Docket No: 17-035-23
Application of Rocky Mountain Power for Approval of Solicitation Process for Wind Resources
For questions regarding documents not linked call 801-530-6714
Date | Description |
---|---|
February 28, 2018 | Correspondence from Gary L. Widerburg Re: Merrimack Energy Group, Inc.’s Motion to Deviate from Electronic Filing Requirement |
February 27, 2018 | Notice |
February 27, 2018 | Redacted Final Report of the Independent Evaluator Merrimack Energy Group, Inc. Highly Confidential Final Report of the Independent Evaluator Merrimack Energy Group, Inc. [PROPRIETARY] |
February 27, 2018 | Merrimack Energy Group, Inc.’s Motion to Deviate from Electronic Filing Requirement |
February 15, 2018 | Appendix A Re: Aliea Afnan, Daniel Peaco, Carlo Bencomo-Jasso, and Jeffrey Bower |
February 7, 2018 | Notice of Withdrawal of Counsel – Sophie Hayes |
November 9, 2017 | Order on Review |
November 7, 2017 | Rocky Mountain Power’s Response in Opposition to Utah Association of Energy Users’ Petition For Reconsideration and Rehearing |
October 23, 2017 | Petition of the Utah Association of Energy Users for Reconsideration and Rehearing of Commission Order Issued September 22, 2017 |
October 11, 2017 | Rocky Mountain Power’s 2017R RFP Code of Conduct Acknowledgement Forms |
October 10, 2017 | Rocky Mountain Power’s 2017R RFP Update |
October 5, 2017 | Rocky Mountain Power 2017R RFP Code of Conduct Acknowledgement Forms |
September 28, 2017 | Rocky Mountain Power 2017R RFP Code of Conduct Acknowledgement Forms |
September 27, 2017 | Order Granting Intervention of sPower |
September 22, 2017 | Reporter’s Transcript Re: September 19, 2017 |
September 22, 2017 | Order Approving RFP with Suggested Modification |
September 21, 2017 | Order Granting Intervention of Utah Clean Energy |
September 19, 2017 | Audio of Hearing held September 19, 2017 |
September 19, 2017 | Appendix A Re: F. Steven Knudsen |
September 15, 2017 | Notice |
September 14, 2017 | Rocky Mountain Power’s Opposition to Petition to Intervene of sPower and Prefiled Rebuttal Testimony of Hans Isern |
September 14, 2017 | Joint Notice to Withdraw RMP’s Opposition to Enyo Renewable Energy’s Amended Petition to Intervene and to Withdraw Enyo Renewable Energy’s Amended Petition to Intervene |
September 13, 2017 | sPower’s Prefiled Rebuttal Testimony of Hans Isern Regarding PacifiCorp’s Proposed RFP |
September 13, 2017 | sPower’s Notice of Intent to Have a Witness Appear Telephonically |
September 13, 2017 | Appendix A Re: Melissa Barbanell |
September 13, 2017 | Petition to Intervene of sPower |
September 13, 2017 | Rebuttal Testimony of Bela Vastag for the Office of Consumer Services Rebuttal Testimony of Philip Hayet for the Office of Consumer Services Exhibit 2.1R – Resume Exhibit 2.2R – SNL Article Certificate of Service |
September 13, 2017 | Rebuttal Testimony of Sarah Wright on behalf of Intervenor Utah Clean Energy |
September 13, 2017 | Utah Association of Energy Users’ Prefiled Testimony of F. Steven Knudsen Regarding PacifiCorp’s Proposed RFP |
September 13, 2017 | Second Set of Comments of the Interwest Energy Alliance |
September 13, 2017 | Redacted Rebuttal Testimony of Charles E. Peterson for the Division of Public Utilities Certificate of Service Rebuttal Testimony of Charles E. Peterson [PROPRIETARY] Certificate of Service [PROPRIETARY] |
September 13, 2017 | Rebuttal Testimony of Wayne J. Oliver Exhibit 1.1 – Resume Exhibit 1.2 – Report of the Utah Independent Evaluator Regarding PacifiCorp’s Draft Renewable Request for Proposals (2017R RFP) Certificate of Service |
September 12, 2017 | Rocky Mountain Power’s Opposition to Amended Petition to Intervene of Enyo Renewable Energy and Motion for Expedited Treatment |
September 12, 2017 | Office of Consumer Services’ Notice of Intent to have a Witness Appear Telephonically Certificate of Service |
September 7, 2017 | Amended Petition to Intervene of Enyo Renewable Energy |
September 7, 2017 | Petition to Intervene of Enyo Renewable Energy |
August 31, 2017 | Rocky Mountain Power Supplemental Testimony of Rick T. Link |
August 31, 2017 | Appendix A Re: Emma Rieves |
August 31, 2017 | Appendix A Re: Sarah Wright, Kate Bowman, and Sophie Hayes |
August 31, 2017 | Utah Clean Energy Petition to Intervene |
August 29, 2017 | Scheduling Order |
August 28, 2017 | Rocky Mountain Power 2017 RFP Code of Conduct Acknowledgment Forms |
August 25, 2017 | Scheduling Conference Sign-In Sheet |
August 24, 2017 | Order Granting Intervention of the Interwest Energy Alliance |
August 23, 2017 | Order Rescheduling Scheduling Conference |
August 23, 2017 | Rocky Mountain Power Motion to Change Conference Date |
August 22, 2017 | Order and Notice of Scheduling Conference |
August 18, 2017 | Rocky Mountain Power’s Reply in Support of Application for Approval of Solicitation Process Appendices A-O to RFP Main Document Appendix A-1 – Overview of Appendices Appendix A-2 – Project Interconnection Agreement Appendix A-3 – Permit Matrix Appendix A-4 (Not Used) Appendix A-5 – Project Single-Line Drawing and Layouts Appendix A-6 – Division of Responsibilities Appendix A-8 – Performance Summary Report Appendix A-9 – Wind: Product Data – Equipment Supply Matrix Appendix C – Bid Summary Appendix K – Operations and Maintenance Services Contract Final RFP Appendix A Tech Specs Appendix A.1 (Wind) – Scope of Work (PPA or BTA) Appendix A.2 (Wind) – Definitions (PPA or BTA) Appendix A.3 (Wind) – Work Specifications (PPA or APSA) RFP Appendix A-7 Owner Standards and Specs Appendix A-7.01 – Electronic Project Document Formatting and Requirements Appendix A-7.02 – Attachment 1B – Document Deliverables Appendix A-7.03 – Computer-Aided Design Drafting Standards – 9A Appendix A-7.04.1 – EBU PX-S02 Substation Equipment – Collector Substation Main Power Transformer Appendix A-7.04.02 – ZS-102 Two-Winding Distribution Transformer – Inverter Step-up Liquid-Immersed Appendix A-7.05 – EBU SI-S04 Electrical Equipment – Insulating Oil Appendix A-7.06 – EBU SI-S02 Wind, Ice, and Seismic Withstand Appendix A-7.07 – EBU SI-S03 Contaminated Environment Protection Appendix A-7.08 – SP-TRF-INST – Transformer and Oil-Filled Reactor Installation Procedure Appendix A-7.09 – Asset Management Form 006F Appendix A-7.10.1 – Part 6B.5 – Fence Application and Construction Appendix A-7.11 – Part 6B.6 – Substation Grounding Appendix A-7.12 – Generation Engineering – Protective Relaying Requirements for New Plants Appendix A-7.13 – Generation Engineering – Arc Flash Requirements for New Plants, Revision 5 Appendix A-7.14 – Generation Engineering – CT and PT Testing Procedure Appendix A-7.15 – Generation Engineering – Thermal Plant Protective Relay Maintenance and Testing – PRC-005 Appendix A-7.16 – Relay Testing & Commissioning Checklist Appendix A-7.17 – Generation Protection and Control Equipment Installation Procedure Appendix A-7.18 – Generation Current Transformer Installation Procedure Appendix A-7.19 – Current Transformer Form Appendix A-7.20 – SG 001 Substation High-Voltage Warning Signs Appendix A-7.21 – Specification for Substation Equipment Installation, Testing and Commissioning Appendix A-7.22 – SV 002 Bird and Animal Protection – General Installation Instructions Appendix A-7.23 – SV 251 – Bird and Animal Protection for Miscellaneous Equipment Appendix A-7.24 – TD 051 – Danger Sign RFP App E-2 PPA PPA Exhibit 4.6(1) – Form of Green Tag Attestation and Bill of Sale PPA Exhibit 4.6(2) – PacifiCorp Master Qualified Reporting Entity Services Agreement PPA Exhibit 8.4.1 – Form of Subordinated Mortgage PPA Exhibit 11.4 – Form of Memorandum of Power Purchase Agreement PPA Exhibit D – Form of Parent Guaranty Appendix E-2 – Wyoming Wind PPA RFP App F-2 BTA RFP 2017R – Build Transfer Agreement, Dated June 15, 2017 Appendices A-BB to Build Transfer Agreement |
August 18, 2017 | Reply Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process |
August 18, 2017 | Reply Comments from the Division of Public Utilities |
August 18, 2017 | Reply Comments from the Office of Consumer Services |
August 15, 2017 | Order Granting Intervention of the Utah Association of Energy Users |
August 11, 2017 | Report of Utah Independent Evaluator Re: 2017 RFP 2017 RFP (Redline) |
August 9, 2017 | Appendix A Re: Keith Oliver |
August 7, 2017 | Errata to Initial Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process Exhibit A – Corrected Pages Exhibit B – Corrected Initial Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process |
August 4, 2017 | Initial Comments of the Utah Association of Energy Users on Rocky Mountain Power’s Proposed Solicitation Process |
August 4, 2017 | Initial Comments of the Interwest Energy Alliance |
August 4, 2017 | Appendix A Re: Wayne Oliver |
August 4, 2017 | Redacted Comments from the Division of Public Utilities Exhibit A Rocky Mountain Power’s Redline RFP Filing – Oregon Comments from the Division of Public Utilities [PROPRIETARY] |
August 3, 2017 | Petition to Intervene of the Interwest Energy Alliance |
July 25, 2017 | Appendix A Re: Gary Dodge |
July 25, 2017 | Petition to Intervene of the Utah Association of Energy Users |
July 17, 2017 | Appendix A Re: Donna Ramas |
July 13, 2017 | Appendix A Re: Randall J. Falkenberg |
July 13, 2017 | Appendix A Re: Philip Hayet, Randy Futral, and Leah J. Wellborn |
June 28, 2017 | Scheduling Order, Notice of Comment Period on Request to Deviate from R746-420-1, and Order Granting Extension to Exceed 60-day Approval Deadline |
June 27, 2017 | Scheduling Conference Sign-In Sheet |
June 21, 2017 | Notice of Scheduling Conference |
June 16, 2017 | Action Request, Due: July 17, 2017 |
June 16, 2017 | Application for Approval of Solicitation Process Appendices A-O to RFP Main Document Appendix A-1 – Overview of Appendices Appendix A-2 – Project Interconnection Agreement Appendix A-3 – Permit Matrix Appendix A-4 (Not Used) Appendix A-5 – Project Single-Line Drawing and Layouts Appendix A-6 – Division of Responsibilities Appendix A-8 – Performance Summary Report Appendix A-9 – Wind: Product Data – Equipment Supply Matrix Appendix C – Bid Summary Appendix K – Operations and Maintenance Services Contract Final RFP Appendix A Tech Specs Appendix A.1 (Wind) – Scope of Work (PPA or BTA) Appendix A.2 (Wind) – Definitions (PPA or BTA) Appendix A.3 (Wind) – Work Specifications (PPA or APSA) RFP Appendix A-7 Owner Standards and Specs Appendix A-7.01 – Electronic Project Document Formatting and Requirements Appendix A-7.02 – Attachment 1B – Document Deliverables Appendix A-7.03 – Computer-Aided Design Drafting Standards – 9A Appendix A-7.04.1 – EBU PX-S02 Substation Equipment – Collector Substation Main Power Transformer Appendix A-7.04.02 – ZS-102 Two-Winding Distribution Transformer – Inverter Step-up Liquid-Immersed Appendix A-7.05 – EBU SI-S04 Electrical Equipment – Insulating Oil Appendix A-7.06 – EBU SI-S02 Wind, Ice, and Seismic Withstand Appendix A-7.07 – EBU SI-S03 Contaminated Environment Protection Appendix A-7.08 – SP-TRF-INST – Transformer and Oil-Filled Reactor Installation Procedure Appendix A-7.09 – Asset Management Form 006F Appendix A-7.10.1 – Part 6B.5 – Fence Application and Construction Appendix A-7.11 – Part 6B.6 – Substation Grounding Appendix A-7.12 – Generation Engineering – Protective Relaying Requirements for New Plants Appendix A-7.13 – Generation Engineering – Arc Flash Requirements for New Plants, Revision 5 Appendix A-7.14 – Generation Engineering – CT and PT Testing Procedure Appendix A-7.15 – Generation Engineering – Thermal Plant Protective Relay Maintenance and Testing – PRC-005 Appendix A-7.16 – Relay Testing & Commissioning Checklist Appendix A-7.17 – Generation Protection and Control Equipment Installation Procedure Appendix A-7.18 – Generation Current Transformer Installation Procedure Appendix A-7.19 – Current Transformer Form Appendix A-7.20 – SG 001 Substation High-Voltage Warning Signs Appendix A-7.21 – Specification for Substation Equipment Installation, Testing and Commissioning Appendix A-7.22 – SV 002 Bird and Animal Protection – General Installation Instructions Appendix A-7.23 – SV 251 – Bird and Animal Protection for Miscellaneous Equipment Appendix A-7.24 – TD 051 – Danger Sign RFP App E-2 PPA PPA Exhibit 4.6(1) – Form of Green Tag Attestation and Bill of Sale PPA Exhibit 4.6(2) – PacifiCorp Master Qualified Reporting Entity Services Agreement PPA Exhibit 8.4.1 – Form of Subordinated Mortgage PPA Exhibit 11.4 – Form of Memorandum of Power Purchase Agreement PPA Exhibit D – Form of Parent Guaranty Appendix E-2 – Wyoming Wind PPA RFP App F-2 BTA RFP 2017R – Build Transfer Agreement, Dated June 15, 2017 Appendices A-BB to Build Transfer Agreement |
April 17, 2017 | Rocky Mountain Power’s Notice of Request for Approval of Solicitation Process |
Share this: