Docket No: 17-035-23

Application of Rocky Mountain Power for Approval of Solicitation Process for Wind Resources

For questions regarding documents not linked call 801-530-6714

Date Description
February 28, 2018 Correspondence from Gary L. Widerburg Re: Merrimack Energy Group, Inc.’s Motion to Deviate from Electronic Filing Requirement
February 27, 2018 Notice
February 27, 2018 Redacted Final Report of the Independent Evaluator Merrimack Energy Group, Inc.
Highly Confidential Final Report of the Independent Evaluator Merrimack Energy Group, Inc. [PROPRIETARY]
February 27, 2018 Merrimack Energy Group, Inc.’s Motion to Deviate from Electronic Filing Requirement
February 15, 2018 Appendix A Re: Aliea Afnan, Daniel Peaco, Carlo Bencomo-Jasso, and Jeffrey Bower
February 7, 2018 Notice of Withdrawal of Counsel – Sophie Hayes
November 9, 2017 Order on Review
November 7, 2017 Rocky Mountain Power’s Response in Opposition to Utah Association of Energy Users’ Petition For Reconsideration and Rehearing
October 23, 2017 Petition of the Utah Association of Energy Users for Reconsideration and Rehearing of Commission Order Issued September 22, 2017
October 11, 2017 Rocky Mountain Power’s 2017R RFP Code of Conduct Acknowledgement Forms
October 10, 2017 Rocky Mountain Power’s 2017R RFP Update
October 5, 2017 Rocky Mountain Power 2017R RFP Code of Conduct Acknowledgement Forms
September 28, 2017 Rocky Mountain Power 2017R RFP Code of Conduct Acknowledgement Forms
September 27, 2017 Order Granting Intervention of sPower
September 22, 2017 Reporter’s Transcript Re: September 19, 2017
September 22, 2017 Order Approving RFP with Suggested Modification
September 21, 2017 Order Granting Intervention of Utah Clean Energy
September 19, 2017 Audio of Hearing held September 19, 2017
September 19, 2017 Appendix A Re: F. Steven Knudsen
September 15, 2017 Notice
September 14, 2017 Rocky Mountain Power’s Opposition to Petition to Intervene of sPower and Prefiled Rebuttal Testimony of Hans Isern
September 14, 2017 Joint Notice to Withdraw RMP’s Opposition to Enyo Renewable Energy’s Amended Petition to Intervene and to Withdraw Enyo Renewable Energy’s Amended Petition to Intervene
September 13, 2017 sPower’s Prefiled Rebuttal Testimony of Hans Isern Regarding PacifiCorp’s Proposed RFP
September 13, 2017 sPower’s Notice of Intent to Have a Witness Appear Telephonically
September 13, 2017 Appendix A Re: Melissa Barbanell
September 13, 2017 Petition to Intervene of sPower
September 13, 2017 Rebuttal Testimony of Bela Vastag for the Office of Consumer Services

Rebuttal Testimony of Philip Hayet for the Office of Consumer Services
Exhibit 2.1R – Resume
Exhibit 2.2R – SNL Article
Certificate of Service
September 13, 2017 Rebuttal Testimony of Sarah Wright on behalf of Intervenor Utah Clean Energy
September 13, 2017 Utah Association of Energy Users’ Prefiled Testimony of F. Steven Knudsen Regarding PacifiCorp’s Proposed RFP
September 13, 2017 Second Set of Comments of the Interwest Energy Alliance
September 13, 2017 Redacted Rebuttal Testimony of Charles E. Peterson for the Division of Public Utilities
Certificate of Service
Rebuttal Testimony of Charles E. Peterson [PROPRIETARY]
Certificate of Service [PROPRIETARY]
September 13, 2017 Rebuttal Testimony of Wayne J. Oliver
Exhibit 1.1 – Resume
Exhibit 1.2 – Report of the Utah Independent Evaluator Regarding PacifiCorp’s Draft Renewable Request for Proposals (2017R RFP)
Certificate of Service
September 12, 2017 Rocky Mountain Power’s Opposition to Amended Petition to Intervene of Enyo Renewable Energy and Motion for Expedited Treatment
September 12, 2017 Office of Consumer Services’ Notice of Intent to have a Witness Appear Telephonically
Certificate of Service
September 7, 2017 Amended Petition to Intervene of Enyo Renewable Energy
September 7, 2017 Petition to Intervene of Enyo Renewable Energy
August 31, 2017 Rocky Mountain Power Supplemental Testimony of Rick T. Link
August 31, 2017 Appendix A Re: Emma Rieves
August 31, 2017 Appendix A Re: Sarah Wright, Kate Bowman, and Sophie Hayes
August 31, 2017 Utah Clean Energy Petition to Intervene
August 29, 2017 Scheduling Order
August 28, 2017 Rocky Mountain Power 2017 RFP Code of Conduct Acknowledgment Forms
August 25, 2017 Scheduling Conference Sign-In Sheet
August 24, 2017 Order Granting Intervention of the Interwest Energy Alliance
August 23, 2017 Order Rescheduling Scheduling Conference
August 23, 2017 Rocky Mountain Power Motion to Change Conference Date
August 22, 2017 Order and Notice of Scheduling Conference
August 18, 2017 Rocky Mountain Power’s Reply in Support of Application for Approval of Solicitation Process
Appendices A-O to RFP Main Document
Appendix A-1 – Overview of Appendices
Appendix A-2 – Project Interconnection Agreement
Appendix A-3 – Permit Matrix
Appendix A-4 (Not Used)
Appendix A-5 – Project Single-Line Drawing and Layouts
Appendix A-6 – Division of Responsibilities
Appendix A-8 – Performance Summary Report
Appendix A-9 – Wind: Product Data – Equipment Supply Matrix
Appendix C – Bid Summary
Appendix K – Operations and Maintenance Services Contract Final

RFP Appendix A Tech Specs
Appendix A.1 (Wind) – Scope of Work (PPA or BTA)
Appendix A.2 (Wind) – Definitions (PPA or BTA)
Appendix A.3 (Wind) – Work Specifications (PPA or APSA)

RFP Appendix A-7 Owner Standards and Specs
Appendix A-7.01 – Electronic Project Document Formatting and Requirements
Appendix A-7.02 – Attachment 1B – Document Deliverables
Appendix A-7.03 – Computer-Aided Design Drafting Standards – 9A
Appendix A-7.04.1 – EBU PX-S02 Substation Equipment – Collector Substation Main Power Transformer
Appendix A-7.04.02 – ZS-102 Two-Winding Distribution Transformer – Inverter Step-up Liquid-Immersed
Appendix A-7.05 – EBU SI-S04 Electrical Equipment – Insulating Oil
Appendix A-7.06 – EBU SI-S02 Wind, Ice, and Seismic Withstand
Appendix A-7.07 – EBU SI-S03 Contaminated Environment Protection
Appendix A-7.08 – SP-TRF-INST – Transformer and Oil-Filled Reactor Installation Procedure
Appendix A-7.09 – Asset Management Form 006F
Appendix A-7.10.1 – Part 6B.5 – Fence Application and Construction
Appendix A-7.11 – Part 6B.6 – Substation Grounding
Appendix A-7.12 – Generation Engineering – Protective Relaying Requirements for New Plants
Appendix A-7.13 – Generation Engineering – Arc Flash Requirements for New Plants, Revision 5
Appendix A-7.14 – Generation Engineering – CT and PT Testing Procedure
Appendix A-7.15 – Generation Engineering – Thermal Plant Protective Relay Maintenance and Testing – PRC-005
Appendix A-7.16 – Relay Testing & Commissioning Checklist
Appendix A-7.17 – Generation Protection and Control Equipment Installation Procedure
Appendix A-7.18 – Generation Current Transformer Installation Procedure
Appendix A-7.19 – Current Transformer Form
Appendix A-7.20 – SG 001 Substation High-Voltage Warning Signs
Appendix A-7.21 – Specification for Substation Equipment Installation, Testing and Commissioning
Appendix A-7.22 – SV 002 Bird and Animal Protection – General Installation Instructions
Appendix A-7.23 – SV 251 – Bird and Animal Protection for Miscellaneous Equipment
Appendix A-7.24 – TD 051 – Danger Sign

RFP App E-2 PPA
PPA Exhibit 4.6(1) – Form of Green Tag Attestation and Bill of Sale
PPA Exhibit 4.6(2) – PacifiCorp Master Qualified Reporting Entity Services Agreement
PPA Exhibit 8.4.1 – Form of Subordinated Mortgage
PPA Exhibit 11.4 – Form of Memorandum of Power Purchase Agreement
PPA Exhibit D – Form of Parent Guaranty
Appendix E-2 – Wyoming Wind PPA

