pacific Energy & Mining Company’s Motion to Extend Time to File Reply Brief
August 10, 2018 Pacific Energy & Mining Company’s Motion to Stay Proceedings
August 10, 2018 Pacific Energy & Mining Company’s Motion to Request Reconsideration of Commission Order Dated August 9, 2018; Request for Hearing
August 10, 2018 Pacific Energy & Mining Company’s Motion to Stay Proceedings
August 9, 2018 Order Denying PEMC’s Motion to Dismiss for Lack of Jurisdiction, and Notice of Hearing
June 25, 2018 Second Amended Scheduling Order Cancelling Hearing Date and Extending Discovery Cut-Off Date
June 25, 2018 Erratum Notice
June 22, 2018 Correspondence from Melanie Reif, PSC to Parties
June 22, 2018 Correspondence from Patricia Schmid for the Division of Public Utilities
June 22, 2018 Request of Pacific Energy & Mining Company to Reschedule July 19, 2018 Hearing
June 22, 2018 Order Staying Decision on PEMC’s Request for Extension, and Requesting Responses from Parties Concerning the July 19, 2018 Hearing Date
June 20, 2018 Division of Public Utilities’ Response to PEMC’s Request to Deny Agency Action Due to Lack of Jurisdiction and Supplemental Brief
DPU Exhibit 1 – PEMC Gas Gathering and Transmission System
DPU Exhibit 2 – PEMC Regulated Pipeline
DPU Exhibit 3 – Email dated August 30, 2013 from Mobashir Ahmad to Jimmy Betham
DPU Exhibit 4 – Emails dated September 16, 17, and 23, 2013
DPU Exhibit 5 – Emails dated September 3, 16, 17, 23, and October 9, 2013
DPU Exhibit 6 – Letter dated April 8, 2014 from Jimmy Betham to Dan Green
DPU Exhibit 7 – Emails dated October 8, November 1, 19, 2013, and January 7, 2014
DPU Exhibit 8 – Email dated September 23, 2013 from Jimmy Betham to Mobashir Ahmad
DPU Exhibit 9 – Email dated September 23, 2013 from Jimmy Betham to Mobashir Ahmad and email dated September 23, 2013 from Al Zadeh to Jamerson Pender with PHMSA
DPU Exhibit 10 – OPID Assignment Request dated September 3, 2013
DPU Exhibit 11 – Email dated October 9, 2013 from Jason Dunphy with PHMSA
DPU Exhibit 12 – Article Re: Pipeline Operator Could Face up to $1 Million in Fines
June 6, 2018 Pacific Energy & Mining Company Supplemental Brief in Support of Lack of Jurisdiction
June 5, 2018 Pacific Energy & Mining Company’s Request to Deny Agency Action Due to Lack of Jurisdiction
May 25, 2018 Correspondence between the Public Service Commission’s Presiding Officer and Parties
May 25, 2018 Pacific Energy & Mining Company’s Request for Extension of Time
May 24, 2018 Utah Division of Public Utilities’ Final Reply to Pacific Energy Mining Company’s Response
May 15, 2018 Pacific Energy and Mining Company’s Response to Agency Action against Pacific Energy and Mining Company
May 11, 2018 Amended Scheduling Order
May 11, 2018 Division of Public Utilities’ and Pacific Energy and Mining Company’s (PEMC) Request to Extend PEMC’s Response Time to May 15, 2018
April 16, 2018 Scheduling Order and Notice of Hearing
April 12, 2018 Utah Division of Public Utilities’ Request for Agency Action on Notice of Probable Violation, Proposed Civil Penalty, and Proposed Compliance Order Against Pacific Energy & Mining Company

Share this: