Date |
Description |
April 28, 2022 |
Cover Letter
Rocky Mountain Power’s December 31, 2021 Variance Report |
November 19, 2021 |
Public Comments from November 19, 2021 |
March 2, 2021 |
Office of Consumer Services’ Reply Comments |
March 2, 2021 |
Utah Clean Energy’s Reply Comments on Collaborative Stakeholder Process |
March 2, 2021 |
Division of Public Utilities’ Reply Comments |
March 2, 2021 |
Reply Comments of the Utah Association of Energy Users on Collaborative Stakeholder Process |
March 2, 2021 |
Reply Comments of Western Resource Advocates on Collaborative Stakeholder Process
Certificate of Service |
March 2, 2021 |
Rocky Mountain Power’s Reply Comments on Collaborative Stakeholder Process |
February 26, 2021 |
Order on Petitions for Review, Reconsideration, or Rehearing |
February 16, 2021 |
Rocky Mountain Power’s Response in Opposition to Petitions for Reconsideration, Review, or Rehearing
RMP Appendix A – UT GRC Pricing Rehearing Workpaper |
February 16, 2021 |
Comments from the Office of Consumer Services
Certificate of Service |
February 16, 2021 |
Utah Clean Energy’s Comments on Collaborative Stakeholder Process |
February 16, 2021 |
Rocky Mountain Power’s Comments on Collaborative Stakeholder Process |
February 16, 2021 |
Comments from the Division of Public Utilities |
February 16, 2021 |
Initial Comments of Western Resource Advocates on Collaborative Stakeholder Process
WRA Attachment 1 – DOE AMI Report
Certificate of Service |
February 16, 2021 |
Comments of the Kroger Co.
Certificate of Service |
January 29, 2021 |
Office of Consumer Services’ Joinder of First Issue in Petition of Utah Association of Energy Users and University of Utah for Reconsideration and Rehearing of Commission Order Issued December 30, 2020
Certificate of Service |
January 29, 2021 |
Office of Consumer Services’ Petition for Reconsideration and Rehearing
Certificate of Service |
January 29, 2021 |
Division of Public Utilities’ Petition for Review or Rehearing |
January 29, 2021 |
Petition of the Utah Association of Energy Users and the University of Utah for Review or Rehearing of Commission Order Issued December 30, 2020
UAE Petition for Review Exhibits |
January 11, 2021 |
Public Comments from January 11, 2021 |
December 30, 2020 |
Redacted Order
Order [CONFIDENTIAL] |
December 28, 2020 |
Public Comments from December 28, 2020 |
December 21, 2020 |
Reporter’s Transcript, Re: December 4, 2020 |
December 4, 2020 |
Recorded Live Stream of Hearing on Closing Arguments Held on December 4, 2020 |
December 1, 2020 |
Appendix A, Re: Gary A. Dodge for the Utah Association of Energy Users |
November 30, 2020 |
Public Comments from November 30, 2020 |
November 30, 2020 |
Rocky Mountain Power’s Post-Hearing Brief (Addressing Cost of Capital, Revenue Requirement, and Cost of Service/Pricing Phases) |
November 30, 2020 |
Post Hearing Brief of the Utah Division of Public Utilities
Certificate of Service |
November 30, 2020 |
Post-Hearing Brief of the University of Utah |
November 30, 2020 |
Post-Hearing Brief of the Utah Association of Energy Users |
November 30, 2020 |
Brief on Issues from Phase II – Cost of Service on behalf of Utah Clean Energy
Certificate of Service |
November 30, 2020 |
Post-Hearing Brief of Stadion LLC |
November 30, 2020 |
Office of Consumer Services’ Post Hearing Brief
Certificate of Service |
November 30, 2020 |
Brief on Phase II of the Kroger Co.
Certificate of Service |
November 30, 2020 |
Brief on Phase II of ChargePoint, Inc. |
November 27, 2020 |
Public Comments from November 27, 2020 |
November 24, 2020 |
Public Comments from November 24, 2020 |
November 23, 2020 |
Public Comments from November 23, 2020 |
November 23, 2020 |
Affidavit of ChargePoint, Inc.’s Witness Anne T. Smart |
November 20, 2020 |
Public Comments from November 20, 2020 |
November 20, 2020 |
Clarification to November 12, 2020 Amended Scheduling Order |
November 19, 2020 |
Public Comments from November 19, 2020 |
November 19, 2020 |
Reporter’s Transcript, Re: November 17, 2020
Reporter’s Transcript, Re: November 18, 2020 |
November 18, 2020 |
Public Comments from November 18, 2020 |
November 18, 2020 |
Recorded Live Stream of Hearing on Phase II – Cost of Service/Pricing Held on November 18, 2020 |
November 17, 2020 |
Public Comments from November 17, 2020 |
November 17, 2020 |
Recorded Live Stream of Hearing on Phase II – Cost of Service/Pricing Held on November 17, 2020 |
November 17, 2020 |
Rocky Mountain Power’s Request for Clarification, Re: Amended Scheduling Order and Notice of Electronic Hearing |
November 17, 2020 |
Cover Email
Corrected Phase II Direct Testimony of Richard A. Baudino on behalf of the Kroger Co.
Certificate of Service |
November 16, 2020 |
Public Comments from November 16, 2020 |
November 16, 2020 |
Redacted Reporter’s Transcript, Re: November 3, 2020
Reporter’s Transcript, Re: November 3, 2020 [CONFIDENTIAL]
Reporter’s Transcript, Re: Public Comment Hearing from November 3, 2020
Redacted Reporter’s Transcript, Re: November 4, 2020
Reporter’s Transcript, Re: November 4, 2020 [CONFIDENTIAL]
Redacted Reporter’s Transcript, Re; November 5, 2020
Reporter’s Transcript, Re: November 5, 2020 [CONFIDENTIAL]
Redacted Reporter’s Transcript, Re: November 6, 2020
Reporter’s Transcript, Re: November 6, 2020 [CONFIDENTIAL] |
November 13, 2020 |
Public Comments from November 13, 2020 |
November 13, 2020 |
Rocky Mountain Power’s Motion and Consent of Sponsoring Local Counsel for Pro Hac Vice Admission of Ajay K. Kumar |
November 12, 2020 |
Public Comments from November 12, 2020 |
November 12, 2020 |
Rocky Mountain Power’s Errata Filing
RMP Exhibit RMM-7R – Lighting Class Cost Study (Excel)
RMP Exhibit RMM-1SR – Billing Determinants and Proposed Prices (Excel) |
November 12, 2020 |
Motion of Western Resource Advocates to Deviate from Utah Admin. Code R746-1-401 and File an Exhibit Outside the Timeframe Established in the Scheduling Order
WRA Exhibit DJH-2 – Rocky Mountain Power’s Response to Data Request 3.5
Certificate of Service |
November 12, 2020 |
Amended Scheduling Order and Notice of Electronic Hearing |
November 10, 2020 |
Public Comments from November 10, 2020 |
November 10, 2020 |
Reporter’s Transcript, Re: October 29, 2020
Reporter’s Transcript, Re: October 30, 2020
Exhibit 1 DPU Cross – RRA Regulatory Focus Major Rate Case Decisions January – September 2020
Exhibit 2.0 DIR SR – Surrebuttal Testimony of Casey J. Coleman
Exhibit 2.0 DPU Direct – Direct Testimony of Casey J. Coleman
Exhibit 1 OCS Cross – Woolridge Surrebuttal for OCS, Page 11
Exhibit 1 OCS Direct – Direct Testimony of J. Randall Woolridge
Exhibit 2 OCS Cross – RRA – Average Utility Equity Ratio Declines in 2020 Amid COVID-19 Pandemic
Exhibit 2 OCS Direct – Surrebuttal Testimony of J. Randall Woolridge
Exhibit 4 OCS Cross – RRA Regulatory Focus “Water Utility ROE Average Declines Steeper than Electric and Gas Utilities”
Exhibit 5A OCS Cross – Footnote 17 Partial – Woolridge Surrebuttal – McKinsey on Finance Issue 35, Spring 2010, “Equity Analysts: Still too Bullish”
Exhibit 5B OCS Cross – Footnote 17 Full – Woolridge Surrebuttal – McKinsey on Finance Issue 35, Spring 2010
Exhibit 1 RMP Cross – Green Mountain Power Decision
Exhibit 1 RMP Direct – Direct Testimony of Gary Hoogeveen
Exhibit 1 RMP Redirect – RRA Regulatory Focus “Rankings of 6 States Revised as Regulatory Risk for Energy Utilities Assessed” Dated March 26, 2020
Exhibit 2 RMP Cross – 2020 Authorized ROEs, Coleman’s Response
Exhibit 2 RMP Direct – Direct Testimony of Nikki Kobliha
Exhibit 2 RMP Redirect – Federal Funds Target Rate, Upper Limit %
Exhibit 3 RMP Cross – Woolridge Gas & Electric Cases 2012 – 2020
Exhibit 3 RMP Direct – Direct Testimony of Ann Bulkley
Exhibit 3 RMP Redirect – Treasury Bond Yield 30 Years
Exhibit 4 RMP Cross – Delmarva’s Application, Woolridge Testimony & Exhibits, February 21, 2020
Exhibit 5 RMP Cross – Woolridge Average Recommended ROE Compared to Commission Authorized ROE 2012 – 2020
Exhibit 7 RMP Cross – S&P Utilities vs. S&P 500
Exhibit 8 RMP Cross – Woolridge Recommended ROE as Compared to Federal Funds Rate
Exhibit 1 Walmart Direct – Direct Testimony of Steve Chriss |
November 9, 2020 |
Public Comments from November 9, 2020 |
November 9, 2020 |
Office of Consumer Services’ Objection to Rocky Mountain Power’s Proposal for Limited Briefing and Oral Argument and Alternative Proposal
Certificate of Service |
November 6, 2020 |
Public Comments from November 6, 2020 |
November 6, 2020 |
Phase II Cost of Service Surrebuttal Testimony of Sarah Wright on behalf of Utah Clean Energy
Certificate of Service |
November 6, 2020 |
Phase II Cost of Service / Pricing Surrebuttal Testimony of Christopher Thomas on behalf of Salt Lake City Corporation |
November 6, 2020 |
Cover Letter
Phase II Cost of Service / Pricing Surrebuttal Testimony of Curtis B. Mansfield for Rocky Mountain Power |
November 6, 2020 |
Cover Letter
Phase II Cost of Service / Pricing Surrebuttal Testimony of Robert M. Meredith for Rocky Mountain Power
RMP Meredith Workpapers 1 – Figure 1 RES Usage vs. CP LF
RMP Meredith Workpapers 2 – SL Energy
RMP Meredith Workpapers 3 – UT Pricing Model GRC 2020 Surrebuttal |
November 6, 2020 |
Phase II Surrebuttal Testimony of Aaron J. Kressig on behalf of Western Resource Advocates |
November 6, 2020 |
Phase II Surrebuttal Testimony of Douglas J. Howe on behalf of Western Resource Advocates
WRA Exhibit DJH-1(SRT) – WRA Data Request Set 10 and OCS Data Request Set 18 |
November 6, 2020 |
Phase II Surrebuttal Testimony of Christopher F. Benson on behalf of the University of Utah
U of U Exhibit RD 2.1 – Schedule No. 32 Order |
November 6, 2020 |
Phase II Surrebuttal Testimony of Justin Bieber on behalf of the Utah Association of Energy Users |
November 6, 2020 |
Phase II Surrebuttal Testimony of Richard A. Baudino on behalf of the Kroger Co.
Certificate of Service |
November 6, 2020 |
Phase II Surrebuttal Testimony of Robert J. Camfield for the Division of Public Utilities
Certificate of Service |
November 6, 2020 |
Phase II Surrebuttal Testimony of Bruce R. Chapman for the Division of Public Utilities
Certificate of Service |
November 6, 2020 |
Phase II Surrebuttal Testimony of Ron Nelson on behalf of the Office of Consumer Services
OCS Exhibit 5.1S – Compilation of Discovery Responses
OCS Workpapers 5.1S – 5.3S [CONFIDENTIAL]
Certificate of Service |
November 6, 2020 |
Notice |
November 6, 2020 |
Appendix A, Re: Steven S. Michel for Western Resource Advocates |
November 6, 2020 |
Recorded Live Stream of Hearing on Phase I – Revenue Requirement in Docket No. 20-035-04 and Phase II in Docket No. 18-035-36 Held on November 6, 2020 |
November 5, 2020 |
Public Comments from November 5, 2020 |
November 5, 2020 |
Recorded Live Stream of Hearing on Phase I – Revenue Requirement in Docket No. 20-035-04 and Phase II in Docket No. 18-035-36 Held on November 5, 2020 |
November 4, 2020 |
Recorded Live Stream of Hearing on Phase I – Revenue Requirement in Docket No. 20-035-04 and Phase II in Docket No. 18-035-36 Held on November 4, 2020 |
November 3, 2020 |
Recorded Live Stream of Public Witness Hearing Held on November 3, 2020 |
November 3, 2020 |
Recorded Live Stream of Hearing on Phase I – Revenue Requirement in Docket No. 20-035-04 and Phase II in Docket No. 18-035-36 Held on November 3, 2020 |
November 2, 2020 |
Public Comments from November 2, 2020 |
November 2, 2020 |
Redacted Rocky Mountain Power’s Errata Filing
Rocky Mountain Power’s Errata Filing [CONFIDENTIAL] |
November 2, 2020 |
Walmart Inc.’s Notification it Shall not Appear at Revenue Requirement Hearing |
November 2, 2020 |
List of Speakers for the Public Witness Hearing on November 3, 2020 |
October 30, 2020 |
Recorded Live Stream of Hearing on Phase I Cost of Capital Held on October 30, 2020 |
October 30, 2020 |
Redacted Phase I Surrebuttal Testimony of Kevin C. Higgins on behalf of Utah Association of Energy Users
Phase I Surrebuttal Testimony of Kevin C. Higgins on behalf of Utah Association of Energy Users [CONFIDENTIAL]
UAE Exhibits RR 5.01 to RR 5.17 [CONFIDENTIAL]
UAE Exhibit RR 5.18 –Data Requests’ Responses Relied Upon [CONFIDENTIAL]
Certificate of Service
Certificate of Service [CONFIDENTIAL] |
October 29, 2020 |
Phase I Revenue Requirement Surrebuttal Testimony of Sarah Wright on behalf of Utah Clean Energy
Certificate of Service |
October 29, 2020 |
Redacted Phase I Surrebuttal Testimony of Dr. Joni S. Zenger for the Division of Public Utilities
Phase I Surrebuttal Testimony of Dr. Joni S. Zenger for the Division of Public Utilities [CONFIDENTIAL]
Certificate of Service |
October 29, 2020 |
Redacted Phase I Surrebuttal Testimony of Brenda Salter for the Division of Public Utilities
Phase I Surrebuttal Testimony of Brenda Salter for the Division of Public Utilities [CONFIDENTIAL]
DPU Exhibit 3.1 SR – JAM Model
Certificate of Service |
October 29, 2020 |
Phase I Surrebuttal Testimony of Gary L. Smith for the Division of Public Utilities
DPU Exhibit 9.1 SR – Retired Wind 10 Years vs. 30 Years [CONFIDENTIAL]
Certificate of Service |
October 29, 2020 |
Phase I Surrebuttal Testimony of Eric Orton for the Division of Public Utilities
DPU Exhibit 5.1 SR – Expense Adjustment
Certificate of Service |
October 29, 2020 |
Phase I Surrebuttal Testimony of Robert A. Davis for the Division of Public Utilities
Certificate of Service |
October 29, 2020 |
Redacted Phase I Surrebuttal Testimony of Philip Hayet for the Office of Consumer Services
Phase I Surrebuttal Testimony of Philip Hayet for the Office of Consumer Services [CONFIDENTIAL]
Redacted OCS Exhibit 4.1S – Compilation of Discovery Responses
OCS Exhibit 4.1S – Compilation of Discovery Responses [CONFIDENTIAL]
OCS Hayet Surrebuttal Testimony Workpapers 1 – Summary of GRID Runs
OCS Hayet Surrebuttal Testimony Workpapers 2 – NPC Report Files [CONFIDENTIAL]
OCS Hayet Surrebuttal Testimony Workpapers 3 – UTGRC 2020 NPC User R9 [CONFIDENTIAL]
OCS Hayet Surrebuttal Testimony Workpapers 4 – Attachment 23.3-2 1st Revised [CONFIDENTIAL]
OCS Hayet Surrebuttal Testimony Workpapers 5 – NPC Run 9 PMv2 [CONFIDENTIAL]
Certificate of Service
Certificate of Service [CONFIDENTIAL] |
October 29, 2020 |
Phase I Revenue Requirement Surrebuttal Testimony of Donna Ramas for the Office of Consumer Services
OCS Exhibits 3.1S to 3.4S
OCS Exhibit 3.5S – Compilation of Discovery Responses
OCS Ramas Surrebuttal Testimony Workpapers [CONFIDENTIAL]
Certificate of Service |
October 29, 2020 |
Phase I Surrebuttal Testimony of Alyson Anderson on behalf of the Utah Office of Consumer Services
Certificate of Service |
October 29, 2020 |
Rocky Mountain Power’s Phase I Revenue Requirement Surrebuttal Testimonies |
October 29, 2020 |
Recorded Live Stream of Hearing on Phase I Cost of Capital Held on October 29, 2020 |
October 26, 2020 |
Notice of Appearance of Cameron L. Sabin for Rocky Mountain Power |
October 21, 2020 |
Order Granting Motion, Amended Scheduling Order, and Amended Notice of Electronic Hearings |
October 20, 2020 |
Appendix A, Re: Erin Yoder Logue for Stadion LLC |
October 19, 2020 |
Rocky Mountain Power’s Unopposed Motion to Consolidate the Hearing on Phase II of Docket No. 18-035-36 with Docket No. 20-035-04 |
October 19, 2020 |
Phase II Rebuttal Testimony of Justin Bieber on behalf of the Utah Association of Energy Users
UAE Exhibit COS 4.1 – OCS Responses to UAE Data Requests 1.1 and 1.2 |
October 16, 2020 |
Public Comments from October 16, 2020 |
October 16, 2020 |
Redacted Rocky Mountain Power’s Phase II Cost of Service/Pricing Rebuttal Testimonies
Rocky Mountain Power’s Phase II Cost of Service/Pricing Rebuttal Testimonies [CONFIDENTIAL]
RMP Workpapers RMM – 1R
RMP Workpapers RMM – 2R [CONFIDENTIAL] |
October 16, 2020 |
Phase II Rebuttal Testimony of Ron Nelson on behalf of the Office of Consumer Services
Certificate of Service |
October 16, 2020 |
Phase II Rebuttal Testimony of Michele Beck on behalf of the Office of Consumer Services
Certificate of Service |
October 16, 2020 |
Phase II Rebuttal Testimony of Richard A. Baudino on behalf of the Kroger Co.
Certificate of Service |
October 16, 2020 |
Phase II Cost of Service Rebuttal Testimony of Sarah Wright on behalf of Utah Clean Energy
Certificate of Service |
October 16, 2020 |
Phase II Rebuttal Testimony of Robert J. Camfield for the Division of Public Utilities
Certificate of Service |
October 16, 2020 |
Phase II Rebuttal Testimony of Bruce R. Chapman for the Division of Public Utilities
Certificate of Service |
October 16, 2020 |
Phase II Rebuttal Testimony of Douglas J. Howe on behalf of Western Resource Advocates
Certificate of Service |
October 15, 2020 |
Public Comments from October 15, 2020 |
October 15, 2020 |
Amended Notice of Electronic Hearings and Electronic Public Witness Hearing |
October 14, 2020 |
Appendix A, Re: Philip DiDomenico and Dan Koehler for the Division of Public Utilities |
October 9, 2020 |
Order Granting Intervention of Salt Lake City Corporation |
October 8, 2020 |
Phase I Cost of Capital Surrebuttal Testimony of Dr. J. Randall Woolridge for the Office of Consumer Services
Certificate of Service |
October 8, 2020 |
Phase I Surrebuttal Testimony of Casey J. Coleman for the Division of Public Utilities
DPU SR 02 – Attachment 1
DPU SR 02 – Attachment 2
DPU SR 02 – Attachment 3
DPU SR 02 – Attachment 4
DPU SR 02 – Attachment 5
DPU SR 02 – Attachment 6
DPU SR 02 – Attachment 7
DPU SR 02 – Attachment 8
Certificate of Service |
October 7, 2020 |
Public Comments from October 7, 2020 |
October 6, 2020 |
Public Comments from October 6, 2020 |
October 5, 2020 |
Redacted Rocky Mountain Power’s Phase I – Revenue Requirement Rebuttal Testimonies
Rocky Mountain Power’s Phase I – Revenue Requirement Rebuttal Testimonies [CONFIDENTIAL]
Nikki Kobliha
RMP Exhibit NLK – 1RR
RMP Workpapers NLK – 1RR
Curtis B. Mansfield
RMP Exhibit CBM – 2R
Steven R. McDougal
RMP Exhibit SRM – 5R
RMP Exhibit SRM – 6R
RMP Exhibit SRM – 7R
RMP Exhibit SRM – 8R
Redacted RMP Workpapers SRM – Table 10, Rebuttal Adjustments
RMP Workpapers SRM – Table 10, Rebuttal Adjustments [CONFIDENTIAL]
UT GRC JAM – DEC 2021 Test Period, Rebuttal Phase 1 Model [CONFIDENTIAL]
UT GRC JAM – DEC 2021 Test Period, Rebuttal Phase 2 Model [CONFIDENTIAL]
Kyle T. Moore
RMP Exhibit KTM – 1R
David G. Webb
RMP Exhibit DGW – 1R
RMP Workpapers DGW – 1
RMP Workpapers DGW – 2 [CONFIDENTIAL]
Timothy J. Hemstreet
RMP Exhibit TJH – 1R [CONFIDENTIAL]
|
October 5, 2020 |
Phase I Rebuttal Testimony of Brian Dickman on behalf of Stadion LLC |
October 5, 2020 |
Redacted Phase I Rebuttal Testimony of Brenda Salter for the Division of Public Utilities
Phase I Rebuttal Testimony of Brenda Salter for the Division of Public Utilities [CONFIDENTIAL]
DPU Exhibit 3.1 R – Rocky Mountain Power’s Results of Operations
Certificate of Service |
October 5, 2020 |
Phase I Rebuttal Testimony of Eric Orton for the Division of Public Utilities
Certificate of Service |
October 5, 2020 |
Phase I Rebuttal Testimony of William “Artie” Powell for the Division of Public Utilities
Certificate of Service |
October 5, 2020 |
Phase I Rebuttal Testimony of Gary L. Smith for the Division of Public Utilities
Certificate of Service |
October 5, 2020 |
Phase I Rebuttal Testimony of Robert A. Davis for the Division of Public Utilities
Certificate of Service |
October 5, 2020 |
Phase I Rebuttal Testimony of Kevin C. Higgins on behalf of Utah Association of Energy Users |
October 5, 2020 |
Appendix A, Re: Aaron Kressig for Western Resource Advocates |
September 29, 2020 |
Public Comments from September 29, 2020 |
September 23, 2020 |
Notice |
September 18, 2020 |
Public Comments from September 18, 2020 |
September 17, 2020 |
Petition to Intervene of Salt Lake City Corporation |
September 17, 2020 |
Redacted Rocky Mountain Power’s Phase I Cost of Capital Rebuttal Testimonies
Rocky Mountain Power’s Phase I Cost of Capital Rebuttal Testimonies [CONFIDENTIAL]
RMP Workpapers 1 – PacifiCorp June 2020 CO Moodys [CONFIDENTIAL]
RMP Workpapers 2 – S&P-PacifiCorp (Full Analysis 4-8-2020) [CONFIDENTIAL] |
September 16, 2020 |
Public Comments from September 16, 2020 |
September 15, 2020 |
Phase II Direct Testimony of Justin Bieber on behalf of the Utah Association of Energy Users
UAE Exhibit 2.1 – RMP’s Responses to Data Requests
UAE Exhibits 2.2 – 2.3
UAE COS Workpapers – Tables and Spreadsheets |
September 15, 2020 |
Phase II Cost of Service Direct Testimony of Sarah Wright on behalf of Utah Clean Energy
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Ron Nelson on behalf of the Office of Consumer Services
OCS Exhibit 5.1D – Resume of Ron Nelson
OCS Exhibit 5.2D – Responses to Data Requests
OCS Workpapers 5.1D – Summaries of ECOSS
OCS Workpapers 5.2D – RMP’s Unbundled Rate Components to Cost-Based Rate Components Estimated within RMP’s ECOSS
OCS Workpapers 5.3D – Bill Impact Analysis of RMP’s Proposed Residential Rates
OCS Workpapers 5.4D – Analysis of RMP’s AMI Costs and Benefits
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Alyson Anderson on behalf of the Utah Office of Consumer Services
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Robert J. Camfield for the Division of Public Utilities
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Robert A. Davis for the Division of Public Utilities
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Bruce R. Chapman for the Division of Public Utilities
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Christopher F. Benson on behalf of the University of Utah |
September 15, 2020 |
Phase II Cost of Service Direct Testimony of Steve W. Chriss on behalf of Walmart Inc.
Walmart Exhibit SWC 5 – Rocky Mountain Power’s Proposed Movement Towards Cost of Service for General Service Schedules at the Company’s Proposed Revenue Requirement
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Douglas J. Howe on behalf of Western Resource Advocates
WRA Exhibit DJH 1 – Resume of Douglas J. Howe, Ph.D.
WRA Workpapers DJH 1 – EIM Price Heat Map
WRA Workpapers DJH 2 – Emissions-Load Heat Maps
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Aaron J. Kressig on behalf of Western Resource Advocates
WRA Exhibit AJK 1 – Statement of Qualifications of Aaron Kressig
WRA Exhibit AJK 2 – Schedule 6 and 6A Computations
WRA Workpapers AJK 1 – Schedule 6 and 6A Computations
Certificate of Service |
September 15, 2020 |
Phase II Direct Testimony of Richard A. Baudino on behalf of The Kroger Co.
Kroger Exhibit RAB 1 – Resume of Richard A. Baudino
Kroger Exhibit RAB 2 – Analyses Revenue Allocation
Kroger Exhibit RAB 3 – Calculations of Energy Charges
Certificate of Service |
September 15, 2020 |
Phase II Initial Testimony of Anne Smart on behalf of ChargePoint, Inc.
ChargePoint Exhibit ATS 1 – Settlement Agreement Filed by Pacific Power in Oregon with the Public Utilities Commission in Docket No. UE 374
ChargePoint Exhibit ATS 2 – Pacific Power’s Oregon Schedule 45
Certificate of Service |
September 2, 2020 |
Redacted Phase I Revenue Requirement Direct Testimony of Kevin C. Higgins on behalf of Utah Association of Energy Users
Phase I Revenue Requirement Direct Testimony of Kevin C. Higgins on behalf of Utah Association of Energy Users [CONFIDENTIAL]
Redacted UAE Exhibits RR1.1 – RR1.16
UAE Exhibits RR1.1 – RR1.16 [CONFIDENTIAL]
UAE Exhibit RR1.17 – RMP’s Responses to Data Requests
UAE Exhibit RR1.18 – RMP’s Responses to Data Requests [CONFIDENTIAL] |
September 2, 2020 |
Phase I Revenue Requirement Direct Testimony of Sarah Wright on behalf of Utah Clean Energy
Certificate of Service |
September 2, 2020 |
Redacted Direct Revenue Requirement Testimony of Donna Ramas for the Office of Consumer Services
Direct Revenue Requirement Testimony of Donna Ramas for the Office of Consumer Services [CONFIDENTIAL]
OCS Appendix I – Qualifications of Donna Ramas
OCS Exhibits 3.1D to 3.21D
OCS Exhibit 3.22D – Compilation of Data Request Responses
OCS Workpapers 3D – UT GRC JAM Dec 2021 [CONFIDENTIAL]
Certificate of Service
Certificate of Service [CONFIDENTIAL] |
September 2, 2020 |
Redacted Phase I Revenue Requirement Direct Testimony of Philip Hayet for the Office of Consumer Services
Phase I Revenue Requirement Direct Testimony of Philip Hayet for the Office of Consumer Services [CONFIDENTIAL]
OCS Exhibit 4.1D – Qualifications of Philip Hayet
Redacted OCS Exhibit 4.2D – Compilation of Data Request Responses
OCS Exhibit 4.2D – Compilation of Data Request Responses [CONFIDENTIAL]
OCS Workpapers 4D – GRID Model Databases and Spreadsheet [CONFIDENTIAL]
Certificate of Service
Certificate of Service [CONFIDENTIAL] |
September 2, 2020 |
Phase I Revenue Requirement Direct Testimony of Alyson Anderson on behalf of the Utah Office of Consumer Services
Certificate of Service |
September 2, 2020 |
Redacted Phase I Revenue Requirement Direct Testimony of Dr. Joni S. Zenger for the Division of Public Utilities Phase I Revenue Requirement Direct Testimony of Dr. Joni S. Zenger for the Division of Public Utilities [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
September 2, 2020 |
Phase I Revenue Requirement Direct Testimony of Gary L. Smith for the Division of Public Utilities
Certificate of Service |
September 2, 2020 |
Order Granting Intervention of ChargePoint, Inc. |
September 2, 2020 |
Phase I Revenue Requirement Direct Testimony of Eric Orton for the Division of Public Utilities DPU Exhibits 5.1 – 5.3 Certificate of Service |
September 2, 2020 |
Redacted Phase I Revenue Requirement Direct Testimony of JJ Alder for the Division of Public Utilities Phase I Revenue Requirement Direct Testimony of JJ Alder for the Division of Public Utilities [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
September 2, 2020 |
Phase I Revenue Requirement Direct Testimony of Dr. William “Artie” Powell for the Division of Public Utilities DPU Exhibit 7.1 DIR – Generation Overhaul Expense Simulation Model DPU Exhibit 7.2 DIR – Cover Letter DPU Exhibit 7.2 DIR – Generation Overhaul Expense Simulation (Excel) Certificate of Service |
September 2, 2020 |
Phase I Revenue Requirement Direct Testimony of Robert A. Davis for the Division of Public Utilities Certificate of Service |
September 2, 2020 |
Phase I Revenue Requirement Direct Testimony of Brenda Salter for the Division of Public Utilities DPU Exhibit 3.1 DIR – Division’s Adjustments and Recommendations in JAM Model DPU Exhibit 3.2 DIR – RMP’s Response to Corrections and Changes [CONFIDENTIAL] Certificate of Service Certificate of Service [CONFIDENTIAL] |
August 26, 2020 |
Order Granting Intervention of the University of Utah |
August 20, 2020 |
Phase I Direct Testimony of J. Randall Woolridge for the Office of Consumer Services OCS Appendix A – Qualifications of J. Randall Woolridge OCS Appendix B – Projected EPS and GDP Growth and the Market Risk Premium OCS Exhibits JRW 1 – JRW 10 OCS Attachment 1 – Data Request 2.28 OCS Woolridge Workpapers Index OCS Woolridge Workpapers 1 – Reference Articles OCS Woolridge Workpapers 2 – Electric Value Lines OCS Woolridge Workpapers 3 – Work Sheets Certificate of Service |
August 20, 2020 |
Phase I Errata to Direct Testimony of Steve W. Chriss on behalf of Walmart Inc. Certificate of Service |
August 20, 2020 |
Phase I Direct Testimony of Steve W. Chriss on behalf of Walmart Inc. Walmart Exhibit SWC 1 – Witness Qualifications Statement Walmart Exhibits SWC 2 – SWC 4 Certificate of Service |
August 20, 2020 |
Phase I Direct Testimony of Casey J. Coleman for the Division of Public Utilities DPU Exhibits 2.01 – 2.08 and Data Proxy Groups Certificate of Service |
August 17, 2020 |
Appendix A, Re: Kurt Boehm, Jody Cohn, Brian W. Burnett, Richard Baudino, and Brian R. Barber for the Kroger Co. |
August 13, 2020 |
Corrected Appendix A, Re: R. Bryce Dalley, Elizabeth Ferrell, Jacqueline Dory, Brian Dickman, Irion Sanger, and Joni Sliger for Stadion LLC |
August 13, 2020 |
Correspondence from Sanger Law PC |
August 11, 2020 |
Entry of Appearance of Counsel on behalf of ChargePoint, Inc. |
August 11, 2020 |
Motion to Intervene of ChargePoint, Inc. |
August 4, 2020 |
Order Granting Intervention of Stadion LLC |
August 4, 2020 |
Appendix A, Re: Christopher Benson and Katie Carreau for the University of Utah |
August 4, 2020 |
Petition to Intervene of the University of Utah |
July 29, 2020 |
Appendix A, Re: R. Bryce Dalley, Elizabeth Ferrell, Jacqueline Dory, Brian Dickman, Irion Sanger, Joni Sliger, and Erin Yoder Logue for Stadion LLC |
July 27, 2020 |
Technical Conference Presentation for July 27, 2020 – Phase II: Cost of Service/Pricing Questions from the Public Service Commission Questions from the Division of Public Utilities Questions from Western Resource Advocates Audio of Technical Conference held July 27, 2020 |
July 22, 2020 |
Division of Public Utilities’ Questions for the July 27, 2020 Phase II Technical Conference |
July 14, 2020 |
Petition to Intervene of Stadion LLC |
July 10, 2020 |
Audio of Technical Conference Held July 10, 2020 |
July 9, 2020 |
Technical Conference Presentation for July 10, 2020 – Phase I: Cost of Capital/Revenue Requirement Questions from the Office of Consumer Services Questions from Utah Clean Energy |
July 9, 2020 |
Appendix A, Re: William Dunkel and Roxie McCullar for the Division of Public Utilities |
July 8, 2020 |
Amended Notice of Technical Conferences |
July 1, 2020 |
Appendix A, Re: James B. Dalton for Western Resource Advocates |
June 30, 2020 |
Office of Consumer Services’ Questions and Topics for the July 10, 2020 Phase I Technical Conference |
June 30, 2020 |
Order Granting Intervention of US Magnesium, LLC |
June 24, 2020 |
Appendix A, Re: Callie Hood and Douglas Howe for Western Resource Advocates |
June 22, 2020 |
Order Granting Intervention of Utah Clean Energy |
June 22, 2020 |
Public Service Commission’s Questions for the July 10, 2020 Technical Conference |
June 17, 2020 |
Order Granting Intervention of The Kroger Co. |
June 9, 2020 |
Scheduling Order, Notice of Technical Conferences, Notice of Hearings, and Notice of Public Witness Hearing |
June 9, 2020 |
Appendix A, Re: Roger Swenson for US Magnesium, LLC |
June 9, 2020 |
Petition to Intervene of US Magnesium, LLC |
June 8, 2020 |
Appendix A, Re: James A. Logan for the Utah Public Service Commission |
June 2, 2020 |
Rocky Mountain Power’s Supplemental Filing RMP Workpapers RMM 3 – Functional Factors |
June 1, 2020 |
Appendix A, Re: Hunter Holman, Kate Bowman, and Sarah Wright for Utah Clean Energy |
June 1, 2020 |
Petition for Leave to Intervene of Utah Clean Energy |
May 28, 2020 |
Correspondence from Rocky Mountain Power, Re: Parties Proposed Stipulated Schedule RMP Attachment A – Parties Proposed Stipulated Schedule |
May 27, 2020 |
The Kroger Co.’s Notice of Appearance of Attorneys Licensed in a Foreign State |
May 27, 2020 |
The Kroger Co.’s Petition to Intervene |
May 21, 2020 |
Appendix A, Re: J. Randall Woolridge for the Office of Consumer Services |
May 20, 2020 |
Comments from the Division of Public Utilities DPU Attachment 1 – Analysis |
May 19, 2020 |
Amended Notice of Telephonic Scheduling Conference |
May 14, 2020 |
Appendix A, Re: Philip Hayet, Randall J. Falkenberg, and Samuel Wyrobeck for the Office of Consumer Services |
May 14, 2020 |
Notice of Filing and Telephonic Scheduling Conference |
May 14, 2020 |
Appendix A, Re: Donna Ramas for the Office of Consumer Services |
May 11, 2020 |
Action Request, Due: May 22, 2020 |
May 8, 2020 |
Direct Testimony of Robert M. Meredith for Rocky Mountain Power RMP Workpapers RMM 1 – COS RMP Workpapers RMM 2 – Pricing RMP Workpapers RMM 3 [CONFIDENTIAL] |
May 8, 2020 |
Direct Testimony of William J. Comeau for Rocky Mountain Power |
May 8, 2020 |
Redacted Direct Testimony of Steven R. McDougal for Rocky Mountain Power Direct Testimony of Steven R. McDougal for Rocky Mountain Power [CONFIDENTIAL] RMP Exhibit SRM – 2 RMP Exhibit SRM – 6 RMP Exhibit SRM – 8 RMP Exhibit SRM – 9 RMP Workpapers SRM 6 – TCJA Regulatory Liability Balances RMP Workpapers SRM 8 – EBA Base Allocated RMP Workpapers SRM 9 – Wildland Fire Base |
May 8, 2020 |
Direct Testimony of Melissa S. Nottingham for Rocky Mountain Power RMP Exhibit MSN – 1 |
May 8, 2020 |
Redacted Direct Testimony of David G. Webb for Rocky Mountain Power Direct Testimony of David G. Webb for Rocky Mountain Power [CONFIDENTIAL] RMP Exhibit DGW – 1 RMP Workpapers of David G. Webb [CONFIDENTIAL] |
May 8, 2020 |
Direct Testimony of Curtis B. Mansfield for Rocky Mountain Power |
May 8, 2020 |
Direct Testimony of James C. Owen for Rocky Mountain Power |
May 8, 2020 |
Redacted Direct Testimony of Robert Van Engelenhoven for Rocky Mountain Power Direct Testimony of Robert Van Engelenhoven for Rocky Mountain Power [CONFIDENTIAL] |
May 8, 2020 |
Direct Testimony of Rick A. Vail for Rocky Mountain Power |
May 8, 2020 |
Redacted Direct Testimony of Timothy J. Hemstreet for Rocky Mountain Power Direct Testimony of Timothy J. Hemstreet for Rocky Mountain Power [CONFIDENTIAL] RMP Exhibit TJH – 1 [CONFIDENTIAL] RMP Exhibit TJH – 3 [CONFIDENTIAL] |
May 8, 2020 |
Redacted Direct Testimony of Rick T. Link for Rocky Mountain Power Direct Testimony of Rick T. Link for Rocky Mountain Power [CONFIDENTIAL] RMP Workpapers Link 1 – Cholla [CONFIDENTIAL] RMP Workpapers Link 2 – FC1 and PM [CONFIDENTIAL] RMP Workpapers Link 2 – FC1 and PM PaR Input & Output [CONFIDENTIAL] RMP Workpapers Link 2 – FC1 and PM SO Input & Output [CONFIDENTIAL] RMP Workpapers Link 3 – Load Support Tables 6-8 for Testimony UT 2020 GRC [CONFIDENTIAL] RMP Workpapers Link 4 – Naughton [CONFIDENTIAL] RMP Workpapers Link 5 – Repower [CONFIDENTIAL] RMP Workpapers Link 5 – Repower Feb 2018 [CONFIDENTIAL] RMP Workpapers Link 5 – Repower Aug 2018 [CONFIDENTIAL] |
May 8, 2020 |
Direct Testimony of Ann E. Bulkley for Rocky Mountain Power RMP Exhibits AEB – 2 to 11 |
May 8, 2020 |
Redacted Direct Testimony of Nikki L. Kobliha for Rocky Mountain Power Direct Testimony of Nikki L. Kobliha for Rocky Mountain Power [CONFIDENTIAL] RMP Exhibit NLK – 1 RMP Exhibit NLK – 3 RMP Exhibit NLK – 5 RMP Exhibit NLK – 6 RMP Workpapers NLK 1 – Moody’s PacifiCorp 2019 COS [CONFIDENTIAL] RMP Workpapers NLK 2 – Moody’s Tax Reform SC January 2018 [CONFIDENTIAL] RMP Workpapers NLK 3 – PacifiCorp 2020 Underwriting Agreement [CONFIDENTIAL] RMP Workpapers NLK 4 – PacifiCorp Prospectus Supplement CLEAN [CONFIDENTIAL] RMP Workpapers NLK 5 – Report of Securities Issued 0420 [CONFIDENTIAL] RMP Workpapers NLK 6 – S&P Assessing U.S. Investor-Owned Utility Regulatory Environments (August 10, 2016 [CONFIDENTIAL] RMP Workpapers NLK 7 – SP 2018.1.24 S&P US Tax Reform for Utilities Credit Quality Challenges [CONFIDENTIAL] RMP Workpapers NLK 8 – SP PacifiCorp Full Analysis March 15, 2019 [CONFIDENTIAL] RMP Workpapers NLK 9 – Table 4 2020 UT GRC Cap Struc and RA Adj Table [CONFIDENTIAL] |
May 8, 2020 |
Direct Testimony of Joelle R. Steward for Rocky Mountain Power |
May 8, 2020 |
Direct Testimony of Gary W. Hoogeveen for Rocky Mountain Power RMP Workpapers of Gary W. Hoogeveen |
May 8, 2020 |
Application For General Rate Increase
Filing Requirements
700-10 Test Period Information – A Test Period in Application 700-10 Test Period Information – B Test Period Preapproved 700-10 Test Period Information – C NPC Modeling Data
700-20 GRC Application Information – Index 700-20 GRC Application Information – A Historical Results of Operations 700-20 GRC Application Information – C Forecasted Test Period
700-21 Cost of Service & Rate Deign – A Class COS Study 700-21 Cost of Service & Rate Deign – B Rate Spread 700-21 Cost of Service & Rate Deign – C Billing Determinants 700-21 Cost of Service & Rate Deign – D Tariff Sheets
700-22 Forecast Test Period Add Info – Index 700-22 Forecast Test Period Add Info – B Rev Req Info 700-22 Forecast Test Period Add Info – C Cos Info 700-22 Forecast Test Period Add Info – D Misc. Info
700-23 Forecast NPC Info – A NPC Index 700-23 Forecast NPC Info – B NPC Documents 700-23 Forecast NPC Info – C NPC Modeling Data
Filing Requirements [CONFIDENTIAL]
700-10 Test Period Information – C NPC Modeling Data 700-20 GRC Application Information – C Forecasted Test Period 700-22 Forecast Test Period Add Info – B Rev Req Info 700-22 Forecast Test Period Add Info – D Misc. Info 700-23 Forecast NPC Info – C NPC Modeling Data
|
May 5, 2020 |
Appendix A, Re: Erin Childs, Matt McDonnell, Mary Caroline Palmer, Ron Nelson, and Maria Roumpani for the Office of Consumer Services |
April 30, 2020 |
Appendix A, Re: Bruce R. Chapman, Robert Camfield, Corey J. Lott, and Nicholas Crowley for the Division of Public Utilities |
April 10, 2020 |
Order Granting Intervention of Western Resource Advocates |
March 31, 2020 |
Notice of Change of Firm Name |
March 27, 2020 |
Appendix A, Re: Stephen W. Chriss for Walmart Inc. |
March 25, 2020 |
Appendix A, Re: Vicki M. Baldwin for Walmart Inc. |
March 19, 2020 |
Appendix A, Re: Sophie Hayes, and Nancy Kelly for Western Resource Advocates |
March 19, 2020 |
Petition for Leave to Intervene of Western Resource Advocates Certificate of Service |
March 18, 2020 |
Appendix A, Re: Kevin C. Higgins, Neal Townsend, Courtney Higgins, Donald Hendrickson, Justin Bieber, and Oliwia Smith for the Utah Association of Energy Users |
March 17, 2020 |
Order Granting Intervention of Nucor Steel-Utah, a Division of Nucor Corporation |
March 13, 2020 |
Reporter’s Transcript, Re: March 5, 2020 |
March 6, 2020 |
Order Approving Test Period |
March 5, 2020 |
Audio of Hearing Held March 5, 2020 |
March 3, 2020 |
Walmart Inc. Notification It Shall Not Appear at Test Year Hearing |
February 28, 2020 |
Notice that Request for a Witness to Testify Telephonically is Granted |
February 27, 2020 |
Unopposed Motion to Allow the Office of Consumer Services’ Out of State Witness, Donna Ramas, to Testify Telephonically and for Expedited Treatment Certificate of Service |
February 26, 2020 |
Direct Testimony of Abdinasir M. Abdulle, Ph.D. for the Division of Public Utilities |
February 26, 2020 |
Direct Testimony of Donna Ramas for the Office of Consumer Services OCS Appendix I – Qualifications of Donna Ramas Certificate of Service |
February 25, 2020 |
Order Granting Intervention of the Utah Association of Energy Users |
February 25, 2020 |
Appendix A, Re: Jeremy R. Cook, Peter J. Mattheis, and Eric J. Lacey for Nucor Steel-Utah |
February 25, 2020 |
Petition to Intervene of Nucor Steel-Utah, a Division of Nucor Corporation |
February 18, 2020 |
Order Granting Intervention of Walmart, Inc. |
February 10, 2020 |
Public Comments from February 10, 2020 |
February 3, 2020 |
Appendix A, Re: Phillip J. Russell for the Utah Association of Energy Users |
February 3, 2020 |
Petition to Intervene of the Utah Association of Energy Users |
January 31, 2020 |
Scheduling Order and Notice of Hearing |
January 28, 2020 |
Scheduling Conference Sign-In Sheet |
January 24, 2020 |
Petition to Intervene of Walmart, Inc. |
January 21, 2020 |
Notice of Scheduling Conference |
January 17, 2020 |
Rocky Mountain Power’s Notice of Intent to File a General Rate Case and Request for Approval of Test Period |