April 2012 Filing Log

The documents are listed by date, docket number(s), (number of copies filed),
NAME OF DOCUMENT, and a description

Date Docket and Description
4/2/2012 12-046-T02
(1) TARIFF Re: Manti Telephone Company – In reviewing the local tariff of Manti Telephone Company it was noticed that Voice Mail is still in the tariff and this feature was deregulated by the FCC several years ago.  Therefore, we would like to remove this feature from the tariff.
4/2/2012 09-035-15
(11)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power for Approval of its Proposed Energy Cost Adjustment Mechanism
4/2/2012 12-035-67
(11)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
4/2/2012 12-035-68
(11)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account, by Crediting Revenues of Approximately $4.0 Million
4/2/2012 12-057-03
(6)  DIVISION OF PUBLIC UTILITIES’ REPLY REGARDING MOTION TO DISMISS FORMAL COMPLAINT  In the Matter of the Formal Complaint of Dwayne W. Meadows, Ph.D. against Questar Gas Company
4/2/2012 12-041-T01
(3) AMENDED TARIFF FILING Re: Citizens Telecommunications Company of Utah d/b/a Frontier Communications of Utah – The purpose of this filing is to update the Lifeline and Link Up tariff to comply with the Federal Communications Commission (FCC) Docket No. FCC-12-11, Lifeline and Link Up Reform and Modernization.
4/2/2012 12-050-T01
(3) AMENDED TARIFF FILING Re: Navajo Communications Company – The purpose of this filing is to update the Lifeline and Link Up tariff to comply with the Federal Communications Commission (FCC) Docket No. FCC-12-11, Lifeline and Link Up Reform and Modernization.
4/2/2012 11-097-03
(6)  EXTENSION OF RATE CASE FILING  In the Matter of the Notice of Intent of Mountain Sewer Corporation to File a General Rate Case
4/3/2012 12-2180-T01
(3) TARIFF Re: All West Communications, Inc. – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/3/2012 11-035-200
(1)  APPENDIX A RE: CHARLES R. DUBUC, JR., NANCY L. KELLY, STEVEN S. MICHEL, AND JOHN E. CURL  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/3/2012 11-2035-01
(1)  APPENDIX A RE: CHARLES R. DUBUC, JR. AND NANCY L. KELLY  In the Matter of PacifiCorp’s 2011 Integrated Resource Plan
4/3/2012 11-2035-01
(1)  APPENDIX A RE: RANDY FALKENBERG AND LAUREN FALKENBERG  In the Matter of PacifiCorp’s 2011 Integrated Resource Plan
4/4/2012 11-2423-02
(1)  CORRESPONDENCE FROM DAVID Z. THOMPSON  In the Matter of the Application of Cedar Ridge Distribution Company for an Increase in Rates
4/4/2012 12-049-07
(1)  AMENDED INTERCONNECTION AGREEMENT  In the Matter of the Amended Interconnection Agreement between Qwest Corporation dba CenturyLink QC and Redline Phone, Inc.
4/4/2012 12-999-04
(6)  COMMENTS FROM DPU  In the Matter of the 2012 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status
CONTAINS A PROPRIETARY EXHIBIT
4/4/2012 12-2194-01
(1)  CORRESPONDENCE FROM DURFEE CREEK, INC., ASSOCIATION  In the Matter of Durfee Creek, Inc., Association’s Request to Cancel Certificate of Public Convenience and Necessity (CPCN) No. 2728
4/5/2012 11-035-200
(11)  MOTION AND CONSENT OF SPONSORING LOCAL COUNSEL FOR PRO HAC VICE ADMISSION OF OUT OF STATE COUNSEL  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/5/2012 11-035-200
(11)  NOTICE OF APPEARANCE OF ATTORNEY LICENSED IN A FOREIGN STATE FOR INTERVENOR, THE FEDERAL EXECUTIVE AGENCIES  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/5/2012 11-035-200
(11)  PETITION FOR LEAVE TO INTERVENE OF FEDERAL EXECUTIVE AGENCIES  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/5/2012 11-035-T10
(13) SURREBUTTAL TESTIMONY OF CHARLES PETERSON Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/5/2012 11-035-T10
(13) SUR-REBUTTAL TESTIMONY OF MATTHEW CROFT Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/5/2012 11-035-T10
(13) SURREBUTTAL TESTIMONY OF MAURICE BRUBAKER Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/5/2012 11-035-T10
(13) UIEC’S WITNESS AND EXHIBIT LISTS Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/5/2012 11-035-T10
(13) SURREBUTTAL TESTIMONY OF DANIEL E. GIMBLE Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/5/2012 11-035-T10
(6) DIVISION OF PUBLIC UTILITIES’ WITNESS AND EXHIBIT LISTS Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/5/2012 11-035-T10
(10) ROCKY MOUNTAIN POWER’S LIST OF WITNESSES AND EXHIBITS Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/6/2012 12-049-P04
(1) PRICE LIST Re: Qwest Corporation d/b/a CenturyLink QC – This compliance filing eliminates the federal non-Tribal Link Up support as ordered by the FCC.  CenturyLink is also reflecting the Company’s change in name from Qwest Corporation to Qwest Corporation d/b/a CenturyLink QC.
4/6/2012 12-035-T02
(3) TARIFF Re: PacifiCorp – The purpose of this filing is to make changes to the Company’s street lighting tariffs that will better clarify provisions of service for street lighting customers and create consistency across the street lighting tariffs.
4/6/2012 12-035-T03
(3) TARIFF Re: PacifiCorp – The purpose of this filing is to request the removal of the March 31, 2014 expiration from Schedule 192 Self-Direction Credit (the “Self-Direction Credit”) and Schedule 193 Demand-side Management Cost Adjustment (the “DSM Cost Adjustment”) (collectively referred to herein as the “Schedules”) and request administrative changes to the DSM Cost Adjustment.
4/6/2012 12-999-01
(3)  NOTICE OF AFFILIATE TRANSACTION BETWEEN PACIFICORP AND INTERNATIONAL BUSINESS MACHINES (“IBM”)  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/6/2012 12-049-07
(6)  COMMENTS FROM DPU  In the Matter of the Amended Interconnection Agreement between Qwest Corporation dba CenturyLink QC and Redline Phone, Inc.
4/6/2012 10-057-15
(8)  COMMENTS FROM DPU  In the Matter of the Application for Approval of the 2011 Year Budget for Energy Efficiency Programs and Market Transformation Initiative
4/6/2012 12-2324-01 and 12-2536-01
(6)  COMMENTS FROM DPU  In the Matter of the Joint Application of AboveNet, Inc., AboveNet of Utah L.L.C. and Zayo Group, LLC for the Transfer of Indirect Control of AboveNet of Utah L.L.C. to Zayo Group, LLC
4/6/2012 12-035-68
(6)  PETITION TO INTERVENE OF THE UTAH ASSOCIATION OF ENERGY USERS  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account, by Crediting Revenues of Approximately $4.0 Million
4/6/2012 12-035-67
(6)  PETITION TO INTERVENE OF THE UTAH ASSOCIATION OF ENERGY USERS  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
4/6/2012 12-057-04
(8)  PETITION TO INTERVENE OF THE UTAH ASSOCIATION OF ENERGY USERS  In the Matter of the Application of Questar Gas Company to Provide Natural Gas Transportation Service to the Lake Side Power Plant Facility
4/6/2012 12-057-04
(1)  APPENDIX A RE: GARY A. DODGE  In the Matter of the Application of Questar Gas Company to Provide Natural Gas Transportation Service to the Lake Side Power Plant Facility
4/6/2012 12-035-68
(1)  APPENDIX A RE: GARY A. DODGE  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account, by Crediting Revenues of Approximately $4.0 Million
4/6/2012 12-035-67
(1)  APPENDIX A RE: GARY A. DODGE  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
4/6/2012 11-035-200
(1)  APPENDIX A RE: GARY A. DODGE AND ROGER SWENSON  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/6/2012 11-097-03
(6)  APPLICATION FOR GENERAL RATE INCREASE  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/6/2012 11-097-03
(6)  APPLICATION FOR INTERIM RATE INCREASE  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/6/2012 11-097-03
(6)  APPLICATION FOR SPECIAL ASSESSMENT  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/9/2012 12-999-01
(3)  NOTICE OF AFFILIATE TRANSACTION BETWEEN PACIFICORP AND BNSF RAILWAY COMPANY (“BNSF”)  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/9/2012 12-057-03
(1)  EMAIL CORRESPONDENCE FROM DWAYNE MEADOWS, PH.D.  In the Matter of the Formal Complaint of Dwayne W. Meadows, Ph.D. against Questar Gas Company
4/10/2012 11-035-200
(11)  CORRECTIONS AND UPDATES TO CERTAIN LIMITED CATEGORIES OF NET POWER COSTS (NPC) FROM ROCKY MOUNTAIN POWER  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
CONTAINS PROPRIETARY EXHIBITS
4/10/2012 12-046-T02
(3) COMMENTS FROM DPU Re: Manti Telephone Company – In reviewing the local tariff of Manti Telephone Company it was noticed that Voice Mail is still in the tariff and this feature was deregulated by the FCC several years ago.  Therefore, we would like to remove this feature from the tariff.
4/10/2012 12-2180-T01
(3) COMMENTS FROM DPU Re: All West Communications, Inc. – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/10/2012 11-035-200
(6)  PETITION FOR LEAVE TO INTERVENE OF SALT LAKE COMMUNITY ACTION PROGRAM (SLCAP)  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/10/2012 12-042-T01
(3) REVISED TARIFF PAGE Re: Emery Telephone – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11).
4/10/2012 12-057-05
(6)  VERIFIED APPLICATION  In the Matter of the Application of Questar Gas Company for an Adjustment to the 191.1 Balancing Account by Means of a Special One-Time Refund
4/11/2012 12-999-01 Re: 08-035-55
(11)  ROCKY MOUNTAIN POWER’S SERVICE QUALITY STANDARDS – DECEMBER 2011 SERVICE QUALITY REVIEW REPORT  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/11/2012 12-057-03
(1)  EMAIL CORRESPONDENCE FROM DWAYNE MEADOWS, PH.D.  In the Matter of the Formal Complaint of Dwayne W. Meadows, Ph.D. against Questar Gas Company
4/11/2012 11-035-199
(11)  JOINT MOTION TO VACATE SCHEDULE AND FOR APPROVAL OF AN ELECTRONIC NOTIFICATION SYSTEM FOR POLE ATTACHMENTS  In the Matter of the Joint Application of Rocky Mountain Power and Qwest Corporation, d/b/a CenturyLink for Approval of an Electronic Notification System for Pole Attachments
4/11/2012 12-2324-01 and 12-2536-01
(6)  NOTICE OF APPEARANCE OF COUNSEL AND REQUEST FOR NOTICE  In the Matter of the Joint Application of AboveNet, Inc., AboveNet of Utah L.L.C. and Zayo Group, LLC for the Transfer of Indirect Control of AboveNet of Utah L.L.C. to Zayo Group, LLC
4/11/2012 11-035-T12
(3) FINAL RECONCILIATION OF COLLECTIONS UNDER ELECTRIC SERVICE SCHEDULE NOS. 40 & 97 Re: PacifiCorp – The purpose of this filing is to true-up the Collections under Electric Service Schedule Nos. 40 & 97
4/11/2012 12-042-T01
(3) COMMENTS FROM DPU Re: Emery Telephone – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11).
4/11/2012 12-049-P05
(1) PRICE LIST Re: Qwest Corporation d/b/a CenturyLink QC – This filing introduces Primary Rate Service (PRS) Bundle which allows a customer to receive a combination of features and services for a flat monthly rate.
4/12/2012 12-087-P07
(1) PRICE LIST Re: AT&T Communications of the Mountain States, Inc. – The purpose of this filing is to introduce Late Payment Fee verbiage in the Private Line-Local Channel Services Price List.