RFP App F-2 BTA
RFP 2017R – Build Transfer Agreement, Dated June 15, 2017
Appendices A-BB to Build Transfer Agreement
August 18, 2017 Reply Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process
August 18, 2017 Reply Comments from the Division of Public Utilities
August 18, 2017 Reply Comments from the Office of Consumer Services
August 15, 2017 Order Granting Intervention of the Utah Association of Energy Users
August 11, 2017 Report of Utah Independent Evaluator Re: 2017 RFP
2017 RFP (Redline)
August 9, 2017 Appendix A Re: Keith Oliver
August 7, 2017 Errata to Initial Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process
Exhibit A – Corrected Pages
Exhibit B – Corrected Initial Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process
August 4, 2017 Initial Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process
August 4, 2017 Initial Comments of the Interwest Energy Alliance
August 4, 2017 Appendix A Re: Wayne Oliver
August 4, 2017 Redacted Comments from the Division of Public Utilities
Exhibit A Rocky Mountain Power’s Redline RFP Filing – Oregon
Comments from the Division of Public Utilities [PROPRIETARY]
August 3, 2017 Petition to Intervene of the Interwest Energy Alliance
July 25, 2017 Appendix A Re: Gary Dodge
July 25, 2017 Petition to Intervene of the Utah Association of Energy Users
July 17, 2017 Appendix A Re: Donna Ramas
July 13, 2017 Appendix A Re: Randall J. Falkenberg
July 13, 2017 Appendix A Re: Philip Hayet, Randy Futral, and Leah J. Wellborn
June 28, 2017 Scheduling Order, Notice of Comment Period on Request to Deviate from R746-420-1, and Order Granting Extension to Exceed 60-day Approval Deadline
June 27, 2017 Scheduling Conference Sign-In Sheet
June 21, 2017 Notice of Scheduling Conference
June 16, 2017 Action Request, Due: July 17, 2017
June 16, 2017 Application for Approval of Solicitation Process
Appendices A-O to RFP Main Document
Appendix A-1 – Overview of Appendices
Appendix A-2 – Project Interconnection Agreement
Appendix A-3 – Permit Matrix
Appendix A-4 (Not Used)
Appendix A-5 – Project Single-Line Drawing and Layouts
Appendix A-6 – Division of Responsibilities
Appendix A-8 – Performance Summary Report
Appendix A-9 – Wind: Product Data – Equipment Supply Matrix
Appendix C – Bid Summary
Appendix K – Operations and Maintenance Services Contract Final

RFP Appendix A Tech Specs
Appendix A.1 (Wind) – Scope of Work (PPA or BTA)
Appendix A.2 (Wind) – Definitions (PPA or BTA)
Appendix A.3 (Wind) – Work Specifications (PPA or APSA)

RFP Appendix A-7 Owner Standards and Specs
Appendix A-7.01 – Electronic Project Document Formatting and Requirements
Appendix A-7.02 – Attachment 1B – Document Deliverables
Appendix A-7.03 – Computer-Aided Design Drafting Standards – 9A
Appendix A-7.04.1 – EBU PX-S02 Substation Equipment – Collector Substation Main Power Transformer
Appendix A-7.04.02 – ZS-102 Two-Winding Distribution Transformer – Inverter Step-up Liquid-Immersed
Appendix A-7.05 – EBU SI-S04 Electrical Equipment – Insulating Oil
Appendix A-7.06 – EBU SI-S02 Wind, Ice, and Seismic Withstand
Appendix A-7.07 – EBU SI-S03 Contaminated Environment Protection
Appendix A-7.08 – SP-TRF-INST – Transformer and Oil-Filled Reactor Installation Procedure
Appendix A-7.09 – Asset Management Form 006F
Appendix A-7.10.1 – Part 6B.5 – Fence Application and Construction
Appendix A-7.11 – Part 6B.6 – Substation Grounding
Appendix A-7.12 – Generation Engineering – Protective Relaying Requirements for New Plants
Appendix A-7.13 – Generation Engineering – Arc Flash Requirements for New Plants, Revision 5
Appendix A-7.14 – Generation Engineering – CT and PT Testing Procedure
Appendix A-7.15 – Generation Engineering – Thermal Plant Protective Relay Maintenance and Testing – PRC-005
Appendix A-7.16 – Relay Testing & Commissioning Checklist
Appendix A-7.17 – Generation Protection and Control Equipment Installation Procedure
Appendix A-7.18 – Generation Current Transformer Installation Procedure
Appendix A-7.19 – Current Transformer Form
Appendix A-7.20 – SG 001 Substation High-Voltage Warning Signs
Appendix A-7.21 – Specification for Substation Equipment Installation, Testing and Commissioning
Appendix A-7.22 – SV 002 Bird and Animal Protection – General Installation Instructions
Appendix A-7.23 – SV 251 – Bird and Animal Protection for Miscellaneous Equipment
Appendix A-7.24 – TD 051 – Danger Sign

RFP App E-2 PPA
PPA Exhibit 4.6(1) – Form of Green Tag Attestation and Bill of Sale
PPA Exhibit 4.6(2) – PacifiCorp Master Qualified Reporting Entity Services Agreement
PPA Exhibit 8.4.1 – Form of Subordinated Mortgage
PPA Exhibit 11.4 – Form of Memorandum of Power Purchase Agreement
PPA Exhibit D – Form of Parent Guaranty
Appendix E-2 – Wyoming Wind PPA

RFP App F-2 BTA
RFP 2017R – Build Transfer Agreement, Dated June 15, 2017
Appendices A-BB to Build Transfer Agreement
April 17, 2017 Rocky Mountain Power’s Notice of Request for Approval of Solicitation Process