4/12/2012 11-035-199
(6)  COMMENTS FROM DPU  In the Matter of the Joint Application of Rocky Mountain Power and Qwest Corporation, d/b/a CenturyLink for Approval of an Electronic Notification System for Pole Attachments
4/13/2012 12-057-05
(8)  COMMENTS FROM DPU  In the Matter of the Application of Questar Gas Company for an Adjustment to the 191.1 Balancing Account by Means of a Special One-Time Refund
4/13/2012 10-035-97
(6)  CENTURYLINK’S QUESTIONS FOR TECHNICAL CONFERENCE  In the Matter of the Consolidated Applications of Rocky Mountain Power for Approval of Standard Reciprocal and Non-Reciprocal Pole Attachment Agreements
4/13/2012 11-035-200
(6)  CENTURYLINK’S PETITION TO INTERVENE  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/13/2012 10-035-124
(11)  UIEC’S COMMENTS ON THE DIVISION OF PUBLIC UTILITIES’ REPORT TO THE UTAH PUBLIC SERVICE COMMISSION ON THE COLLABORATIVE PROCESS TO DISCUSS APPROPRIATE CHANGES TO PACIFICORP’S HEDGING PRACTICES  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/13/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM LISA HECHT  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/13/2012 12-035-77 Re: 08-999-05
(3)  REQUEST FOR HOME ENERGY REPORT PILOT PROGRAM  In the Matter of the Request for a Home Energy Report Pilot Program
4/16/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM MARK B. TAYLOR, MD  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/16/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM DEBORAH NICOLL  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/16/2012 12-2238-01 Re: 97-2238-01
(6)  COMMENTS FROM DPU  In the Matter of West Slope Water Company, Inc.’s Request to Cancel Certificate of Public Convenience and Necessity (CPCN) No. 2238
4/16/2012 12-057-04
(1)  APPENDIX A RE: OLIWIA SMITH, NEAL TOWNSEND, KEVIN C. HIGGINS, COURTNEY HIGGINS, AND KELLY FRANCONE  In the Matter of the Application of Questar Gas Company to Provide Natural Gas Transportation Service to the Lake Side Power Plant Facility
4/16/2012 12-035-68
(1)  APPENDIX A RE: OLIWIA SMITH, NEAL TOWNSEND, KEVIN C. HIGGINS, COURTNEY HIGGINS, AND KELLY FRANCONE  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account, by Crediting Revenues of Approximately $4.0 Million
4/16/2012 12-035-68
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account, by Crediting Revenues of Approximately $4.0 Million
4/16/2012 12-035-67
(1)  APPENDIX A RE: OLIWIA SMITH, NEAL TOWNSEND, KEVIN C. HIGGINS, COURTNEY HIGGINS, AND KELLY FRANCONE  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
4/16/2012 12-035-67
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
4/16/2012 12-R405-01 and 12-R100-01
(11) COMMENTS FROM ROCKY MOUNTAIN POWER  In the Matter of the Amendment to Rule 746-405 and 746-100
4/16/2012 12-576-T01
(3) TARIFF Re: Skyline Telecom – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/16/2012 12-2201-T01
(3) TARIFF Re: Bear Lake Communications, Inc. – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/16/2012 12-035-57
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the DSM Annual Report Filing by Rocky Mountain Power
4/16/2012 12-035-03
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Request of Rocky Mountain Power for Major Event Exclusion for the Weather-Related Events that Occurred on December 1-2, 2011
4/17/2012 12-035-70
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Request of Rocky Mountain Power for Major Event Exclusion for the Weather-Related Events that Occurred on January 18-21, 2012
4/17/2012 12-040-T01
(3) TARIFF Re: Central Utah Telephone, Inc. – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/17/2012 12-2208-P02
(9) PRICE LIST Re: XO Communications Services, LLC – These revisions remove increase the monthly recurring charges of several products.
4/17/2012 12-057-04
(8)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Application of Questar Gas Company to Provide Natural Gas Transportation Service to the Lake Side Power Plant Facility
4/17/2012 11-057-14
(8)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of Questar Gas Company’s Replacement Infrastructure 2012 Annual Plan and Budget
4/17/2012 12-035-69
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of a Request for Agency Action for Creation of a DSM Steering Committee for DSM Issues involving Sensitive, Confidential or Proprietary Information or Settlement Negotiations
4/17/2012 12-035-71
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Application of Rocky Mountain Power for Approval of a Strategic Communications and Outreach Program for Demand-Side Management
4/17/2012 11-035-200
(11)  DIVISION OF PUBLIC UTILITIES’ NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/17/2012 11-2035-01
(1)  APPENDIX A RE: ROBERT DEBIRK AND CHRISTOPHER THOMAS  In the Matter of PacifiCorp’s 2011 Integrated Resource Plan
4/18/2012 12-057-06
(1)  FORMAL COMPLAINT  In the Matter of the Formal Complaint of McCleary Associates LLC against Questar Gas Company
4/18/2012 11-2035-01
(1)  APPENDIX A RE: ELIZABETH TORMOEN HICKEY  In the Matter of PacifiCorp’s 2011 Integrated Resource Plan
4/18/2012 12-R405-01 and 12-R100-01
(11) COMMENTS FROM CENTURY LINK  In the Matter of the Amendment to Rule 746-405 and 746-100
4/18/2012 12-028-T01
(3) TARIFF Re: Garkane Energy Cooperative, Inc. – New Rate Schedules
4/18/2012 12-2301-P03
(3) PRICE LIST Re: SBC Long Distance, LLC – The purpose of this filing is to remove previously grandfathered services, sunset services and expired promotional offerings with no remaining subscribers.
4/18/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM DON HARDER  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/18/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM ALLEN HAUSER  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/18/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM LARRY AND SHARON ZINI  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/18/2012 11-097-03
(1)  CORRESPONDENCE FROM DAVID AND TRACI HAYES  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/19/2012 12-035-T04
(3) TARIFF Re: PacifiCorp – Through this filing the Company is requesting approval to modify the Commercial and Industrial Energy Efficiency Incentives Optional for Qualifying Customers (“FinAnswer Express”) program, which is administered through Schedule 115.
4/19/2012 11-035-T10
(11) DIVISION OF PUBLIC UTILITIES’ NOTICE OF WITNESS SUBSTITUTION Re: PacifiCorp – In the Matter of the Rocky Mountain Power Proposed Schedule 94, Energy Balancing Account (EBA) Pilot Program Tariff
4/19/2012 12-576-T01
(3) COMMENTS FROM DPU Re: Skyline Telecom – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/19/2012 12-040-T01
(3) COMMENTS FROM DPU Re: Central Utah Telephone, Inc. – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/19/2012 12-2201-T01
(3) COMMENTS FROM DPU Re: Bear Lake Communications, Inc. – These revisions are necessary as a compliance filing to incorporate the changes implemented by the FCC Lifeline Reform Order (FCC 12-11) eliminating the Link-Up program.
4/19/2012 12-035-69
(11)  COMMENTS FROM THE OFFICE OF ENERGY DEVELOPMENT  In the Matter of a Request for Agency Action for Creation of a DSM Steering Committee for DSM Issues involving Sensitive, Confidential or Proprietary Information or Settlement Negotiations
4/19/2012 11-035-200
(11)  DIVISION OF PUBLIC UTILITIES’ AMENDED NOTICE OF SUBSTITUTION OF COUNSEL  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/19/2012 11-035-200
(1)  APPENDIX A RE: BETSY WOLF  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/19/2012 12-035-70
(11)  COMMENTS FROM DPU  In the Matter of the Request of Rocky Mountain Power for Major Event Exclusion for the Weather-Related Events that Occurred on January 18-21, 2012
4/19/2012 09-035-23
(11)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/19/2012 11-2035-01
(1)  APPENDIX A RE: JOHN BARTH  In the Matter of PacifiCorp’s 2011 Integrated Resource Plan
4/20/2012 11-035-200
(1)  APPENDIX A RE: ARTHUR SANDACK  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/20/2012 11-035-200
(6)  PETITION TO INTERVENE OF IBEW LOCAL 57  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/20/2012 12-035-T05
(3) TARIFF Re: PacifiCorp – The purpose of this filing is to propose changes to the Schedule 96A Dispatchable Irrigation Load Control Credit Rider Program (the “Dispatchable Program”) and phasing out the Schedule 96 Irrigation Load Control Credit Rider Program (the “Schedule Forward Program”) (collectively referred to herein as the “Programs”).
4/20/2012 12-2461-P01
(3) PRICE LIST Re: Veracity Communications, Inc. – These revisions are filed in connection with the FCC Transformation Order, Dated November 18, 2011 which established that default charges for “toll” VoIP-PSTN traffic will be equal to interstate rates applicable to non-VoIP traffic, and default charges for other VoIP-PSTN traffic will be the applicable reciprocal compensation rates.
4/20/2012 12-095-P01
(1) PRICE LIST Re: MCI Communications Services, Inc. – With this filing, Verizon Business discontinues the availability and recharge request option for customers of Verizon Prepaid Phone Card service.
4/20/2012 11-097-01
(1)  EMAIL CORRESPONDENCE FROM LARRY AND SHARON ZINI  In the Matter of the Formal Complaint of James and Dawn Martell; Robert Kimball; Frank and Pat Cumberland; Larry and Sharon Zini; David and Marsha Smith, et al vs. Mountain Sewer Corporation
4/20/2012 12-999-01
(3)  ROCKY MOUNTAIN POWER’S NOTICE OF SOLE SOURCE CONTRACT WITH SAP AMERICA  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/20/2012 12-999-01
(3)  ROCKY MOUNTAIN POWER’S NOTICE OF SOLE SOURCE CONTRACT WITH OSMOSE UTILITIES SERVICES, INC.  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/20/2012 12-999-01
(3)  ROCKY MOUNTAIN POWER’S NOTICE OF SOLE SOURCE CONTRACT WITH NIELS FUGAL SONS COMPANY LLC  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/20/2012 12-999-01
(3)  ROCKY MOUNTAIN POWER’S NOTICE OF SOLE SOURCE CONTRACT WITH LINE INSPECTION SERVICES, INC.  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/20/2012 12-999-01
(3)  ROCKY MOUNTAIN POWER’S NOTICE OF SOLE SOURCE CONTRACT WITH INTECH SERVICES, INC.  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/20/2012 12-999-01
(3)  ROCKY MOUNTAIN POWER’S NOTICE OF SOLE SOURCE CONTRACT WITH CUSTOM LIGHTING SERVICES LLC  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/20/2012 12-043-T01
(1) CORRECTED TARIFF PAGES Re: Gunnison Telephone Company – The FCC has changed the amount of credit or reimbursement to the company for Lifeline and discontinued the Link-Up Program.
4/20/2012 12-2445-01
(9)  NOTICE OF CONSUMMATION  In the Matter of the Joint Application of NextG Networks of California, Inc., NextG Networks, Inc., and Crown Castle Solutions Corp. for the Transfer of Indirect Control of NextG Networks of California to Crown Castle Solutions
4/23/2012 12-035-78
(1)  FORMAL COMPLAINT  In the Matter of the Formal Complaint of South Forty RV Park  against Rocky Mountain Power
4/23/2012 00-035-T07
(11) QUARTERLY REPORT OF THE LOW INCOME LIFELINE PROGRAM FOR THE QUARTER ENDED MARCH 31, 2012 Re: PacifiCorp – In the Matter of Revision’s to PacifiCorp’s Tariff P.S.C.U. No. 43, Re: Addition of Schedules 3 and 91 for the Low Income Lifeline Program and Surcharge for Funding
4/23/2012 07-035-T14
(3) COMMENTS FROM DPU Re: PacifiCorp – In the Matter of the Approval of Rocky Mountain Power’s Tariff P.S.C.U. No. 47, Re: Schedule 107 – Solar Incentive Program
4/23/2012 11-097-03
(1)  CORRESPONDENCE FROM KATHERINE VENTI  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/23/2012 11-097-03
(1)  CORRESPONDENCE FROM RICHARD B. POWELL AND ANNA WILSON  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/23/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM DAVID HALL  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/23/2012 12-057-05
(8)  COMMENTS FROM DPU  In the Matter of the Application of Questar Gas Company for an Adjustment to the 191.1 Balancing Account by Means of a Special One-Time Refund
4/23/2012 10-035-97
(11)  ROCKY MOUNTAIN POWER’S OUTLINE FOR THE APRIL 26, 2012 TECHNICAL CONFERENCE  In the Matter of the Consolidated Applications of Rocky Mountain Power for Approval of Standard Reciprocal and Non-Reciprocal Pole Attachment Agreements
4/24/2012 10-035-97
(1)  UTAH RURAL TELECOM ASSOCIATION’S (URTA) FIRST SET OF DATA REQUESTS TO ROCKY MOUNTAIN POWER  In the Matter of the Consolidated Applications of Rocky Mountain Power for Approval of Standard Reciprocal and Non-Reciprocal Pole Attachment Agreements
4/24/2012 12-999-03
(1)  NOTICE OF BANKRUPTCY FILING FOR TRANS NATIONAL COMMUNICATIONS INTERNATIONAL, INC. (TNCI)  In the Matter of the Miscellaneous Correspondence and Reports Regarding Telecommunications Utility Services; 2012
4/24/2012 12-2550-01
(1)  VERIFIED NOTICE OF EXEMPTION  In the Matter of the Verified Notice of Exemption for Savage, Bingham & Garfield Railroad Company – Trackage Rights Exemption – Elgin, Joliet and Eastern Railway Company
4/24/2012 08-046-01
(1)  REDACTED AMENDED APPLICATION  In the Matter of the Application for the Increase of Rates and Charges by Manti Telephone Company
4/24/2012 08-046-01
(6)  CONFIDENTIAL AMENDED APPLICATION  In the Matter of the Application for the Increase of Rates and Charges by Manti Telephone Company
4/24/2012 12-2457-P02
(3) PRICE LIST Re: Metropolitan Telecommunications of Utah, Inc., d/b/a MetTel – The purpose of this filing is to comply with the Federal Communications Commission in its Report and Order in WC Docket Nos. 10-90, etc., FCC Release No. 11-161 issued November 18, 2011 (“the Order”) and to conform some of the terms and conditions to our FCC and other state tariffs.
4/24/2012 12-2450-P01
(3) PRICE LIST Re: Preferred Long Distance, Inc. – With this filing, Preferred complies with the Federal Communications Commission’s (“FCC”) Report and Order and Further Notice of Proposed Rulemaking, in Docket Nos. WC Docket No. 10-90, et al., FCC 11-161 (the “ICC USF Transitional Order”), by implementing provisions governing Voice over Internet Protocol telephony – Public Switched Telephone Network (“VoIP-PSTN”) Traffic.
4/24/2012 12-999-01 Re: 09-035-20
(11)  ROCKY MOUNTAIN POWER HOURLY QF PURCHASES – FIRST QUARTER 2012  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/25/2012 11-097-03
(1)  CORRESPONDENCE FROM JEFF LARSEN  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/25/2012 11-097-03
(1)  CORRESPONDENCE FROM DEAN VEGOSEN  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/25/2012 12-2211-P04
(1) PRICE LIST Re: TCG Utah – This filing introduces the Business Local Calling (BLC) Package into the PrimePath section of the TCG Local Exchange Services Tariff.
4/25/2012 12-2204-P01
(1) PRICE LIST Re: Qwest Communications Company, LLC – The purpose of this filing is to introduce a new long distance option under the Total Advantage Express Agreement.
4/25/2012 12-2383-P01
(1) PRICE LIST Re: Comcast Phone of Utah, LLC – This filing removes the Link Up America program by order of the Federal Communications Commission.
4/25/2012 12-035-T03
(11) COMMENTS FROM OCS Re: PacifiCorp – The purpose of this filing is to request the removal of the March 31, 2014 expiration from Schedule 192 Self-Direction Credit (the “Self-Direction Credit”) and Schedule 193 Demand-side Management Cost Adjustment (the “DSM Cost Adjustment”)
4/25/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM MARY ELLEN DOMEIER AND PEDER J. PEDERSEN, MANAGERS, TURTLE SHELL PROPERTIES, LLC  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/25/2012 12-035-71
(6)  COMMENTS FROM OCS  In the Matter of the Application of Rocky Mountain Power for Approval of a Strategic Communications and Outreach Program for Demand-Side Management
4/25/2012 12-999-01
(11)  NOTICE OF AFFILIATE TRANSACTION BETWEEN PACIFICORP AND BNSF RAILWAY COMPANY (“BNSF”)  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
4/25/2012 12-2194-01
(6)  COMMENTS FROM DPU  In the Matter of Durfee Creek, Inc., Association’s Request to Cancel Certificate of Public Convenience and Necessity (CPCN) No. 2728
4/25/2012 12-999-03
(5)  CORRESPONDENCE FROM TELEFONICA  In the Matter of the Miscellaneous Correspondence and Reports Regarding Telecommunications Utility Services; 2012
4/26/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM JASON GULL  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/26/2012 12-035-T02
(4) COMMENTS FROM DPU Re: PacifiCorp – The purpose of this filing is to make changes to the Company’s street lighting tariffs that will better clarify provisions of service for street lighting customers and create consistency across the street lighting tariffs.
4/26/2012 12-035-71
(11)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power for Approval of a Strategic Communications and Outreach Program for Demand-Side Management
4/26/2012 12-035-67
(1)  APPENDIX A RE: VICKI M. BALDWIN, J. ROBERT MALKO, WILLIAM J. EVANS, AND F. ROBERT REEDER  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
4/27/2012 12-035-67
(12)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
CONTAINS PROPRIETARY EXHIBITS
4/27/2012 12-057-06
(8)  COMMENTS FROM DPU  In the Matter of the Formal Complaint of McCleary Associates LLC against Questar Gas Company
4/27/2012 12-035-68
(10)  COMMENTS FROM DPU  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account, by Crediting Revenues of Approximately $4.0 Million
4/27/2012 12-035-67
(1)  APPENDIX A RE: MAURICE BRUBAKER, BRIAN COLLINS, AND MARK WIDMER  In the Matter of the Application of Rocky Mountain Power to Increase Rates by $29.3 Million or 1.7 Percent through the Energy Balancing Account
4/27/2012 12-2485-01
(9)  PETITION  In the Matter of the Petition of Sage Telecom, Inc. to Voluntarily Surrender its Certificate of Convenience and Necessity
4/28/2012 11-097-03
(1)  EMAIL CORRESPONDENCE FROM ANDREW WOLCHEK  In the Matter of the Application of Mountain Sewer Corporation for a General Rate Increase
4/30/2012 11-097-01
(1)  EMAIL CORRESPONDENCE FROM DON HARDER  In the Matter of the Formal Complaint of James and Dawn Martell; Robert Kimball; Frank and Pat Cumberland; Larry and Sharon Zini; David and Marsha Smith, et al vs. Mountain Sewer Corporation
4/30/2012 12-035-78
(1)  CORRESPONDENCE FROM SOUTH FORTY RV PARK  In the Matter of the Formal Complaint of South Forty RV Park  against Rocky Mountain Power
4/30/2012 12-035-T03
(3) COMMENTS FROM DPU Re: PacifiCorp – The purpose of this filing is to request the removal of the March 31, 2014 expiration from Schedule 192 Self-Direction Credit (the “Self-Direction Credit”) and Schedule 193 Demand-side Management Cost Adjustment (the “DSM Cost Adjustment”)
4/30/2012 12-999-01
(3)  RESULTS OF OPERATIONS REPORT FOR THE PERIOD ENDING DECEMBER 31, 2011  In the Matter of the Miscellaneous Correspondence and Reports Regarding Electric Utility Services; 2012
CONTAINS A PROPRIETARY EXHIBIT
4/30/2012 11-035-200
(6)  PETITION TO INTERVENE OF AARP  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/30/2012 11-035-200
(11)  CORRECTIONS AND UPDATES TO CERTAIN LIMITED CATEGORIES OF NET POWER COSTS (NPC) FROM ROCKY MOUNTAIN POWER  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
CONTAINS PROPRIETARY EXHIBITS
4/30/2012 11-035-200
(6)  PETITION TO INTERVENE OF THE UTAH FARM BUREAU FEDERATION  In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations
4/30/2012 12-035-57
(11)  ROCKY MOUNTAIN POWER’S DEMAND-SIDE MANAGEMENT 2011 ANNUAL ENERGY EFFICIENCY AND PEAK LOAD REDUCTION REPORT  In the Matter of the DSM Annual Report Filing by Rocky Mountain Pow
4/30/2012 12-035-68
(1)  APPENDIX A RE: MARK WIDMER, F. ROBERT REEDER, AND VICKI M. BALDWIN  In the Matter of the Application of Rocky Mountain Power for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account, by Crediting Revenues of Approximately $4.0 Million
4/30/2012 12-035-78
(11)  COMMENTS FROM DPU  In the Matter of the Formal Complaint of South Forty RV Park  against Rocky Mountain Power
4/30/2012 12-035-31
(1)  CORRESPONDENCE FROM ROCKY MOUNTAIN POWER RE: WITHDRAWAL REQUEST FOR COMMISSION ORDERS  In the Matter of the Termination of Electric Service where Life Support Equipment is Used: Jesse Lee Cornia
4/30/2012 12-035-26
(1)  CORRESPONDENCE FROM ROCKY MOUNTAIN POWER RE: WITHDRAWAL REQUEST FOR COMMISSION ORDERS  In the Matter of the Termination of Electric Service where Life Support Equipment is Used: Alan B. and Shannon White
4/30/2012 12-035-41
(1)  CORRESPONDENCE FROM ROCKY MOUNTAIN POWER RE: WITHDRAWAL REQUEST FOR COMMISSION ORDERS  In the Matter of the Termination of Electric Service where Life Support Equipment is Used: Clarke B. Lium
4/30/2012 12-035-56
(1)  CORRESPONDENCE FROM ROCKY MOUNTAIN POWER RE: WITHDRAWAL REQUEST FOR COMMISSION ORDERS  In the Matter of the Termination of Electric Service where Life Support Equipment is Used: Connie J. Herrera